[1]牛衍亮,苏丽娟,纪文雅,等.高海拔铁路隧道施工安全风险管理策略研究*[J].中国安全生产科学技术,2024,20(6):168-175.[doi:10.11731/j.issn.1673-193x.2024.06.023]
 NIU Yanliang,SU Lijuan,JI Wenya,et al.Study on safety risk management strategy of railway tunnel construction in high-altitude area[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2024,20(6):168-175.[doi:10.11731/j.issn.1673-193x.2024.06.023]
点击复制

高海拔铁路隧道施工安全风险管理策略研究*
分享到:

《中国安全生产科学技术》[ISSN:1673-193X/CN:11-5335/TB]

卷:
20
期数:
2024年6期
页码:
168-175
栏目:
职业安全卫生管理与技术
出版日期:
2024-06-30

文章信息/Info

Title:
Study on safety risk management strategy of railway tunnel construction in high-altitude area
文章编号:
1673-193X(2024)-06-0168-08
作者:
牛衍亮苏丽娟纪文雅石有才李慧敏
(1.石家庄铁道大学 管理学院,河北 石家庄 050043;
2.石家庄铁道大学 工程建设管理研究中心,河北 石家庄 050399;
3.中铁十二局集团有限公司CZ项目公司,山西 太原 030000;
4.天津大学 管理与经济学部,天津 300072)
Author(s):
NIU Yanliang SU Lijuan JI Wenya SHI Youcai LI Huimin
(1.School of Management,Shijiazhuang Tiedao University,Shijiazhuang Hebei 050043,China;
2.Research Institute of Engineering Management,Shijiazhuang Tiedao University,Shijiazhuang Hebei 050399,China;
3.China Railway 12th Bureau Group Co.,Ltd.CZ Project Company,Taiyuan Shanxi 030000,China;
4.College of Management and Economics,Tianjin University,Tianjin 300072,China)
关键词:
高海拔铁路安全风险管理策略扎根理论定性比较分析法
Keywords:
high-altitude railway safety risk management strategy grounded theory qualitative comparative analysis method
分类号:
X947;X913.4
DOI:
10.11731/j.issn.1673-193x.2024.06.023
文献标志码:
A
摘要:
为弥补组织安全风险管理漏洞、提高高海拔地区铁路隧道施工安全风险管理绩效,采用扎根理论构建管理层面的高海拔地区铁路隧道施工安全风险管理策略框架,然后通过fsQCA方法构建策略选择组态模型,探讨安全风险管理能力与策略对于安全风险管理绩效影响的组态效应。研究结果表明:通过扎根理论分析识别出17条安全风险管理策略,基于Reason模型将其分为“组织规范策略”、“安全监督策略”、“前提保障策略”以及“行为规范策略”4个类别;在决策能力较强时,管理者需要将精力和资源着重偏向“安全监督策略”、“前提保障策略”以及“行为规范策略”;在决策能力较弱时,则需要注重全部4个类别所对应的安全风险管理策略的实施落实情况。研究结果可为提高高海拔隧道安全管理者的决策效率、保障施工安全进行提供一定参考。
Abstract:
In order to make up for the loopholes in the organization’s safety risk management and improve the performance of safety risk management on the railway tunnel construction in high altitude areas,the grounded theory was used to construct the safety risk management strategy framework of railway tunnel construction in high altitude area at the management level,then the configuration model of strategy selection was constructed through the fsQCA method,and the configuration effect of safety risk management ability and strategy on safety risk management performance was explored.The results show that 17 safety risk management strategies are identified through the analysis,which are divided into four categories based on the Reason model: “organization regulation strategy”,“safety supervision strategy”,“prerequisite guarantee strategy” and “behavior regulation strategy”.In the case of strong decision-making ability,the managers need to focus their vigor and resources on “safety supervision strategy”,“prerequisite guarantee strategy” and “behavior regulation strategy”.In the case of weak decision-making ability,they need to pay attention to the implementation of all the safety risk management strategies.The research results can provide some reference for improving the decision-making efficiency of safety managers of high-altitude tunnels and ensuring the construction safety.

参考文献/References:

[1]中华人民共和国国家发展和改革委员会.关于印发《中长期铁路网规划》的通知(发改基础〔2016〕1536号).(2016-07-20)[2016-07-20].https://www.ndrc.gov.cn/fggz/zcssfz/zcgh/201607/t20160720_1145730.html.
[2]莫俊文,王锐锐.基于HLM-BP的高海拔隧道施工人员不安全行为预警研究[J].铁道科学与工程学报,2023,20(3):1116-1126. MO Junwen,WANG Ruirui.Research onearly warning of unsafe behavior of high-altitude tunnel builders based on HLM-BP[J].Journal of Railway Science and Engineering,2023,20(3):1116-1126.
[3]SU Y K,YANG S J,LIU K N,et al.Developing a case-based reasoning model for safety accident pre-control and decision making in the construction industry[J].International Journal of Environmental Research and Public Health,2019,16(9):1511-1531.
[4]ZHANG Y.Selecting risk response strategies considering project risk interdependence[J].International Journal of Project Management,2016,34(5):819-830.
[5]张尧,孙梦阳,关欣.考虑风险总关联的项目风险应对策略选择方法[J].中国管理科学,2020,28(1):32-44. ZHANG Yao,ZHANG Mengyang,GUAN Xin.Method of selecting project risk response strategies considering total risk interdependence[J].Chinese Journal of Management Science,2020,28(1):32-44.
[6]何叶荣,孟祥瑞,李慧宗,等.煤矿企业安全管理能力风险因素结构模型[J].中国安全生产科学技术,2015,11(3):135-140. HE Yerong,MENG Xiangrui,LI Huizong,et al.Structural model on risk factors of safety management capability in coal mine enterprise[J].Journal of Safety Science and Technology,2015,11(3):135-140.
[7]GUO D S,SONG Z P,XU T,et al.Coupling analysis of tunnel construction risk in complex geology and construction factors[J].Journal of Construction Engineering and Management,2022,148(9):97-110.
[8]NIU Y L,ZHAO D,ZHAO X B,et al.Coopetition strategies of international joint ventures for high-speed railway projects[J].Journal of Infrastructure Systems,2021,27(4):1031-1042.
[9]李炳元,潘保田,韩嘉福.中国陆地基本地貌类型及其划分指标探讨[J].第四纪研究,2008(4):535-543. LI Bingyuan,PAN Baotian,HAN Jiafu.Basic terestrial geommorphological types in China and their circumscriptions[J].Quaternary Sciences,2008(4):535-543.
[10]徐影,杨高升,夏柠萍,等.基于FTA-Reason的施工作业高空坠落风险预控研究[J].中国安全生产科学技术,2015,11(7):171-177. XU Ying,YANG Gaosheng,XIA Ningping,et al.Study on pre-control of high falling risk in construction operation based on FTA-Reason model[J].Journal of Safety Science and Technology,2015,11(7):171-177.
[11]杜运周,刘秋辰,程建青.什么样的营商环境生态产生城市高创业活跃度?——基于制度组态的分析[J].管理世界,2020,36(9):141-155. DU Yunzhou,LIU Qiuchen,CHENG Jianqing.What kind of ecosystem for doing business will contribute to city-level high entrepreneurial activity? A research based on institutional configurations[J].Journal of Management World,2020,36(9):141-155.
[12]NIU Y L,LI H M,LUO X W,et al.Coopetition configuration and performance of international joint ventures for high-speed rail projects[J/OL].Engineering,Construction and Architectural Management:1-25[2024-05-28]https://www.emerald.com/insight/content/doi/10.1108/ECAM-09-2022-0909/full/html.
[13]滕五晓.层级式安全管理的效能衰减及其治理策略[J].社会科学,2012(4):74-80. TENG Wuxiao.Efficiency attenuation and strategies for a multi-level safety management system[J].Journal of Social Sciences,2012(4):74-80.
[14]HAMBRICK D,MASON P.Upperechelons:the organization as a reflection of its top managers[J].Academy of Management Review,1984,9(2):193-206.
[15]CONCHIE S,MOON S,DUNCAN M.Supervisors’engagement in safety leadership:factors that help and hinder[J].Safety Science,2013,51(1):109-117.
[16]GUNDUZ M,LAITINEN H.Construction safety risk assessment with introduced control levels[J].Journal of Civil Engineering and Management,2018,24(1):11-18.
[17]李光荣,贺生忠,香宏.情感安全文化对员工安全绩效的影响路径研究——基于关系型心理契约的中介效应[J].中国安全生产科学技术,2018,14(5):23-30. LI Rongguang,HE Shengzhong,XIANG Hong.Research on influence path of emotional safety culture on safety performance of employee——in view of mediating effect based on relational psychological contract[J].Journal of Safety Science and Technology,2018,14(5):23-30.
[18]FISS P.Building better causal theories:a fuzzy set approach to typologies in organization research[J].Academy of Management Journal,2011,54(2):393-420.
[19]YIU N,CHAN D,SHAN M,et al.Implementation of safety management system in managing construction projects:benefits and obstacles[J].Safety Science,2019,117:23-32.
[20]WU C L,FANG D P,LI N.Roles of owners’ leadership in construction safety:the case of high-speed railway construction projects in China[J].International Journal of Project Management,2015,33(8),1665-1679.
[21]SU W X,GAO X,JIANG Y K,et al.Developing a construction safety standard system to enhance safety supervision efficiency in China:a theoretical simulation of the evolutionary game process[J].Sustainability,2021,13(23):13364-13364.
[22]卢春房.铁路建设管理“六位一体”目标控制体系的创建与实践[J].管理世界,2008(4):1-7. LU Chunfang.Establishment and practice of “Six in One” target control system in railway construction management[J].Journal of Management World,2008(4):1-7.
[23]莫俊文,崔利兵.高海拔地区铁路施工人员心理弹性对安全行为的影响研究[J].铁道科学与工程学报,2023,20(11):4377-4388. MO Junwen,CUI Libin.A study on the influence of psychological flexibility on safety behavior of railroad construction workers in high altitude areas[J].Journal of Railway Science and Engineering,2023,20(11):4377-4388.

相似文献/References:

[1]何沙,朱林,姬荣斌.海上钻井平台安全风险预警模型应用研究[J].中国安全生产科学技术,2012,8(4):148.
 HE Sha,CHEN Dong sheng,ZHU Lin,et al.Study on application of safety risk early warning model for offshore drilling platform[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2012,8(6):148.
[2]曹荣,苏永强.大型公用建筑项目安全风险“致因—承担”模型[J].中国安全生产科学技术,2010,6(3):65.
 CAO Rong,SU Yong-qiang.Study on safety risk "cause-responsibility" model of large public building projects[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2010,6(6):65.
[3]崔新辉.高压凝析气田气井安全控保系统设置[J].中国安全生产科学技术,2013,9(10):115.[doi:10.11731/j.issn.1673-193x.2013.10.021]
 CUI Xin hui.Settings of safety control and protection system for gas well in high pressure condensate gas field[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2013,9(6):115.[doi:10.11731/j.issn.1673-193x.2013.10.021]
[4]陈大川,刘翔,何蓓,等.长沙城际铁路隧道沿线砌体房屋安全风险研究[J].中国安全生产科学技术,2015,11(6):87.[doi:10.11731/j.issn.1673-193x.2015.06.014]
 CHEN Da-chuan,LIU Xiang,HE Bei,et al.Research on safety risk of masonry structure buildings along tunnel of Changsha intercity railway[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2015,11(6):87.[doi:10.11731/j.issn.1673-193x.2015.06.014]
[5]高扬,王向章.基于G1-DEMATEL法的通用航空维修安全影响因素研究[J].中国安全生产科学技术,2016,12(2):164.[doi:10.11731/j.issn.1673-193X.2016.02.030]
 GAO Yang,WANG Xiangzhang.Research on influence factors of maintenance safety in general aviation based on G1-DEMATEL method[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2016,12(6):164.[doi:10.11731/j.issn.1673-193X.2016.02.030]
[6]吴建军,金永兴,胡甚平,等.铝土矿海上运输安全风险研究综述[J].中国安全生产科学技术,2017,13(8):87.[doi:10.11731/j.issn.1673-193x.2017.08.014]
 WU Jianjun,JIN Yongxing,HU Shenping,et al.Overview of safety risk research on marine transportation of bauxite[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2017,13(6):87.[doi:10.11731/j.issn.1673-193x.2017.08.014]
[7]谢鹏,吕鹏飞.基于改进云模型-IAHP的涉爆粉尘企业安全风险评估[J].中国安全生产科学技术,2018,14(8):187.[doi:10.11731/j.issn.1673-193x.2018.08.031]
 XIE Peng,LYU Pengfei.Assessment on safety risk of enterprises involved in explosive dust based on improved cloud model and IAHP[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2018,14(6):187.[doi:10.11731/j.issn.1673-193x.2018.08.031]
[8]路亚彬,张新晓,马良俊,等.危险化学品装卸运输一体化安全风险预警平台设计与研究[J].中国安全生产科学技术,2019,15(5):179.[doi:10.11731/j.issn.1673-193x.2019.05.029]
 LU Yabin,ZHANG Xinxiao,MA Liangjun,et al.Design and research of integrated safety risk early warning platform for hazardous chemicals handling and transportation[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2019,15(6):179.[doi:10.11731/j.issn.1673-193x.2019.05.029]
[9]王国栋,颜爱华,侯蕊芳,等.城市安全风险评估方法体系研究及实践[J].中国安全生产科学技术,2019,15(7):46.[doi:10.11731/j.issn.1673-193x.2019.07.007]
 WANG Guodong,YAN Aihua,HOU Ruifang,et al.Research and practice of urban safety risk assessment method system[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2019,15(6):46.[doi:10.11731/j.issn.1673-193x.2019.07.007]
[10]张江石,朱金梅,梁云飞,等.基于NVivo与集对分析的自然资源领域安全生产风险研究*[J].中国安全生产科学技术,2022,18(1):36.[doi:10.11731/j.issn.1673-193x.2022.01.006]
 ZHANG Jiangshi,ZHU Jinmei,LIANG Yunfei,et al.Study on work safety risk of natural resources field based on NVivo and set pair analysis[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2022,18(6):36.[doi:10.11731/j.issn.1673-193x.2022.01.006]

备注/Memo

备注/Memo:
收稿日期: 2024-01-13
* 基金项目: 国家自然科学基金项目(72071133);河北省教育厅人文社会科学研究重大课题攻关项目(ZD202309)
作者简介: 牛衍亮,博士,副教授,主要研究方向为工程管理。
通信作者: 李慧敏,博士研究生,主要研究方向为工程管理。
更新日期/Last Update: 2024-06-25