[1]娄伟.情景分析理论与方法[M].北京:社会科学文献出版社,2012.
[2]KAHN H,WIENER A.The year 2000:A framework for speculation on the next thirty-three years [M].London:The Macmillan Company,1967.
[3]ERIKSEN,N J.Scenario methodology in natural hazards research[D].Boulder:Institute of Behavioral Science,University of Colorado,1975.
[4]PIJNENBURG B,DUIN M J V.The zeebrugge ferry disaster:elements of a communication and information processes scenario[J].Contemporary Crises,1990(14):321-349.
[5]YOKOYAMA I.A scenario of the 1883 Krakatoa tsunami[J].Journal of Volcanology and Geothermal Research,1987(25):157-174.
[6]RINGLAND G.Scenario planning:managing for the future[M].New York:John Wiley & Sons,1998.
[7]UNDHA.Strategic aspects of geological and seismic disaster management and disaster scenario planning[R].New York:United Nations Department of Humanitarian Affairs,1993.
[8]RMS.What if the 1906 Earthquake Strikes Again?A San Francisco Bay Area Scenario[R].Menlo Park:Risk Management Solutions,Inc.,1995.
[9]RMS.What if the 1923 Earthquake Strikes Again?A San Francisco Bay Area Scenario[R].Menlo Park:Risk Management Solutions,Inc.,1995.
[10]U.S.DHS.National planning scenarios[R].Washington DC:Department of Homeland Security,2006.
[11]U.S.DHS.Universal task list (V2.1)[R].Washington DC:Department of Homeland Security,2005.
[12]U.S.DHS.National preparedness guidelines[R]Washington DC:Department of Homeland Security,2017.
[13]BBK,L?KEX general information[R].Berlin:Federal Office of Civil Protection and Disaster Assistance,2013.
[14]CRN,CSS ETH Zürich.Using scenarios to assess risks:Examining trends in the public sector[R].Zürich:Crisis and Risk Network,Center for Security Studies ETH Zürich,2011.
[15]刘铁民.应急预案重大突发事件情景构建——基于“情景-任务-能力”应急预案编制技术研究之一[J].中国安全生产科学技术,2012,8(4):5-12.
LIU Tiemin.Studies on scenes’ construction of emergency planning——Part II of emergency planning technology based on “Scene-Task-Ability” [J].Journal of Safety Science and Technology,2012,8(4):5-12.
[16]刘铁民.应急准备任务设置与应急响应能力建设——基于“情景-任务-能力”应急预案编制技术研究之二[J].中国安全生产科学技术,2012,8(10):5-13.
LIU Tiemin.Studies on setting of emergency preparedness task and building of emergency response capacity ——Part II of emergency planning technology based on“Scene-Task-Ability” [J].Journal of Safety Science and Technology,2012,8(10):5-13.
[17]王永明.重大突发事件情景构建理论框架与技术路线[J].中国应急管理,2015(8):53-57.
WANG Yongming.The frame and technical flowchart of the theory on scenario building of major emergencies[J].China Emergency Management,2015(8):53-57.
[18]BZK.National risk assessment method guide[R].Amstenlam:Ministry of the Interior and Kingdom Relations,2008.
[19]DEMA.Introduction and user guide.DEMA’s model for risk and vulnerability analysis[R].Copenhagen:Danish Emergency Management Agency,2006.
[20]BBK.Method of risk analysis for civil protection[R].Berlin:Federal Office of Civil Protection and Disaster Assistance,2011.
[21]Cabinet Office.National security risk assessment[R].London:UK Cabinet Office,2010.
[22]ISO.Risk Management Guidelines:ISO31000—2018[S].Geneva:The International Organization for Standardization,2018.
[1]张启波,王兰芝.丙烯腈装置安全预警及控制技术研究[J].中国安全生产科学技术,2010,6(4):114.
ZHANG Qi-bo,WANG Lan-zhi.Research on safety prior-warning and control technology of acrylonitrile plant[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2010,6(9):114.
[2]何雪松.地铁大断面隧道盾构过江风险分析及数值模拟[J].中国安全生产科学技术,2010,6(3):33.
HE Xue-song.Risk analysis and numerical simulation on large cross-section shielding tunnel through river[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2010,6(9):33.
[3]都书海.工作安全分析在管理实践中的应用[J].中国安全生产科学技术,2011,7(7):204.
DU Shu-hai.Theory and application of JSA management in practice[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2011,7(9):204.
[4]曹涛,张华兵,周利剑,等.HAZOP在油气管道站场风险分析中的应用实践[J].中国安全生产科学技术,2011,7(10):129.
CAO Tao,ZHANG Hua-bing,ZHOU Li-jian,et al.Application of HAZOP study in risk analysis of pipeline station[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2011,7(9):129.
[5]刘铁民.应急预案重大突发事件情景构建*
——基于“情景-任务-能力”应急预案编制技术研究之一[J].中国安全生产科学技术,2012,8(4):5.
LIU Tie min.Studies on scenes’ construction of emergency planning
——part I of emergency planning technology based on “scenetaskability”[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2012,8(9):5.
[6]黄勇,陈海群,王凯全.Fault Tree+软件在长输天然气管道定量风险分析中的应用[J].中国安全生产科学技术,2013,9(1):92.
HUANG Yong,CHEN Hai qun,WANG Kai quan.Application of Fault Tree + software for quantitative risk analysisof long distance natual gas pipeline[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2013,9(9):92.
[7]程民生.火电厂脱硝工程液氨泄漏事故风险分析[J].中国安全生产科学技术,2013,9(2):140.
CHENG Min sheng.Risk analysis of the liquid ammonia leakage accident
in the DeNOx system of themal power plant[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2013,9(9):140.
[8]花迎春,邹葆华,田玲玲.航空维修系统危险源识别和风险分析方法[J].中国安全生产科学技术,2013,9(3):104.[doi:10.11731/j.issn.1673-193x.2013.03.18]
HUA Ying chun,ZOU Bao hua,TIAN Ling ling.Method of hazard recognition and risk analysis in aviation maintenance system[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2013,9(9):104.[doi:10.11731/j.issn.1673-193x.2013.03.18]
[9]彭鹏,赵东风.基于风险的化工园区企业准入框架分析[J].中国安全生产科学技术,2013,9(4):104.[doi:10.11731/j.issn.1673-193x.2013.04.019]
PENG Peng,ZHAO Dong feng.Study on access of enterprises in chemical parks based on risk[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2013,9(9):104.[doi:10.11731/j.issn.1673-193x.2013.04.019]
[10]方来华.危化品生产储存使用全过程安全监控与监管系统[J].中国安全生产科学技术,2013,9(7):114.[doi:10.11731/j.issn.1673-193x.2013.07.020]
FANG Lai hua.Safety system for monitoring and management on production, storage and use
of hazardous chemicals[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2013,9(9):114.[doi:10.11731/j.issn.1673-193x.2013.07.020]