[1]杨春和,张超.尾矿坝安全评价与病患治理[M].武汉:湖北人民出版社,2006.
[2]MOTAMED R,TOWHATA R.Shaking table model tests on pile groups behind quay walls subjected to lateral spreading [J].Journal of Geotechnical & Geoenvironmental Engineering,2010,136(3):477-489.
[3]夏禄清,李林.白马铁矿万年沟尾矿库安全运行实践[J].现代矿业,2015,31(9):168-169,199.XIA Luqing,LI Lin.Safe operation practice of wanniangou tailings reservoir in Baima iron mine [J].Modern Mining,2015,31(9):168-169,199.
[4]WROTH C P.The interpretation of in situ soil tests [J].Geotechnique,2015,34(4):449-489.
[5]ANNO.The stava tailings dams failure,Italy,July 1985 [J].International Journal of Rock Mechanics & Mining Science & Geomechanics Abstracts,1995,33(1):35A.
[6]于广明,宋传旺,潘永战,等.尾矿坝安全研究的国外新进展及我国的现状和发展态势[J].岩石力学与工程学报,2014,33(S1):3238-3248.YU Guangming,SONG Chuanwang,PAN Yongzhan,et al.The new foreign progress of tailings dam safety research and the current situation and development trend in my country[J].Chinese Journal of Rock Mechanics and Engineering,2014,33(S1):3238-3248.
[7]YIN G,LI G,WEI Z,et al.Stability analysis of a copper tailings dam via laboratory model tests:a Chinese case study [J].Minerals Engineering,2011,24(2):122-130.
[8]吴大明,刘志文,朱锐,等.巴西尾矿库溃坝事故初步总结与分析[J].中国安全生产,2019,14(4):58-59.WU Daming,LIU Zhiwen,ZHU Rui,et al.Preliminary summary and analysis of dam failure accident of tailings pond in Brazil [J].China Occupational Safety and Health,2019,14(4):58-59.
[9]PENMAN A.Tailings dams-risk of dangerous occurrences-lessons learnt from past experiences [C]//Paris Commission Internationale des Grands Barrages,2001.
[10]MA C,ZHANG C,CHEN Q,et al.On the effect of void ratio and particle breakage on saturated hydraulic conductivity of tailing materials [J].Geomechanics and Engineering,2021,25(2):159-170.
[11]张超,杨春和.粗粒料强度准则与排土场稳定性研究[J].岩土力学,2014,35(3):641-646.ZHANG Chao,YANG Chunhe.Investigation on strength criterion of coarse grained material and stability analysis of waste dump [J].Rock and Soil Mechanics,2014,35(3):641-646.
[12]中华人民共和国住房和城乡建设部.土工试验方法标准:GB/T 50123—2019[S].北京:中国计划出版社,2019.
[13]HARDIN B O.Crushing of soil particles [J].Journal of Geotechnical Engineering,1985,111(10):1177-1192.
[14]LEE K L,FARHOOMAND I.Compressibility and crushing of granular soil in anisotropic triaxial compression[J].Can.geotech.j,1967,4(1):68-86.
[15]EINAV I.Breakage mechanics—Part I:Theory[J].Journal of the Mechanics and Physics of Solids,2007,55(6):1274-1297.
[16]ALTUHAFI F,SULLIVAN C,CAVARRETTA I.Analysis of an image-based method to quantify the size and shape of sand particles[J].Journal of Geotechnical & Geoenvironmental Engineering,2012,139(8):1290-1307.
[17]HACHEY J,BEEN K,JEFFERIES M G.The critical state of sands[J].Geotechnique,1991,41(3):365-381.
[18]LEE D M.The angles of friction of granular fills[D].Cambridge:University of Cambridge,1992.
[19]刘海明,杨春和,张超,等.高压下尾矿材料幂函数型摩尔强度特性研究[J].岩土力学,2012,33(7):1986-1992.LIU Haiming,YANG Chunhe,ZHANG Chao,et al.Study of characteristics of power function Mohr strength criterion for tailings material under high pressures [J].Rock and Soil Mechanics,2012,33(7):1986-1992.
[20]陈青林.高堆尾矿细粒夹层异质性与粗粒破碎效应研究 [D].重庆:重庆大学,2020.
[21]王凤江.上游法高尾矿坝的抗震问题[J].冶金矿山设计与建设,2001(5):10-13.WANG Fengjiang.Anti-seismic problem of tall tailing dam constructed with upstream method [J].Metal Mine Design and Construction,2001(5):10-13.
[22]潘建平,王宇鸽,曾庆筠,等.高应力作用下尾砂非线性剪切强度特性研究[J].工业建筑,2015,45(2):80-84.PAN Jianping,WANG Yuge,ZENG Qingyun,et al.Study of nonlinear shear strength characteristics of tailings sand under high stresses [J].Industrial Construction,2015,45(2):80-84.
[1]胡平安,韩森.基于JC法尾矿坝稳定性可靠度研究[J].中国安全生产科学技术,2010,6(4):56.
HU Ping-an,HAN Sen.Reach on reliability of Tailing dam stability based on JC methed[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2010,6(2):56.
[2]李亮,孟浩,全超,等.上游式筑坝法尾矿坝的安全系数随堆筑坝高变化分析[J].中国安全生产科学技术,2011,7(7):31.
Li Liang,Meng Hao,Quan Chao,et al.Study on the variation of factor of safety with the dam height for the tailing dam from upstream embankment method[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2011,7(2):31.
[3]胡文志,马海涛,谢振华,等.三维高密度电法在尾矿库隐患检测中的应用[J].中国安全生产科学技术,2011,7(9):64.
HU Wen-zhi,MA Hai-tao,XIE Zhen-hua,et al.Application of three dimensional high-density resistivity method in hidden danger detection of Tailings[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2011,7(2):64.
[4]李亮,褚雪松.浸润线深度对尾矿坝稳定性分析的影响研究[J].中国安全生产科学技术,2011,7(11):20.
LI Liang,CHU Xue-song.Study on the effect of phreatic line depth on the evaluation of slope stability for tailing dam[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2011,7(2):20.
[5]李明,梁力,王伟,等.用有限元强度折减法求解坝坡抗滑稳定安全系数[J].中国安全生产科学技术,2012,8(2):83.
LI Ming,LIANG Li,WANG Wei,et al.Study on antiskiding stability safety factor of dam slope by shear strength reduction finite element methods[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2012,8(2):83.
[6]魏〓勇,许开立.集对分析法在尾矿坝稳定性安全评价中的应用[J].中国安全生产科学技术,2012,8(9):101.
WEI Yong,XU Kai li.Application of set pair analysis on safety evaluation of tailing dam stability[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2012,8(2):101.
[7]赵小稚.尾矿坝变形规律的灰色Verhulst预测[J].中国安全生产科学技术,2012,8(11):90.
ZHAO Xiao zhi.Grey verhulst prediction on the deformation law of tailing dam[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2012,8(2):90.
[8]潘建平,刘湘平,朱洪威,等.尾矿坝地震液化评价可靠度模型及应用[J].中国安全生产科学技术,2013,9(2):23.
PAN Jian ping,LIU Xiang ping,ZHU Hong wei,et al.Reliability model of seismic liquefaction evaluation for tailings dam and its application[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2013,9(2):23.
[9]马海涛,吴永锋,王云海,等.尾矿坝浸润线的坝面快速观测方法研究[J].中国安全生产科学技术,2010,6(1):31.
MA Hai-tao,WU Yong-feng,WANG Yun-hai,et al.Study on surface exploration meth of phreatic line of tailing dam[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2010,6(2):31.
[10]詹京晶,肖田元.基于GPS数据的尾矿坝监测系统的研究与应用[J].中国安全生产科学技术,2013,9(4):5.[doi:10.11731/j.issn.1673-193x.2013.04.001]
ZHAN Jing jing,XIAO Tian yuan.Research and application of monitoring system for tailings dam based on GPS data[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2013,9(2):5.[doi:10.11731/j.issn.1673-193x.2013.04.001]