|本期目录/Table of Contents|

[1]潘建平,刘湘平,朱洪威,等.尾矿坝地震液化评价可靠度模型及应用[J].中国安全生产科学技术,2013,9(2):23.
 PAN Jian ping,LIU Xiang ping,ZHU Hong wei,et al.Reliability model of seismic liquefaction evaluation for tailings dam and its application[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2013,9(2):23.
点击复制

尾矿坝地震液化评价可靠度模型及应用
分享到:

《中国安全生产科学技术》[ISSN:1673-193X/CN:11-5335/TB]

卷:
9
期数:
2013年2期
页码:
23
栏目:
学术论著
出版日期:
2013-02-28

文章信息/Info

Title:
Reliability model of seismic liquefaction evaluation for tailings dam and its application
作者:
潘建平1刘湘平1朱洪威1徐水太2
(1.江西理工大学建筑与测绘工程学院,江西赣州341000; 2.江西理工大学经济管理学院,江西赣州341000)
Author(s):
PAN Jianping1 LIU Xiangping1 ZHU Hongwei1 XU Shuitai2
(1.Jiangxi University of Science and Technology, Ganzhou Jiangxi 341000, China; 2.Jiangxi University of Science and Technology, Ganzhou Jiangxi 341000, China)
关键词:
尾矿坝液化评价可靠度一次二阶矩法
Keywords:
tailings dam liquefaction evaluation reliability firstorder secondmoment method
分类号:
TV641;TD926
DOI:
-
文献标志码:
A
摘要:
为适应计算参数本身具有的随机性和未确知性,将可靠度理论引入尾矿坝地震液化评价中。以测试数据的统计分析结果为基础,应用一次二阶矩法建立尾矿坝地震液化分析可靠度模型,探讨了可靠度指标与抗液化安全系数之间的关系,并将该模型应用到某尾矿坝地震液化分析中。结果表明,新建可靠度模型各参数的物理意义与统计指标明确,相比传统的确定性分析方法,不仅能判断液化的发生与否,还能给出液化发生的概率;可靠度理论在液化分析中能更好地考虑计算参数的变异性,进一步完善了尾矿坝地震液化分析理论,为进行基于风险分析的尾矿坝抗震设计和地震安全评价提供更全面的依据。
Abstract:
In order to consider the randomness and uncertainty of calculation parameters, reliability theory was introduced into seismic liquefaction evaluation for tailings dam. Based on the statistic analysis of test datum, a model for evaluating tailings dam liquefaction probability was developed using the method of FirstOrder SecondMoment. The relationship between the reliability index with antiliquefaction factor of safety was explored, and the model was applied to a tailings dam seismic liquefaction evaluation also. The results showed that the physical meaning of the model parameters and statistical indices of the model is specific. Comparing traditionally determinate analysis method, the new model not only can differentiate whether liquefaction takes place or not, but also can present liquefaction probability. Reliability theory in the liquefaction evaluation can better consider the parameter uncertainty, and improve the tailings dam seismic liquefaction evaluation theory, which provides more comprehensive basis for antiseismic design and seismic safety evaluation of tailings dam based on risk analysis.

参考文献/References:

-

相似文献/References:

[1]李亮,孟浩,全超,等.上游式筑坝法尾矿坝的安全系数随堆筑坝高变化分析[J].中国安全生产科学技术,2011,7(7):31.
 Li Liang,Meng Hao,Quan Chao,et al.Study on the variation of factor of safety with the dam height for the tailing dam from upstream embankment method[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2011,7(2):31.
[2]胡文志,马海涛,谢振华,等.三维高密度电法在尾矿库隐患检测中的应用[J].中国安全生产科学技术,2011,7(9):64.
 HU Wen-zhi,MA Hai-tao,XIE Zhen-hua,et al.Application of three dimensional high-density resistivity method in hidden danger detection of Tailings[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2011,7(2):64.
[3]李明,梁力,王伟,等.用有限元强度折减法求解坝坡抗滑稳定安全系数[J].中国安全生产科学技术,2012,8(2):83.
 LI Ming,LIANG Li,WANG Wei,et al.Study on antiskiding stability safety factor of dam slope by shear strength reduction finite element methods[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2012,8(2):83.
[4]李亮,褚雪松.浸润线深度对尾矿坝稳定性分析的影响研究[J].中国安全生产科学技术,2011,7(11):20.
 LI Liang,CHU Xue-song.Study on the effect of phreatic line depth on the evaluation of slope stability for tailing dam[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2011,7(2):20.
[5]魏〓勇,许开立.集对分析法在尾矿坝稳定性安全评价中的应用[J].中国安全生产科学技术,2012,8(9):101.
 WEI Yong,XU Kai li.Application of set pair analysis on safety evaluation of tailing dam stability[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2012,8(2):101.
[6]赵小稚.尾矿坝变形规律的灰色Verhulst预测[J].中国安全生产科学技术,2012,8(11):90.
 ZHAO Xiao zhi.Grey verhulst prediction on the deformation law of tailing dam[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2012,8(2):90.
[7]胡平安,韩森.基于JC法尾矿坝稳定性可靠度研究[J].中国安全生产科学技术,2010,6(4):56.
 HU Ping-an,HAN Sen.Reach on reliability of Tailing dam stability based on JC methed[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2010,6(2):56.
[8]马海涛,吴永锋,王云海,等.尾矿坝浸润线的坝面快速观测方法研究[J].中国安全生产科学技术,2010,6(1):31.
 MA Hai-tao,WU Yong-feng,WANG Yun-hai,et al.Study on surface exploration meth of phreatic line of tailing dam[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2010,6(2):31.
[9]詹京晶,肖田元.基于GPS数据的尾矿坝监测系统的研究与应用[J].中国安全生产科学技术,2013,9(4):5.[doi:10.11731/j.issn.1673-193x.2013.04.001]
 ZHAN Jing jing,XIAO Tian yuan.Research and application of monitoring system for tailings dam based on GPS data[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2013,9(2):5.[doi:10.11731/j.issn.1673-193x.2013.04.001]
[10]秦晓鹏,陈立宏,孙洪月,等.基于拟静力法和有限差分法的细砂尾矿坝动力稳定性分析与评价[J].中国安全生产科学技术,2013,9(12):46.[doi:10.11731/j.issn.1673-193x.2013.12.007]
 QIN Xiao peng,CHEN Li hong,SUN Hong yue,et al.Analysis and evaluation on dynamic stability of sand tailings dam based on pseudostatic method and finite difference method[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2013,9(2):46.[doi:10.11731/j.issn.1673-193x.2013.12.007]

备注/Memo

备注/Memo:
国家自然科学基金资助项目(51204076);江西省自然科学基金项目资助(20114BAB216011);江西省教育厅科学技术研究项目资助(GJJ12340,GJJ09516)
更新日期/Last Update: 2013-02-28