|本期目录/Table of Contents|

[1]张勇昌,杨永国,罗金辉.基于优化组合赋权的煤层气开发风险评价研究[J].中国安全生产科学技术,2016,12(5):91-97.[doi:10.11731/j.issn.1673-193x.2016.05.016]
 ZHANG Yongchang,YANG Yongguo,LUO Jinhui.Study on risk assessment of CBM development based on optimized combination weighting[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2016,12(5):91-97.[doi:10.11731/j.issn.1673-193x.2016.05.016]
点击复制

基于优化组合赋权的煤层气开发风险评价研究
分享到:

《中国安全生产科学技术》[ISSN:1673-193X/CN:11-5335/TB]

卷:
12
期数:
2016年5期
页码:
91-97
栏目:
现代职业安全卫生管理与技术
出版日期:
2016-05-30

文章信息/Info

Title:
Study on risk assessment of CBM development based on optimized combination weighting
作者:
张勇昌12杨永国1罗金辉1
(1.中国矿业大学 资源与地球科学学院,煤层气资源与成藏过程教育部重点实验室,江苏 徐州 221116;2.江苏建筑学院,江苏 徐州 221116)
Author(s):
ZHANG Yongchang12YANG Yongguo1LUO Jinhui1
(1. School of Resource and Earth Science, Key Laboratory of CBM Resources and Reservoir Formation Process of Ministry of Education, China University of Mining and Technology, Xuzhou Jiangsu 221116, China; 2. Jiangsu Jianzhu Institute, Xuzhou Jiangsu 221116, China)
关键词:
煤层气风险评价熵值法离差平方和最大三角模糊数
Keywords:
coalbed methane(CBM) risk assessment entropy value method maximum sum of squares of deviations triangular fuzzy number
分类号:
X913.4
DOI:
10.11731/j.issn.1673-193x.2016.05.016
文献标志码:
A
摘要:
煤层气开发项目的高风险制约着我国煤层气产业的发展,为此,通过对煤层气开发风险因素的分析,基于煤层气开发特征构建由7个一级指标和34个二级指标构成的风险评价体系。运用离差平方和优化组合熵值法和三角模糊数法所得权重确定指标最佳权重,建立煤层气开发风险评价模型。最后,以沁水盆地南部柿庄南区块煤层气井为例进行实证评价,结果显示地质资源因素对该地区煤层气开发影响最大,其中渗透率的影响最为显著。研究表明:模型能优化主观评价和客观评价的赋权比重,最大化的减少主观因素对评价结果的影响,能客观合理的表达多指标间的对比差异,对煤层气开发风险进行可靠的定量化评价。为煤层气开发风险的控制和规避提供科学的理论依据。
Abstract:
The high risk of coalbed methane (CBM) development project restricts the development of CBM industry in China. Through the analysis on risk factors of CBM development, an risk assessment system consisted of 7 first-grade indexes and 34 second-grade indexes was established based on the characteristics of CBM development. The optimal weight of indexes was determined based on the weights obtained by combining entropy value method with triangular fuzzy number method and optimized by sum of squares of deviations, and a risk evaluation model of CBM development was constructed. Finally, the practical case assessment was conducted by taking the CBD well in south block of Shizhuang in southern Qinshui basin. The results showed that the geological resource factor had the largest influence on CBM development in this region, among which the influence of permeability was the most obvious. It showed that the model can optimize the weighting proportion of subjective and objective assessment, reduce the influence of subjective factors on assessment results to the most, represent the contrast difference of multiple indexes objectively and reasonably, and carry out reliable quantification assessment of CBM development risk. It can provide scientific theoretical basis for the control and avoidance of CBM development risk.

参考文献/References:

[1]秦勇,袁亮,胡千庭,等.我国煤层气勘探与开发技术现状及发展方向[J].煤炭科学技术,2012,40(10):1-6. QIN Yong, YUAN Niang, HU qianting, et al.Status and development orientation of coalbed methane exploration and development technology in China[J]. Coal Science and Technology, 2012, 40 (10):1-6.
[2]贾承造,郑民,张永峰.中国非常规油气资源与勘探开发前景[J].石油勘探与开发,2012,39(2):129-136. JIA Chengzao, ZHENG Min, ZHANG Yongfeng. Unconventional hydrocarbon resources in China and the prospect of exploration and development [J]. Petroleum Exploration and Development, 2012,39(2): 129-136.
[3]Vanorsdale C. R., Hickman T. S., ASSOCS. Evaluation of Initial Reservoir Data to Estimate Devonian Shale Gas Reserves. MS SPE Conference Paper,1991.
[4]Senthil B.. Economic Feasibility of Coalbed Methane Projects using Monte-Carlo and hypercube simulation [D]. Mississippi State:Mississippi State University, 1994.
[5]孙茂远.煤层气发展需”加油清障” [J].中国投资,2014(12):60-62. SUN Maoyuan. CBM development needs " refueling and wrecker"[J]. China Investment, 2014(12):60-62.
[6]杨永国,秦勇,姜波.煤层气项目经济评价理论与方法研究[M].徐州:中国矿业大学出版社,2001.
[7]夏良玉,罗东坤,代由进.煤层气开发项目风险评估方法[J]. 天然气工业,2012,32(3):117-120. XIA Liangyu, LUO Dongkun, DAI Youjing. Risk evaluation methods of CBM development projects[J]. Natural Gas Industry, 2012, 32(3): 117-120.
[8]吕玉民,汤达祯,李治平,等.煤层气井动态产能拟合与预测模型[J].煤炭学报,2011,36(9):1481-1485. LU Yumin, TANG Dazhen, LI Zhiping, et al. Fitting and predicting models for coalbed methane wells dynamic productivity[J].Journal of China Coal Society,2011, 36(9): 1481-1485.
[9]Michinov N. Social comparison perceived control and occupational burnout arm’s psychology [J].An International Review, 2005(54),99-118.
[10]汪伟忠,卢明银.煤矿作业人员系统风险知觉能力量化分析[J].中国安全生产科学技术,2015,11(8):152-156. WANG Weizhong, LU Mingyin. Quantitative analysis on perceptual ability of systematic risk for coal miners[J]. Journal of Safety Science and Technology, 2015,11(8):152-156.
[11]YANG Yongguo, CHEN Yuhua, QIN Yong. Monte-carlo method for coalbed methane resource assessment in key coal mining areas of China[J].Journal of China University of Geosciences, 2008,19: 429-435.
[12]迟国泰, 王钰娟, 刘艳萍. 基于三角模糊熵的经济评价模型及副省级城市的实证研究[J].运筹与管理,2010,19(5):107-116. CHI Guotai, WANG Yujuan, LIU Yanping. Economic assessment model based on fuzzy entropy and empirical analysis of sub-provincial cities [J]. Operations Research and Management Science, 2010, 19(5):107-116.
[13]陈玉华. 基于DEA的煤层气经济评价模型研究[D].徐州:中国矿业大学,2010.
[14]陈兵替,王建中,谢友友,等.煤层气开采过程安全风险分析[J].中国煤层气,2011,8(3):44-46. CHEN Bingti, WANG Jianzhong, XIE Youyou, et al. Analysis of safety risks in CBM recovery process [J]. China Coalbed Methane, 2011, 8(3):44-46.
[15]Detilleux J., Theron L., Benduin J. M..A Structural equation model to evaluate direct and indirect factors associated with a latent measure of mastitis in belgian dairy herds[J].Preventive Veterinary Medicine,2012, 107(3-4): 170-179.
[16]PAN Yichao , TONG Hengqing , SHAN Wei ,et al. Evaluation of social risk using structural equation model[J].Business,2010,2(2):188-192.
[17]刘海滨.基于ART-2人工神经网络的煤矿安全风险评价[J].中国安全生产科学技术,2014,10(2): 81-85. LIU Haibin. Coal mine safety risk assessment based on ART-2 neural network[J]. Journal of Safety Science and Technology,2014,10(2) : 81-85.
[18]蔡益栋,刘大锰,姚艳斌,等.鸡西盆地煤层气控气地质特征及有利区分布[J].吉林大学学报(地球科学版),2014,44(6):1779-1788 . CAI Yidong, LIU Dameng, YAO Yanbin, et al. Geological controlling factors and prospective areas of coalbed methane in Jixi Basin[J]. Journal of Jilin University(Earth Science Edition),2014,44(6): 1779-1788.

相似文献/References:

[1]张晓,张钢.船上劳动安全风险辨识研究[J].中国安全生产科学技术,2011,7(3):161.
 ZHANG Xiao,ZHANG Gang.A study on risk identification of shipboard working safety[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2011,7(5):161.
[2]许红军,田俊改.支线机场安全动态预警技术研究[J].中国安全生产科学技术,2011,7(5):123.
 XU Hong-jun,TIAN Jun-gai.Dynamic hazard identification and evaluation techniques for regional airport safety and security[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2011,7(5):123.
[3]高旭,张圣柱,杨国梁,等.风险沟通研究进展综述[J].中国安全生产科学技术,2011,7(5):148.
 GAO Xu,ZHANG Sheng-zhu,YANG Guo-liang,et al.Overview on reseach status of risk communication[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2011,7(5):148.
[4]倪红兵.运用危险源控制方法改进职业健康安全管理的有效性[J].中国安全生产科学技术,2011,7(7):187.
 Ni Hong-bing.Thorough Using the Hazard Identification and Risk Assessment method to Continual Improvement the Effectiveness of Occupational Health and Safety Management[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2011,7(5):187.
[5]王长建,陈刚.风险因子模糊评价法在钻机安全评价中的应用[J].中国安全生产科学技术,2011,7(9):149.
 WANG Chang-jian,CHEN Gang.The Applications of Risk Factor Fuzzy Evaluation Method(RFEM)to Risk Assessment of Drilling Rig[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2011,7(5):149.
[6]石荣,李明捷.变权综合法在航空公司风险评价中的应用研究[J].中国安全生产科学技术,2011,7(10):143.
 SHI Rong,LI Ming-jie.Application of variable weight synthetic evaluation method in safety assessment of SMS of civil aviation[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2011,7(5):143.
[7]巫志鹏,白永忠,林景喜.新化工装置风险评价方法的研究[J].中国安全生产科学技术,2011,7(10):154.
 WU Zhi-peng,BAI Yong-zhong,LIN Jing-xi.Study on the methods of hazard risk assessment for new facilities[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2011,7(5):154.
[8]徐吉辉,姜帆,张亮.基于SEFA的现役装备改进风险评价指标体系研究[J].中国安全生产科学技术,2012,8(3):53.
 XU Ji hui,JIANG Fan,ZHANG Liang.Research on evaluation index system of active equipment improvement risk[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2012,8(5):53.
[9]张蒙,冯福亮.成品油库临时性常规作业管理现状分析及改进措施[J].中国安全生产科学技术,2012,8(11):216.
 ZHANG Meng,FENG Fu liang.Present situation analysis and improvement measurement for management of the occasional conventional operation in oil tankfarm[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2012,8(5):216.
[10]汪长永,杨卫,殷焕召,等.模糊综合评价法在油气管道跨越工程风险评价中的应用[J].中国安全生产科学技术,2010,6(3):143.
 WANG Chang-yong,YANG Wei,YIN Huan-zhao,et al.Application of fuzzy comprehensive evaluation in risk evaluation of pipeline crossing engineering[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2010,6(5):143.

备注/Memo

备注/Memo:
国家自然科学基金项目(41372342,41402291);江苏建筑学院科研项目(JYA14-26)
更新日期/Last Update: 2016-06-17