[1]胡平安,韩森.基于JC法尾矿坝稳定性可靠度研究[J].中国安全生产科学技术,2010,6(4):56-60.
HU Pingan,HAN Sen.Reach on reliability of tailing dam stability based on JC methed[J].Journal of Safety Science and Technology,2010,6(4):56-60.
[2]刘迪,连民杰,卢才武,等.尾矿坝稳定性的不确定性概率推理分析和试验研究[J].有色金属工程,2018,8(6):82-88.
LIU Di,LIAN Minjie,LU Caiwu,et al.Probabilistic inference analysis for uncertainty and experimental research of the tailings dam stability[J].Nonferrous Metals Engineering,2018,8(6):82-88.
[3]曹志松,王星星.基于二次多项式序列响应面法的尾矿坝稳定性可靠度分析[J].中国矿山工程,2015,44(1):28-31.
CAO Zhisong,WANG Xingxing.Analysis of the stability reliability of tailings dam based on two sequential response surface method[J].China Mine Engineering,2015,44(1):28-31.
[4]张杨,秦卫星,张岳安,等.独木陇尾矿坝抗滑稳定的可靠度分析[J].金属矿山,2010(5):154-157.
ZHANG Yang,QING Weixing,ZHANG Yuean,et al.Reliability analysis on anti-sliding stability for Dumulong tailing dam[J].Metal Mine,2010(5):154-157.
[5]汪莹鹤,王保田,安彦勇.基于CTP资料的土性参数随机场特性研究[J].岩土力学,2009,30(9):2753-2758.
WANG Yinghe,WANG Baotian,AN Yanyong.Study of random field characteristics of soil parameters based on CPT measurements[J].Rock and Soil Mechanics,2009,30(9):2753-2758.
[6]李典庆,蒋水华,周创兵,等.考虑参数空间变异性的边坡可靠度分析非侵入式随机有限元法[J].岩土工程学报,2013,35(8):1413-1422
LI Dianqing,JIANG Shuihua,ZHOU Chuangbing,et al.Reliability analysis of slopes considering spatial variability of soil parameters using non-intrusive stochastic finite element method[J].2013,35(8):1413-1422
[7]UZIELLI M,VANNUCCHI G,PHOON K K.Random field characterisation of stress-nomalised cone penetration testing parameters[J].Geotechnique,2005,55(1):3-20.
[8]JIANG S H,LI D Q,ZHANG L M,et al.Slope reliability analysis considering spatially variable shear strength parameters using a non-intrusive stochastic finite element method[J].Engineering Geology,2014,168:120-128.
[9]ELRAMLY H,MORGENSTERN N R,CRUDEN D M.Probabilistic stability analysis of a tailings dyke on presheared clay shale[J].Canadian Geotechnical Journal,2003,40(1):192-208.
[10]PHOON K K,HUANG S P,QUEK S T.Implementation of Karhunen-Loeve expansion for simulation using a wavelet-Galerkin scheme[J].Probabilistic Engineering Mechanics,2002,17(3):293-303.
[11]HUANG S P.Simulation of random processes using Karhunen-Loeve expansion[D].Singapore:National University of Singapore,2001.
[12]LALOY E,ROGIERS B,VRUGT J A,et al.Efficient posterior exploration of a high-dimensional groundwater model from two-stage MCMC simulation and polynomial chaos expansion[J].Water Resources Research,2013,49(5):2664-2682.
[13]吴振君,王水林,葛修润.LHS方法在边坡可靠度分析中的应用[J].岩土力学,2010,31(4):1047-1054.
WU Zhenjun,WANG Shuilin,GE Xiurun.Application of latin hypercube sampling technique to slope reliability analysis[J].Rock and Soil Mechanics,2010,31(4):1047-1054.
[14]COULIBALY Y,BELEM T,CHENG L Z.Numerical analysis and geophysical monitoring for stability assessment of the Northwest tailings dam at Westwood Mine[J].International Journal of Mining Science and Technology,2017,27(4):701-710.
[15]FREDLUND D G,XING A,HUANG S.Predicting the permeability function for unsaturated soilsusing the soil-water characteristic curve[J].Canadian Geotechnical Journal,1994,31(4):533-546.
[16]秦胜伍,龚文曦,马中骏.考虑降雨重现期的尾矿坝渗流稳定性分析[J].水电能源科学,2019,37(2):86-90.
QING Shengwu,GONG Wenxi,MA Zhongjun.Seepage stability analysis of tailings dam considering rainfall recurrence period[J].Water Resources and Power,2019,37(2):86-90.
[17]中华人民共和国住房和城乡建设部,中华人民共和国国家质量监督检验检疫总局.建筑抗震设计规范(GB50011—2010)[S].北京:中国建筑工业出版社.2016.
[18]中国有色金属工业协会.尾矿设施设计规范(GB50863—2013)[S].北京:中国计划出版社.2013.
[19]张津嘉.基于神经网络的尾矿坝稳定性可靠度分析及影响因素研究[D].昆明:昆明理工大学,2011.
[20]CHING J,PHOON K K.Effect of element sizes in random field finite element simulations of soil shear strength[J].Computers & Structures,2013,126(1):120-134.
[1]胡平安,韩森.基于JC法尾矿坝稳定性可靠度研究[J].中国安全生产科学技术,2010,6(4):56.
HU Ping-an,HAN Sen.Reach on reliability of Tailing dam stability based on JC methed[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2010,6(12):56.
[2]李亮,孟浩,全超,等.上游式筑坝法尾矿坝的安全系数随堆筑坝高变化分析[J].中国安全生产科学技术,2011,7(7):31.
Li Liang,Meng Hao,Quan Chao,et al.Study on the variation of factor of safety with the dam height for the tailing dam from upstream embankment method[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2011,7(12):31.
[3]胡文志,马海涛,谢振华,等.三维高密度电法在尾矿库隐患检测中的应用[J].中国安全生产科学技术,2011,7(9):64.
HU Wen-zhi,MA Hai-tao,XIE Zhen-hua,et al.Application of three dimensional high-density resistivity method in hidden danger detection of Tailings[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2011,7(12):64.
[4]李亮,褚雪松.浸润线深度对尾矿坝稳定性分析的影响研究[J].中国安全生产科学技术,2011,7(11):20.
LI Liang,CHU Xue-song.Study on the effect of phreatic line depth on the evaluation of slope stability for tailing dam[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2011,7(12):20.
[5]李明,梁力,王伟,等.用有限元强度折减法求解坝坡抗滑稳定安全系数[J].中国安全生产科学技术,2012,8(2):83.
LI Ming,LIANG Li,WANG Wei,et al.Study on antiskiding stability safety factor of dam slope by shear strength reduction finite element methods[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2012,8(12):83.
[6]魏〓勇,许开立.集对分析法在尾矿坝稳定性安全评价中的应用[J].中国安全生产科学技术,2012,8(9):101.
WEI Yong,XU Kai li.Application of set pair analysis on safety evaluation of tailing dam stability[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2012,8(12):101.
[7]赵小稚.尾矿坝变形规律的灰色Verhulst预测[J].中国安全生产科学技术,2012,8(11):90.
ZHAO Xiao zhi.Grey verhulst prediction on the deformation law of tailing dam[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2012,8(12):90.
[8]潘建平,刘湘平,朱洪威,等.尾矿坝地震液化评价可靠度模型及应用[J].中国安全生产科学技术,2013,9(2):23.
PAN Jian ping,LIU Xiang ping,ZHU Hong wei,et al.Reliability model of seismic liquefaction evaluation for tailings dam and its application[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2013,9(12):23.
[9]马海涛,吴永锋,王云海,等.尾矿坝浸润线的坝面快速观测方法研究[J].中国安全生产科学技术,2010,6(1):31.
MA Hai-tao,WU Yong-feng,WANG Yun-hai,et al.Study on surface exploration meth of phreatic line of tailing dam[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2010,6(12):31.
[10]詹京晶,肖田元.基于GPS数据的尾矿坝监测系统的研究与应用[J].中国安全生产科学技术,2013,9(4):5.[doi:10.11731/j.issn.1673-193x.2013.04.001]
ZHAN Jing jing,XIAO Tian yuan.Research and application of monitoring system for tailings dam based on GPS data[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2013,9(12):5.[doi:10.11731/j.issn.1673-193x.2013.04.001]