|本期目录/Table of Contents|

[1]刘平,金学强,许家铭,等.基于本体的地铁车站施工安全风险知识自动化识别*[J].中国安全生产科学技术,2023,19(8):12-18.[doi:10.11731/j.issn.1673-193x.2023.08.002]
 LIU Ping,JIN Xueqiang,XU Jiaming,et al.Ontology-based automatic identification on safety risk knowledge of subway station construction[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2023,19(8):12-18.[doi:10.11731/j.issn.1673-193x.2023.08.002]
点击复制

基于本体的地铁车站施工安全风险知识自动化识别*
分享到:

《中国安全生产科学技术》[ISSN:1673-193X/CN:11-5335/TB]

卷:
19
期数:
2023年8期
页码:
12-18
栏目:
学术论著
出版日期:
2023-08-31

文章信息/Info

Title:
Ontology-based automatic identification on safety risk knowledge of subway station construction
文章编号:
1673-193X(2023)-08-0012-07
作者:
刘平金学强许家铭武文凯
(兰州理工大学 土木工程学院,甘肃 兰州 730050)
Author(s):
LIU Ping JIN Xueqiang XU Jiaming WU Wenkai
(School of Civil Engineering,Lanzhou University of Technology,Lanzhou Gansu 730050,China)
关键词:
地铁车站施工本体论知识建模风险识别
Keywords:
subway station construction ontology knowledge modeling risk identification
分类号:
X947
DOI:
10.11731/j.issn.1673-193x.2023.08.002
文献标志码:
A
摘要:
为有效避免在地铁车站建设过程中,应用不同类型的施工方法时所引起的不同风险事故,提出1种基于本体的地铁车站施工安全风险知识自动化识别方法。首先,采用本体OWL语言对地铁车站施工安全风险知识格式化,利用Protégé工具对定义的类、对应的属性及其关系进行编码;然后,对相应的风险事件进行SWRL规则语言创建;最后,利用Jess推理引擎,通过OWL+SWRL组合将本体知识和规则语言转化为事实,完成安全风险自动化识别。研究结果可在一定程度上实现风险知识的共享、重用和传递,规范施工时的安全风险知识,并为相关企业在地铁车站施工安全管理方面提供一定参考。
Abstract:
To effectively avoid the risk accidents caused by applying different types of construction methods during the construction of subway stations,the sharing,reuse and transfer of risk knowledge were realized,and the safety risk knowledge during construction was standardized.Firstly,the ontology OWL language was used to format the safety risk knowledge of subway station construction,and the Protégé tool was used to encode the defined classes,corresponding attributes and relationship.Secondly,the SWRL rule language was created for the corresponding risk events.Finally,the Jess inference engine was used to transform the ontology knowledge and the rule language to the facts through the combination of OWL+SWRL,so as to complete the automated identification of safety risk incidents.The research results can provide certain reference for the relevant enterprises in the construction safety management of subway stations.

参考文献/References:

[1]中华人民共和国中央人民政府.国务院安委会办公室关于浙江杭州“11.15”地铁工地重大塌陷事故的通报[EB/OL].(2008-11-19)[2023-04-07].https://www.gov.cn/gzdt/2008-11/19/content_1153659.htm.
[2]SEO J W,CHOI H H.Risk-based safety impact assessment methodology for construction projects [J].Journal of the Korean Societyof Civil Engineers D,2005,25(6D):847-855.
[3]BENEVOLENSKI A,ROOS K,KATRANUSCHKOV P,et al.Construction processes configuration using process patterns[J].Advanced Engineering Informatics,2012,26(4):727-736.
[4]李蒙,龚雨洁,余宏亮.地铁车站施工安全风险智能识别模型研究[J].建筑经济,2018,39(11):62-65. LI Meng,GONG Yujie,YU Hongliang.Research on intelligen tidentification model of subway station construction safety risks[J].Construction Economics,2018,39(11):62-65.
[5]陈太红,王明洋,解东升,等.地铁车站基坑工程建设风险识别与预控[J].防灾减灾工程学报,2008(3):375-381. CHEN Taihong,WANG Mingyang,XIE Dongsheng,et al.Identification and precontrol of construction risks of subway station pit projects[J].Journal of Disaster Prevention and Mitigation Engineering,2008(3):375-381.
[6]吴贤国,冯宗宝,王洪涛,等.基于动态元网络的地铁施工安全事故致因分析[J].中国安全生产科学技术,2019,15(3):141-147. WU Xianguo,FENG Zongbao,WANG Hongtao,et al.Analysis on causes of safety accidents in subway construction based on dynamic meta-network [J].Journal of Safety Science and Technology,2019,15(3):141-147.
[7]张绍辉.地铁车站基坑施工风险识别知识库系统的构建与应用[D].武汉:华中科技大学,2016.
[8]ZHOU Z P,LIU S,QI H N.Mitigating subway construction collapse risk using bayesian network modeling[J].Automation in Construction,2022,143:104-541.
[9]应国柱,汪鹏程,朱大勇,等.基于模糊综合评价模型的地铁施工风险评估[J].地下空间与工程学报,2016,12(2):539-545. YING Guozhu,WANG Pengcheng,ZHU Dayong,et al.Risk assessment of subway construction based on fuzzy comprehensive evaluation model[J].Journal of Underground Space and Engineering,2016,12(2):539-545.
[10]王永祥,廖婷,李洪高.基于SEM-MC的地铁车站深基坑施工危险性测度研究[J].中国安全生产科学技术,2022,18(6):127-133. WANG Yongxiang,LIAO Ting,LI Honggao.Study on the measurement of deep foundation pit construction hazards in subway stations based on SEM-MC[J].Journal of Safety Science and Technology,2022,18(6):127-133.
[11]KUTZ O,HOIS J,RECTOR A,et al.Engineering use cases for modular development of ontologies in OWL[J].Applied Ontology,2012,7(2):113-132.
[12]王军,陈锦江.基于实例与规则推理的面向液压缸产品族的智能设计系统研究[J].机床与液压,2006(12):81-83. WANG Jun,CHEN Jinjiang.Studies on CBR and rule-based intelligent designing system for hydraulic cylinder family[J].Machine Tools and Hydraulics,2006(12):81-83.
[13]NOY N F,MCGUINNESS D L.Ontology development 101:a guide to creating your first ontology[J].Stanford University,2001,113(7):7-25.
[14]ZHONG B T,LI Y.An ontological and semantic approachfor the construction risk inferring and application[J].Journal of Intelligent & Robotic Systems,2015,79:449-463.
[15]GOHARY N M,DIRABY T E.Domain ontology for processes in infrastructure and construction[J].Journal of Construction Engineering and Management,2010,136(7):730-744.
[16]夏立新,段菲菲,翟姗姗.基于本体的JESS推理实证研究[J].情报科学,2017,35(5):106-110. XIA Lixin,DUAN Feifei,ZHAI Shanshan.Empirical research on JESS reasoning of ontology[J].Intelligence Science,2017,35(5):106-110.

相似文献/References:

[1]蒋白桦,刘海龙.应急预案建模方法及其在石油化工行业的应用研究[J].中国安全生产科学技术,2012,8(5):69.
 JIANG Bai hua,LIU Hai long.Emergency schema modeling method and application in petrochemical industry[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2012,8(8):69.

备注/Memo

备注/Memo:
收稿日期: 2023-04-09 * 基金项目: 国家自然科学基金项目(72061023);甘肃省自然科学基金项目(20JR10RA173);兰州理工大学红柳优秀青年人才支持计划项目(03200038);甘肃省教育科技创新项目(2023CXZX-463) 作者简介: 刘平,博士,副教授,主要研究方向为安全风险管理。 通信作者: 许家铭,硕士,讲师,主要研究方向为工程安全风险管理。
更新日期/Last Update: 2023-09-07