|本期目录/Table of Contents|

[1]石超,多英全,罗艾民,等.基于JC法的RBI通用失效概率修正模型研究[J].中国安全生产科学技术,2011,7(5):108-112.
 Shi Chao,Duo Ying-quan,Luo Ai-min,et al.Study on the RBI equipment general failure probability model based on JC method[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2011,7(5):108-112.
点击复制

基于JC法的RBI通用失效概率修正模型研究()
分享到:

《中国安全生产科学技术》[ISSN:1673-193X/CN:11-5335/TB]

卷:
7
期数:
2011年5期
页码:
108-112
栏目:
职业安全卫生管理与技术
出版日期:
2011-05-30

文章信息/Info

Title:
Study on the RBI equipment general failure probability model based on JC method
文章编号:
1673-193X(2011)-05-0108-05
作者:
石超1多英全2罗艾民2方来华2
1.北京科技大学土木与环境工程学院,北京? 100083
2.中国安全生产科学研究院,北京? 100012
Author(s):
Shi Chao1 Duo Ying-quan2 Luo Ai-min2 Fang Lai-hua2
1. School of Civil & Environment Engineering, University of Science and Technology Beijing, Beijing 100083, China
2. China Academy of Safety Science &Technology, Beijing 100012, China
关键词:
失效概率结构可靠度JC法
Keywords:
failure probability structural reliability JC method
分类号:
X913.4
DOI:
-
文献标志码:
A
摘要:
基于风险的检测技术失效概率的分析始于同类设备的失效频率数据库,然后通过设备修正因子和管理系统评价因子来修正这些同类频率。针对RBI的不足,结合可靠度理论,分析均值一次二阶矩法在实际应用过程中局限性,应用基于JC法的通用失效概率计算模型完成设备失效概率的修正。该方法适合任何概率分布下的情况,可以避免统计数据正态分布一刀切的缺点。
Abstract:
Analysis on the failure probability of Risk-based Inspection is carried out through studying frequency database of the similar equipment and then correcting the similar frequency by equipment factor and management system evaluation factor. Combining reliability theory, the paper explores the limitations of the mean first order second moment method in the practical application as well as the shortcomings of RBI. In addition, the paper calculates the general failure probability of equipment based on JC model to complete the amendment. This method is suitable for any situation under the probability distribution with avoiding the partiality of normal distribution.

参考文献/References:

[1] 吴宗之.安全生产是中国可持续发展的重要组成部分[J].中国安全科学学报,2004年09期WU Zongzhi. Work Safety is an Indispensable Part of Sustainable Development in China. China Safety Science Journal, 2004,9[2] American Petroleum Institute. Risk-based Inspection Base Resource Document[S]. API 581, First Edition, 2000, 5.美国石油协会.基于风险的检测资源源文件[S]. API 581,第一版, 2000, 5.[3] American Petroleum Institute; Risk-based Inspection[S].API 580, First Edition, 2002,5.美国石油协会.基于风险的检测[S]. API 580,第一版, 2002, 5.[4] 石超.基于可靠度理论的RBI修正模型研究[J].中国安全生产科学技术, 2010,5.SHI Chao. Research on the risk assessment method of risk-based inspection technology based on the reliability theory[J]. Journal of Safety Science and Technology, 2010,5[5]李典庆,周建方.结构可靠度计算方法述评[J].河海大学常州分校学报,2000,14(1):34-42.LI Dianqing, ZHOU Jianfang. Review of Calculation Methods of Structural Reliability[J].Journal of HoHai University ChangZhou,2000,14(1):34-42[6]彭伟功, 李春光, 杨德钦. 可靠性理论在建筑施工安全领域的应用研究[ J]. 中国安全生产科学技术, 2009, 5( 4):115-121PENG Weigong, LI Chunguang, YANG Deqin. Application study of Reliability theory in the field of construction safety[J].Journal of Safety Science and Technology, 2009, 5 ( 4) : 115-121[7]合肥通用机械研究所压力容器检验站,BV,大连WEPEC重油加氢、常减压、催化裂化、制氢装置风险评估报告[R].2004,12.Hefei General Machinery Research Institute Pressure vessels inspection unit, BV, Risk Evaluation Report of Dalian WEPEC VRDS, CVD, FCC, HP Units [R].2004,12.[8] 何水清,王善.结构可靠性分析与设计[M].北京:国防工业出版社,1993.HE Shuiqing, WANG Shan. Structural Reliability Analysis and Design[M].BEIJING: National Defence Industrial Press,1993.[9] 张明.结构可靠度分析——方法与程序[M].北京:科学出版社,2009.ZHANG Ming. Structural Reliability Analysis——Methods And Procedures[M].BEIJING: Science Press,2009.[10] Ang A H-S,Tang W H. Probability Concepts in Engineering Planning and Design.Volume Ⅱ:Decision, Risk and Reliability. New York:John Wiley&Sons,1984.

相似文献/References:

[1]廖斌,杨琴,鲁茂,等.基于CREAM方法的人因失效概率预测模型研究[J].中国安全生产科学技术,2012,8(7):46.
 LIAO Bin,YANG Qin,LU Mao.Study on prediction model of human factor failure probability based on CREAM[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2012,8(5):46.
[2]黄勇,陈海群,王凯全.Fault Tree+软件在长输天然气管道定量风险分析中的应用[J].中国安全生产科学技术,2013,9(1):92.
 HUANG Yong,CHEN Hai qun,WANG Kai quan.Application of Fault Tree + software for quantitative risk analysisof long distance natual gas pipeline[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2013,9(5):92.
[3]钱东良,李长俊,廖柯熹,等.水改气海底管道输送高压天然气可行性研究[J].中国安全生产科学技术,2014,10(10):173.[doi:10.11731/j.issn.1673-193x.2014.10.029]
 QIAN Dong-liang,LI Chang-jun,LIAO Ke-xi,et al.Study on feasibility of high pressure natural gas transported by water subsea pipeline[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2014,10(5):173.[doi:10.11731/j.issn.1673-193x.2014.10.029]
[4]李军,秦朝葵,马洪敬.城市高压燃气管道的结构可靠性分析[J].中国安全生产科学技术,2014,10(11):113.[doi:10.11731/j.issn.1673-193x.2014.11.019]
 LI Jun,QIN Chao-kui,MA Hong-jing.Analysis on structural reliability of urban high-pressure gas pipeline[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2014,10(5):113.[doi:10.11731/j.issn.1673-193x.2014.11.019]
[5]施志坚,王华伟,徐璇.基于CREAM和贝叶斯网络的航空维修人为差错概率预测[J].中国安全生产科学技术,2015,11(4):185.[doi:10.11731/j.issn.1673-193X.2015.04.030]
 SHI Zhi-jian,WANG Hua-wei,XU Xuan.Prediction of human error probability in aviation maintenance based on CREAM and Bayesian network[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2015,11(5):185.[doi:10.11731/j.issn.1673-193X.2015.04.030]
[6]刘朝峰,等.城市埋地管道占压风险评估实用方法研究[J].中国安全生产科学技术,2017,13(2):188.[doi:10.11731/j.issn.1673-193x.2017.02.033]
 LIU Chaofeng,JIANG Liben,et al.Research on practical method for occupying risk assessment of urban buried pipelines[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2017,13(5):188.[doi:10.11731/j.issn.1673-193x.2017.02.033]
[7]骆正山,李娇.基于子集模拟的埋地管道失效概率评估[J].中国安全生产科学技术,2017,13(3):90.[doi:10.11731/j.issn.1673-193x.2017.03.014]
 LUO Zhengshan,LI Jiao.Failure probability assessment of buried pipeline based on subset simulation[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2017,13(5):90.[doi:10.11731/j.issn.1673-193x.2017.03.014]
[8]凌爱军,吴清红,东静波,等.海上平台静设备失效概率计算方法适用性研究[J].中国安全生产科学技术,2017,13(8):121.[doi:10.11731/j.issn.1673-193x.2017.08.019]
 LING Aijun,WU Qinghong,DONG Jingbo,et al.Research on adaptability of calculation method for failure probability of static equipment on offshore platform[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2017,13(5):121.[doi:10.11731/j.issn.1673-193x.2017.08.019]
[9]骆正山,车朝阳.基于TVR的腐蚀油气管道失效概率及安全寿命研究[J].中国安全生产科学技术,2018,14(9):95.[doi:10.11731/j.issn.1673-193x.2018.09.015]
 LUO Zhengshan,CHE Zhaoyang.Research on failure probability and safe life of corroded oil and gas pipelines based on TVR[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2018,14(5):95.[doi:10.11731/j.issn.1673-193x.2018.09.015]
[10]魏亚荣,李长俊,吴瑕.基于贝叶斯网络的页岩气集输管道失效概率计算方法研究[J].中国安全生产科学技术,2019,15(1):121.[doi:10.11731/j.issn.1673-193x.2019.01.019]
 WEI Yarong,LI Changjun,WU Xia.Study on calculation method of failure probability for gathering pipeline of shale gas based on Bayesian network[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2019,15(5):121.[doi:10.11731/j.issn.1673-193x.2019.01.019]

备注/Memo

备注/Memo:
收稿日期:2011-02-12
更新日期/Last Update: