-
[1]梁丽,李华,马伟红,等.模糊综合评判法在亚麻原料厂防尘工程技术措施综合评价中的应用研究[J].中国安全生产科学技术,2011,7(6):134.
LIANG li,LI Hua,MA Wei-hong,et al.Application and Research of Fuzzy Comprehensive Evaluation in the Comprehensive Assessment of Dust Control Engineering Technology Measures to Flax Raw Material Factory[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2011,7(7):134.
[2]彭小红,莫志,崔西.基于模糊数学的石化企业安全状况评估系统[J].中国安全生产科学技术,2012,8(7):108.
PENG Xiao hong,MO Zhi,CUI Xi.Assessment system of petrochemical enterprises safety
production by fuzzy mathematics[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2012,8(7):108.
[3]常志朋,程龙生.基于模糊积分综合评价法的我国应急
物资对外采购能力评价[J].中国安全生产科学技术,2012,8(9):106.
CHANG Zhi peng,CHENG Long sheng.Evaluation of capacity for foreign purchasing of emergency materials
based on fuzzy integral synthetic evaluation method[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2012,8(7):106.
[4]陆路,李霖,李萍.城市公共建筑物火灾防范能力综合评价[J].中国安全生产科学技术,2012,8(12):68.
LU Lu,LI Lin,LI Ping.comprehensive evaluation on fire prevention capacity of urban public buildings[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2012,8(7):68.
[5]朱桂明,程凌,高健,等.石化企业应急救援能力评估研究[J].中国安全生产科学技术,2010,6(2):82.
ZHU Gui-ming,CHENG Ling,GAO Jian,et al.Study on emergency capability assessment of production accidents in Petrochemical enterprise based on extenic theory[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2010,6(7):82.
[6]张黔生,谢贤平,吴劭星,等.矿山企业安全管理交互式模糊综合评价决策支持系统设计[J].中国安全生产科学技术,2010,6(1):125.
ZHANG Qian-sheng,Xie Xian-ping,WU Shao-xing,et al.Design of an interactive fuzzy comprehensive evaluation decision support system for safety management of mine enterprises[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2010,6(7):125.
[7]赵一姝,白建平,刘菊梅,等.基于层次分析法的非常规气藏钻井安全综合分析评价[J].中国安全生产科学技术,2013,9(7):139.[doi:10.11731/j.issn.1673-193x.2013.07.025]
ZHAO Yi shu,BAI Jian ping,LIU Ju mei,et al.Comprehensive safety analysis and evaluation on unconventionalgas drilling operation based on AHP[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2013,9(7):139.[doi:10.11731/j.issn.1673-193x.2013.07.025]
[8]袁春燕,杨剑耕,卢俊龙.模糊测度理论在施工现场安全目标决策中的应用[J].中国安全生产科学技术,2014,10(3):101.[doi:10.11731/j.issn.1673-193x.2014.03.017]
YUAN Chun yan,YANG Jian geng,LU Jun long.Application of fuzzy measure theory in safety objective decision of construction site[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2014,10(7):101.[doi:10.11731/j.issn.1673-193x.2014.03.017]
[9]王晓丽,魏志兵,彭士涛,等.基于主成分分析法的液体管道泄漏后果综合评价模型[J].中国安全生产科学技术,2014,10(5):85.[doi:10.11731/j.issn.1673-193x.2014.05.014]
WANG Xiaoli,WEI Zhibing,PENG Shitao,et al.Comprehensive assessment model of liquid pipeline leakage consequences based on principle component analysis[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2014,10(7):85.[doi:10.11731/j.issn.1673-193x.2014.05.014]
[10]程凌,潘彤,徐辉波.基于可拓学石化装置失效后果严重度评估方法研究[J].中国安全生产科学技术,2009,5(3):185.
CHENG Ling,PAN Tong,XU Hui bo.Study on seriousness assessment of petrol equipment failure based on extenic theory[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2009,5(7):185.