|本期目录/Table of Contents|

[1]王志强,刘硕,马婷婷,等.风险偏好视角下地铁施工安全群体行为博弈研究[J].中国安全生产科学技术,2020,16(3):138-144.[doi:10.11731/j.issn.1673-193x.2020.03.022]
 WANG Zhiqiang,LIU Shuo,MA Tingting,et al.Study on behavioral game of metro construction safety groups under perspective of risk preference[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2020,16(3):138-144.[doi:10.11731/j.issn.1673-193x.2020.03.022]
点击复制

风险偏好视角下地铁施工安全群体行为博弈研究
分享到:

《中国安全生产科学技术》[ISSN:1673-193X/CN:11-5335/TB]

卷:
16
期数:
2020年3期
页码:
138-144
栏目:
职业安全卫生管理与技术
出版日期:
2020-03-30

文章信息/Info

Title:
Study on behavioral game of metro construction safety groups under perspective of risk preference
文章编号:
1673-193X(2020)-03-0138-07
作者:
王志强刘硕马婷婷王陶陶孟玮
(1.青岛理工大学 管理工程学院,山东 青岛 266520;
2.智慧城市建设管理研究中心(新型智库),山东 青岛 266520)
Author(s):
WANG Zhiqiang LIU Shuo MA Tingting WANG Taotao MENG Wei
(1.College of Management Engineering,Qingdao University of Technology,Qingdao Shandong 266520,China;
2.Smart City Construction Management Research Center (New Think Tank),Qingdao Shandong 266520,China)
关键词:
风险偏好地铁施工安全管理演化博弈行为仿真
Keywords:
risk preference subway construction safety management evolutionary game behavior simulation
分类号:
X913.4;F224.32
DOI:
10.11731/j.issn.1673-193x.2020.03.022
文献标志码:
A
摘要:
为了研究风险偏好对地铁项目施工阶段施工人员与安全管理人员行为决策的影响,将前景理论引入演化博弈建模及分析过程,构建区别于传统收益矩阵的前景安全效用价值感知矩阵,得到施工人员与安全管理人员在不同风险偏好下的最优策略。结合数值仿真研究得出:地铁施工安全群体凭借其个人风险偏好倾向于选择预期效用最大化决策,安全群体通过风险规避才能保证地铁项目施工阶段安全系统稳定。研究结果从完善安全管理奖惩制度、培养安全群体安全理念、转变传统安全风险管控观念3个方面为地铁项目施工提出了安全管理建议。
Abstract:
In order to find out the influence of risk preference on the behavior decisionmaking of construction personnel and safety management personnel in the construction stage of metro project,the prospect theory was introduced into the modeling and analysis process of evolutionary game.A value perception matrix of prospect safety utility was constructed,which was different from the traditional benefit matrix,and the optimal strategies of construction personnel and safety management personnel under different risk preferences were obtained.Combined with the numerical simulation,the results showed that the metro construction safety groups tended to choose the decision of maximizing the expected utility based on the individual risk preference,and the safety groups could only ensure the stability of safety system in the construction stage of metro project through the risk aversion.The safety management suggestions for the metro project construction were put forward from three aspects of improving the safety management reward and punishment system,training the safety concept of safety groups,and changing the traditional safety risk management concepts.

参考文献/References:

[1]李解,王建平,许娜,等.基于文本挖掘的地铁施工安全风险事故致险因素分析[J].隧道建设,2017,37(2):160-166. LI Jie,WANG Jianping,XU Na,et al.Analysis of safety risk factors for metro construction based on text mining method[J].Tunnel Construction,2017,37(2):160-166.
[2]CRDENAS I,AL-JIBOURI S,HALMAN J,et al.Capturing and integrating knowledge for managing risks in tunnel works[J].Risk Analysis,2013,33(1):92-108.
[3]HEINRICH H.Industrial accident prevent(4th Ed)[M].New York:McGraw-hill,1959.
[4]刘仁辉,于渤,金真.基于区间估计的地铁施工安全风险评价指标筛选[J].预测,2012,31(2):62-66. LIU Renhui,YU Bo,JIN Zhen.Study on index system of safety risk evaluation for subway construction based on interval estimation[J].Forecasting,2012,31(2):62-66.
[5]孙勇,钟卓玲,李璐.基于班组安全氛围的建筑工人忽视安全预测[J].中国安全生产科学技术,2019,15(8):156-161. SUN Yong,ZHONG Zhuoling,LI Lu.Prediction of construction workers’unsafe behavior based on team safety climate[J].Journal of Safety Science and Technology,2019,15(8):156-161.
[6]姜凤珍,胡斌.KIBS员工需求驱动下行为决策的模拟——基于风险偏好视角[J].运筹与管理,2015,24(1):100-107. JIANG Fengzhen,HU Bin.Simulation for the KIBS employee behavior decision-making in demand-driven:based on the perspective of risk appetite[J].Operations Research and Management Science,2015,24(1):100-107.
[7]BENTO R,WHITE L.Participants’values and incentive plans[J].Hum Resour Manage,1998,37:47-59.
[8]KAHNEMAN D,TVERSKY A.Prospect theory:an analysis of decision under risk[J].Econometrica,1979,47(2):263-292.
[9]TVERSKY A,KAHNEMAN D.Advances in prospect theory:cumulative representation of uncertainty[J].Risk Uncertainty,1992(5):297-323.
[10]周国华,张羽,李延来,等.基于前景理论的施工安全管理行为演化博弈[J].系统管理学报,2012,21(4):501-509. ZHOU Guohua,ZHANG Yu,LI Yanlai,et al.Evolutionary game analysis of the behavior of construction safety management based on prospect theory[J].Journal of Systems & Management,2012,21(4):501-509.
[11]MULLER E.Innovation interactions between knowledge-intensive business srvice and small and medium-sized enterprises:an analysis in terms of evolution,knoeledge,and territories[M].Heidelberg:Physica-Verlag,2001.
[12]柴国荣,许阳.进度视角下地铁项目施工安全风险的系统动力学分析[J].科技管理研究,2016,36(21):85-90 CHAI Guorong,XU Yang.System dynamics analysis of security risk of subway construction from the perspective of schedule[J].Science and Technology Management Research,2016,36(21):85-90.
[13]TAYLOR P D,JONKER L B.Evolutionary stable strategies and game dynamics[J].Mathematical Biosciences,1978,40(78):145-156.
[14]FRIEDMAN D.On economic application of evolutionary game theory[J].Journal of Evolutionary Economics,1998,8(1):15-43.

相似文献/References:

[1]向卫国,徐玉胜.地铁施工引起地下管线变形的安全评估方法及其应用[J].中国安全生产科学技术,2012,8(5):87.
 XIANG Wei guo,XU Yu sheng.Security assessment method for the deformation of underground pipeline caused by the subway construction and its application[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2012,8(3):87.
[2]陈伟珂,王炳淳.基于SEM的地铁施工不安全行为与认知关系的研究[J].中国安全生产科学技术,2015,11(3):154.[doi:10.11731/j.issn.1673-193x.2015.03.025]
 CHEN Wei-ke,WANG Bing-chun.Study on relationship between unsafe behaviors and cognition in subway construction based on SEM[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2015,11(3):154.[doi:10.11731/j.issn.1673-193x.2015.03.025]
[3]李莎莎,崔铁军,马云东.基于合作博弈-云化AHP的地铁隧道施工方案选优[J].中国安全生产科学技术,2015,11(10):156.[doi:10.11731/j.issn.1673-193x.2015.10.026]
 LI Sha-sha,CUI Tie-jun,MA Yun-dong.Optimum selection of construction scheme for subway tunnel based on cooperative game and cloudization AHP[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2015,11(3):156.[doi:10.11731/j.issn.1673-193x.2015.10.026]
[4]郭聖煜,骆汉宾,滕哲,等.地铁施工工人不安全行为关联规则研究[J].中国安全生产科学技术,2015,11(10):185.[doi:10.11731/j.issn.1673-193x.2015.10.031]
 GUO Sheng-yu,LUO Han-bin,TENG Zhe,et al.Research on association rules of unsafe behavior for metro construction workers[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2015,11(3):185.[doi:10.11731/j.issn.1673-193x.2015.10.031]
[5]文艳芳,刘嘉欣.地铁施工阶段险兆事件自愿上报意愿影响因素研究[J].中国安全生产科学技术,2017,13(5):187.[doi:10.11731/j.issn.1673-193x.2017.05.031]
 WEN Yanfang,LIU Jiaxin.Study on influencing factors for voluntary reporting intention of near-miss incident in subway construction stage[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2017,13(3):187.[doi:10.11731/j.issn.1673-193x.2017.05.031]
[6]梅江钟,马玉洁,郭建斌.地铁施工风险应急管理研究[J].中国安全生产科学技术,2017,13(9):20.[doi:10.11731/j.issn.1673-193x.2017.09.003]
 MEI Jiangzhong,MA Yujie,GUO Jianbin.Study on emergency management of subway construction risk[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2017,13(3):20.[doi:10.11731/j.issn.1673-193x.2017.09.003]
[7]孙开畅,陈璇,时训先,等.基于区间直觉模糊信息TODM法的水利工程应急决策研究[J].中国安全生产科学技术,2019,15(3):19.[doi:10.11731/j.issn.1673-193x.2019.03.003]
 SUN Kaichang,CHEN Xuan,SHI Xunxian,et al.Study on emergency decisionmaking of hydraulic engineering based on interval intuitionistic fuzzy information TODIM method[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2019,15(3):19.[doi:10.11731/j.issn.1673-193x.2019.03.003]
[8]吴贤国,冯宗宝,王洪涛,等.基于动态元网络的地铁施工安全事故致因分析[J].中国安全生产科学技术,2019,15(3):141.[doi:10.11731/j.issn.1673-193x.2019.03.023]
 WU Xianguo,FENG Zongbao,WANG Hongtao,et al.Analysis on causes of safety accidents in subway construction based on dynamic metanetwork[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2019,15(3):141.[doi:10.11731/j.issn.1673-193x.2019.03.023]

备注/Memo

备注/Memo:
收稿日期: 2020-01-02
* 基金项目: 国家自然科学基金项目(71471094);山东省重点研发计划(软科学项目)一般项目(2019RKB01459)
作者简介: 王志强,硕士,副教授,主要研究方向为工程项目管理。
通信作者: 刘硕,硕士研究生,主要研究方向为工程项目管理。
更新日期/Last Update: 2020-04-01