[1]韩豫,陈亮,成虎.大型公共建筑风险的系统分析[J].现代城市研究,2010,25(10):92-96.
HAN Yu,CHEN Liang,CHENG Hu.Systematic analysis of large-scale public building’s risk[J].Modern Urban Research, 2010,25(10):92-96.
[2]熊自明,卢浩,王明洋,等.我国大型岩土工程施工安全风险管理研究进展[J].岩土力学,2018,39(10):3703-3716.
XIONG Ziming,LU Hao,WANG Mingyang,et al.Research progress on safety risk management for large scale geotechnical engineering construction in China[J].Rock and Soil Mechanics,2018,39(10):3703-3716.
[3]BROWN, VALERIE J. Risk perception [J]. Environmental Health Perspectives,2014.
[4]KOUABENAN, DONGO RMI. Role of beliefs in accident and risk analysis and prevention[J].Safety Science,2009,47(6):767-776.
[5]黄浪,吴超.风险感知偏差机理概念模型构建研究[J].自然灾害学报,2017,24(6):109-115.
HUANG Lang,WU Chao.Conceptual modelling of risk perception deviation mechanism[J].Journal of Natural Disasters, 2017,24(6):109-115.
[6]龚萍.不同知识背景的消费者对转基因食品的风险感知机理研究[D].武汉:华中农业大学,2018.
[7]王传连.生理因素对驾驶人行为及风险感知影响研究综述[J].中国安全生产科学技术,2018,14(4):155-159.
WANG Chuanlian. Review of research on effect of physiological factors on behavior and risk perception of drivers[J].Journal of Safety Science and Technology, 2018,14(4):155-159.
[8]江新,孙正熙,徐平,等.水电工程施工阶段应急管理系统脆弱性评价[J].中国安全生产科学技术,2016,12(11):142-147.
JIANG Xin,SUN Zhengxi,XU Ping,et al.Vulnerability evaluation on emergency management system in construction stage of hydropower engineering[J]. Journal of Safety Science and Technology, 2016,12(11):142-147.
[9]向鹏成,李佳.跨区域重大工程项目脆弱性研究[J]. 系统工程理论与实践,2016,36(9):2383-2390.
XIANG Pengcheng,LI Jia. Research on system vulnerability of interregional large-scaleconstruction projects[J].Systems Engineering-Theory & Practice,2016,36(9):2383-2390.
[10]季闯,黄伟,袁竞峰,等.基础设施PPP项目脆弱性评估方法[J].系统工程理论与实践,2016,36(3):613-622
JI Chuang,HUANG Wei,YUAN Jingfeng,et al.Vulnerability evaluation method of infrastructure PPP project[J].Systems Engineering-Theory & Practice,2016,36(3):613-622.
[11]GALLOPN G C. A systemic synthesis of the relations between vulnerability, hazard, exposure and impact, aimed at policy identification[M]. Mexico :ECLAC, 2003.
[12]洪坤. 复杂长竖井长距离引水隧洞施工进度风险分析与仿真优化研究[D].天津:天津大学,2016.
[13]江新,杜海文,袁轩,等.神经网络范式下硐室群施工安全风险预警研究[J].中国安全科学学报,2018,28(2):181-186.
JIANG Xin,DU Haiwen,YUAN Xuan,et al. Study on early warning of safety risk inunderground cavern group construction under neural network paradigm [J]. China Safety Science Journal,2018,28(2):181-186.
[14]张红艳,高鹏.水利水电工程安全管理风险分析及对策[J].中国安全生产科学技术,2017,13(S2):89-92.
ZHANG Hongyan,GAO Peng.Risk analysis and countermeasures of water resources and hydropower engineering safety management[J].Journal of Safety Science and Technology,2017,13(S2):89-92.
[15]马蓉. 基于ISM方法和物元模型的海外跨境高铁项目风险评价研究[D].成都:西南交通大学,2017.
[1]刘铁民.事故灾难成因再认识——脆弱性研究[J].中国安全生产科学技术,2010,6(5):5.
LIU Tie-min.Recognition of disaster causes—study of the vulnerability[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2010,6(3):5.
[2]刘铁民.火灾频发暴露我国城市公共安全系统脆弱性[J].中国安全生产科学技术,2011,7(3):5.
LIU Tie-min.The frequent fire accidents exposed the vulnerability of urban public safety system[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2011,7(3):5.
[3]高旭,张圣柱,杨国梁,等.风险沟通研究进展综述[J].中国安全生产科学技术,2011,7(5):148.
GAO Xu,ZHANG Sheng-zhu,YANG Guo-liang,et al.Overview on reseach status of risk communication[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2011,7(3):148.
[4]王汉斌,高翔.煤矿企业脆弱性评估的AHPRS组合权重法[J].中国安全生产科学技术,2012,8(3):170.
WANG Han bing,GAO Xiang.Vulnerability assessment of coal mine enterprise with the method of ascertaining
weight based on analytic hierarchy process and rough set[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2012,8(3):170.
[5]刘铁民,徐永莉,王浩.重特大事故频发凸显生产安全的系统脆弱性——2013年几起特大事故反思[J].中国安全生产科学技术,2014,10(4):5.[doi:10.11731/j.issn.1673-193x.2014.04.001]
LIU Tie-min,XU Yong-li,WANG Hao.The frequent serious accidents exposing the system vulnerability of work safety——Reflection on several serious accidents in 2013[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2014,10(3):5.[doi:10.11731/j.issn.1673-193x.2014.04.001]
[6]门永生,于振,朱朝阳,等.基于PSR模型的电网基础设施脆弱性评估方法研究[J].中国安全生产科学技术,2014,10(8):169.[doi:10.11731/j.issn.1673-193x.2014.08.030]
MEN Yong-sheng,YU Zhen,ZHU Chao-yang,et al.Research on vulnerability assessment method of power grid infrastructures based on PSR model[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2014,10(3):169.[doi:10.11731/j.issn.1673-193x.2014.08.030]
[7]李凤,易俊,等.基于SVM的CO2驱油藏输油管道脆弱性评价研究[J].中国安全生产科学技术,2015,11(8):157.[doi:10.11731/j.issn.1673-193x.2015.08.026]
LI Feng,YI Jun,,et al.Study on vulnerability evaluation of oil pipeline for CO2 flooding reservoir based on SVM[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2015,11(3):157.[doi:10.11731/j.issn.1673-193x.2015.08.026]
[8]李乃文,王春迪,牛莉霞.高危岗位矿工个体风险感知影响因素仿真研究[J].中国安全生产科学技术,2015,11(9):184.[doi:10.11731/j.issn.1673-193x.2015.09.029]
LI Nai-wen,WANG Chun-di,NIU Li-xia.Simulation of factors affecting individual risk perception of the high-risk position miner[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2015,11(3):184.[doi:10.11731/j.issn.1673-193x.2015.09.029]
[9]罗珊,蒋宏业,姚安林,等.输气管道隧道的脆弱性评估方法研究[J].中国安全生产科学技术,2016,12(2):113.[doi:10.11731/j.issn.1673-193X.2016.02.020]
LUO Shan,JIANG Hongye,YAO Anlin,et al.Research on vulnerability assessment method
of tunnel for natural gas pipeline[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2016,12(3):113.[doi:10.11731/j.issn.1673-193X.2016.02.020]
[10]陈伟,温晋锋,钱城江.化工企业事故决策者风险感知模拟预测研究[J].中国安全生产科学技术,2016,12(8):92.[doi:10.11731/j.issn.1673-193x.2016.08.015]
CHEN Wei,WEN Jinfeng,QIAN Chengjiang.Study on simulation and prediction of risk perception for
enterprise decision-maker in chemical accident[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2016,12(3):92.[doi:10.11731/j.issn.1673-193x.2016.08.015]