[1]中华人民共和国中央人民政府.国务院安委会办公室关于浙江杭州“11.15”地铁工地重大塌陷事故的通报[EB/OL].(2008-11-19)[2023-04-07].https://www.gov.cn/gzdt/2008-11/19/content_1153659.htm.
[2]SEO J W,CHOI H H.Risk-based safety impact assessment methodology for construction projects [J].Journal of the Korean Societyof Civil Engineers D,2005,25(6D):847-855.
[3]BENEVOLENSKI A,ROOS K,KATRANUSCHKOV P,et al.Construction processes configuration using process patterns[J].Advanced Engineering Informatics,2012,26(4):727-736.
[4]李蒙,龚雨洁,余宏亮.地铁车站施工安全风险智能识别模型研究[J].建筑经济,2018,39(11):62-65.
LI Meng,GONG Yujie,YU Hongliang.Research on intelligen tidentification model of subway station construction safety risks[J].Construction Economics,2018,39(11):62-65.
[5]陈太红,王明洋,解东升,等.地铁车站基坑工程建设风险识别与预控[J].防灾减灾工程学报,2008(3):375-381.
CHEN Taihong,WANG Mingyang,XIE Dongsheng,et al.Identification and precontrol of construction risks of subway station pit projects[J].Journal of Disaster Prevention and Mitigation Engineering,2008(3):375-381.
[6]吴贤国,冯宗宝,王洪涛,等.基于动态元网络的地铁施工安全事故致因分析[J].中国安全生产科学技术,2019,15(3):141-147.
WU Xianguo,FENG Zongbao,WANG Hongtao,et al.Analysis on causes of safety accidents in subway construction based on dynamic meta-network [J].Journal of Safety Science and Technology,2019,15(3):141-147.
[7]张绍辉.地铁车站基坑施工风险识别知识库系统的构建与应用[D].武汉:华中科技大学,2016.
[8]ZHOU Z P,LIU S,QI H N.Mitigating subway construction collapse risk using bayesian network modeling[J].Automation in Construction,2022,143:104-541.
[9]应国柱,汪鹏程,朱大勇,等.基于模糊综合评价模型的地铁施工风险评估[J].地下空间与工程学报,2016,12(2):539-545.
YING Guozhu,WANG Pengcheng,ZHU Dayong,et al.Risk assessment of subway construction based on fuzzy comprehensive evaluation model[J].Journal of Underground Space and Engineering,2016,12(2):539-545.
[10]王永祥,廖婷,李洪高.基于SEM-MC的地铁车站深基坑施工危险性测度研究[J].中国安全生产科学技术,2022,18(6):127-133.
WANG Yongxiang,LIAO Ting,LI Honggao.Study on the measurement of deep foundation pit construction hazards in subway stations based on SEM-MC[J].Journal of Safety Science and Technology,2022,18(6):127-133.
[11]KUTZ O,HOIS J,RECTOR A,et al.Engineering use cases for modular development of ontologies in OWL[J].Applied Ontology,2012,7(2):113-132.
[12]王军,陈锦江.基于实例与规则推理的面向液压缸产品族的智能设计系统研究[J].机床与液压,2006(12):81-83.
WANG Jun,CHEN Jinjiang.Studies on CBR and rule-based intelligent designing system for hydraulic cylinder family[J].Machine Tools and Hydraulics,2006(12):81-83.
[13]NOY N F,MCGUINNESS D L.Ontology development 101:a guide to creating your first ontology[J].Stanford University,2001,113(7):7-25.
[14]ZHONG B T,LI Y.An ontological and semantic approachfor the construction risk inferring and application[J].Journal of Intelligent & Robotic Systems,2015,79:449-463.
[15]GOHARY N M,DIRABY T E.Domain ontology for processes in infrastructure and construction[J].Journal of Construction Engineering and Management,2010,136(7):730-744.
[16]夏立新,段菲菲,翟姗姗.基于本体的JESS推理实证研究[J].情报科学,2017,35(5):106-110.
XIA Lixin,DUAN Feifei,ZHAI Shanshan.Empirical research on JESS reasoning of ontology[J].Intelligence Science,2017,35(5):106-110.
[1]蒋白桦,刘海龙.应急预案建模方法及其在石油化工行业的应用研究[J].中国安全生产科学技术,2012,8(5):69.
JIANG Bai hua,LIU Hai long.Emergency schema modeling method and application in petrochemical industry[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2012,8(8):69.