|本期目录/Table of Contents|

[1]王若成.基于结构重要度的地铁人员疏散瓶颈识别方法[J].中国安全生产科学技术,2014,10(12):62-66.[doi:10.11731/j.issn.1673-193x.2014.12.011]
 WANG Ruo-cheng.Identification method of evacuation bottlenecks in subway based on structural importance[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2014,10(12):62-66.[doi:10.11731/j.issn.1673-193x.2014.12.011]
点击复制

基于结构重要度的地铁人员疏散瓶颈识别方法
分享到:

《中国安全生产科学技术》[ISSN:1673-193X/CN:11-5335/TB]

卷:
10
期数:
2014年12期
页码:
62-66
栏目:
学术论著
出版日期:
2014-12-31

文章信息/Info

Title:
Identification method of evacuation bottlenecks in subway based on structural importance
作者:
王若成
(西南交通大学 交通运输与物流学院安全工程系,四川成都610031)
Author(s):
WANG Ruo-cheng
(Safety Engineering, Transportation & Logistics, Southwest Jiaotong University, Chengdu Sichuan 610031, China)
关键词:
地铁结构重要度人员疏散瓶颈识别模拟
Keywords:
subway structural importance evacuation bottleneck identification simulation
分类号:
X951
DOI:
10.11731/j.issn.1673-193x.2014.12.011
文献标志码:
A
摘要:
为了提出一种新的量化人员疏散瓶颈的识别方法。以某地铁站为例,运用EVACNET4模型软件,模拟该地铁站发生火灾等事故时,人群的疏散情况,采用网络结构效益与结构重要度结合的方法查找疏散过程中的瓶颈所在,通过计算疏散瓶颈的结构重要度,将各瓶颈按其对车站安全疏散的影响程度排序,找出瓶颈制约点。结果表明:地铁站内的自动扶梯的开闭状态对疏散时间的影响很大,在发生火灾等特殊事件时应将自动扶梯停止运行,当作楼梯使用。同时,闸机的开闭状态也会影响疏散时间,但只要保障疏散过程中闸机可用,人员均能在规定的时间内完成疏散。通过对比分析门扉式闸机和三杆门式闸机的优劣,在建设地铁时,主要应以门扉式闸机为检票通道。
Abstract:
The purpose of this study is propose a new method of bottleneck identification in the evacuation process. The modeling software EVACNET4 was applied to simulate the evacuation of crowd in a certain subway station when fires and other accidents happened. A combination method of network structure effectiveness and structural importance was applied to find the bottlenecks in the evacuation process. By calculating the structural importance of evacuation bottlenecks, the bottlenecks were sorted by their impact on the safe evacuation of the station, so as to find out the bottleneck restriction points. The results showed that the opening and closing state of the escalator in the subway station has a significant impact on the evacuation time. When special events occurs, such as a fire, the escalator should be stopped and used as stairs. Meanwhile, the opening and closing state of the gates also affect the evacuation time, but as long as the gates is available in the evacuation process, the pedestrians can evacuate within the stipulated time. Through comparative analysis of the pros and cons of doors type gates and three-rods door gates, when building asubway, the doors type gates should be the main channel for the ticket check.

参考文献/References:

[1]贺利工, 史聪灵, 钟茂华, 等. 浅谈地铁地下区间侧向疏散平台疏散[J]. 中国安全生产科学技术, 2013, 9(7): 49-53 HE Li-gong, SHI Cong-ling, ZHONG Mao-hua, et al. Analysis and discussion on passenger evacuation by lateral emergency evacuation platform in metro tunnel[J]. Journal of Safety Science and Technology, 2013, 9(7): 49-53
[2]Roh J S, Ryou H S, Park W H, et al. CFD simulation and assessment of life safety in a subway train fire[J]. Tunnelling and Underground Space Technology, 2009, 24(4): 447-453
[3]Jiang C S, Yuan F, Chow W K. Effect of varying two key parameters in simulating evacuation for subway stations in China[J]. Safety science, 2010, 48(4): 445-451
[4]Kim E S, Cho J H, Kim M H. The Study of Outflow Rate of Stair and Turnstile in Subway Station-Comparison between Measurement and Simulation[J]. Journal of Korean Institute of Fire Science and Engineering, 2010, 24(3): 33-38
[5]Yi-fan L I, Jun-min C, Jie J I, et al. Analysis of Crowded Degree of Emergency Evacuation at “Bottleneck” Position in Subway Station Based on Stairway Level of Service[J]. Procedia Engineering, 2011, 11: 242-251
[6]Yunfang W, Qizong W, Jian M. Feasible analysis and model building of urban subway service carriage for women, children and seniors[C]. Service Systems and Service Management (ICSSSM), 2012 9th International Conference on. IEEE, 2012: 651-653
[7]Hu C, Liu J, Ma Y, et al. An Analysis on the Park-and-Ride Travel Selection from the Perspective of Bottleneck Theory[M]. Advances in Information Technology and Education. Springer Berlin Heidelberg, 2011: 241-249
[8]Osorio C, Bierlaire M. An analytic finite capacity queueing network model capturing the propagation of congestion and blocking [J]. European Journal of Operational Research, 2009, 196(3): 996-1007
[9]陈绍宽, 刘爽, 肖雄, 等. 基于 M/G/c/c 模型的地铁车站楼梯通道疏散能力瓶颈分析[J]. 铁道学报, 2012, 34(1): 7-12 CHEN Shao-kuan, LIU Shuang, XIAO Xiong, et al. M/G/c/c-based model of passenger evacuation capacity of stairs and corridors in metro stations [J]. Journal of the China Railway Society, 2012, 34(1): 7-12
[10]胡清梅, 方卫宁, 李广燕, 等. 地铁车站出口布局对人群疏散性能的影响[J]. 铁道学报, 2009 (3): 111-115 HU Qing-mei, FANG Wei-ning, LI Guang-yan, et al. Influence of exit layout of a metro station on pedestrian evacuation[J]. Journal of the China Railway Society, 2009 (3): 111-115

相似文献/References:

[1]王震,贺农农.西安地铁工程安全文化的建立[J].中国安全生产科学技术,2011,7(5):159.
 WANG Zhen,HE Nong-nong.Establishment of safety culture in Xi’an metro engineering[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2011,7(12):159.
[2]邓军,王萌.地铁火灾监控技术发展的德尔菲预见性分析[J].中国安全生产科学技术,2011,7(5):77.
 Deng Jun,?Wang Meng.Delphi technology foresight analysis on development of the metro fire monitoring system[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2011,7(12):77.
[3]史聪灵,钟茂华,张岚,等.地铁换乘车站客流疏运模拟及风险分析(2)——单通道换乘车站[J].中国安全生产科学技术,2011,7(8):21.
 SHI Cong-ling,ZHONG Mao-hua,ZHANG Lan,et al.Simulation and risk Analysis on passenger transportation of metro transfer station(2)——Single passage transferring Station[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2011,7(12):21.
[4]马骏.扩孔型锚固技术在西安地铁工程中的应用[J].中国安全生产科学技术,2011,7(9):195.
 MA Jun.Anchor hole enlargement technology in Xi’an Subway Project[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2011,7(12):195.
[5]刘新军.西安地铁穿越地裂缝带支护结构设计研究[J].中国安全生产科学技术,2012,8(2):144.
 LIU Xin jun.Design of support structure of Xi’an metro through ground fissure[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2012,8(12):144.
[6]郭雩,何理,石杰红,等.地铁不同人群疏散行为特征调查问卷研究[J].中国安全生产科学技术,2012,8(4):183.
 GUO Yu,HE Li,SHI Jie hong,et al.Questionnaire research on the evacuation behavior characteristics of different crowds in subway[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2012,8(12):183.
[7]李艳霞,孙建华,魏春荣,等.事故树结构重要度求解方法研究探讨[J].中国安全生产科学技术,2012,8(5):111.
 LI Yan xia,SUN Jian hua,WEI Chun rong,et al.Study on solving method for structural importance of fault tree[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2012,8(12):111.
[8]雷斌,曹振,张宁.西安地铁安全文化体系建设研究[J].中国安全生产科学技术,2012,8(6):221.
 LEI Bin,CAO Zhen,ZANG Ning.Study on system constructions of safety culture in Xi’an metro[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2012,8(12):221.
[9]史聪灵,钟茂华,汪良旗,等.地铁车站及隧道全尺寸火灾实验研究(2) ——区间隧道火灾[J].中国安全生产科学技术,2012,8(8):28.
 SHI Cong ling,ZHONG Mao hua,WANG Liang qi,et al.Investigation of fullscale burning experiments in metro station and tunnel (2) -interval tunnel fires[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2012,8(12):28.
[10]秦〓毅,杨胜强,严家程,等.煤炭自然发火事故树分析及预防[J].中国安全生产科学技术,2012,8(8):198.
 QIN Yi,YANG Sheng qiang,YAN Jia cheng,et al.Analysis on spontaneous combustion of coal fires and prevention based on fault tree analysis[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2012,8(12):198.

备注/Memo

备注/Memo:
-
更新日期/Last Update: 2014-12-30