[1]王列妮,牟瑞芳,张磊.我国某铁路局2005—2014年行车事故分布规律分析[J].安全与环境学报,2018,18(1):406-412.
WANG Lieni, MOU Ruifang, ZHANG Lei. Research review and an analysis of the accident distribution regularity of the state railway bureau during the period of 2005—2014[J]. Journal of Safety and Environment,2018,18(1): 406-412.
[2]万毅, 邓斌, 李慧杰, 等.基于FTA的接触网系统可靠性研究[J] .铁道工程学报, 2005,22(6):56-59.
WAN Yi, DENG Bin, LI Huijie, et al. Research on reliability of the catenary system based on FTA[J]. Journal of Railway Engineering Society, 2005,22(6):56-59.
[3]王思华,赵琼,马军党,等.接触网系统可靠性的马尔科夫建模分析[J].中国安全科学学报,2013,23(9):39-44.
WANG Sihua, ZHAO Qiong, MA Jundang,et al.Markov model for analyzing catenary system reliability[J]. China Safety Science Journal,2013,23(9):39-44.
[4]赵峰,梁丽,王思华.基于GO-FLOW法的高速铁路接触网系统可靠性分析[J].电工技术学报,2015,30(12):351-356.
ZHAO Feng, LIANG Li, WANG Sihua. A reliability evaluation of high speed railway overhead contact systems based on the GO-FLOW methodology[J]. Transactions of China Electrotechnical Society,2015,30(12):351-356.
[5]王贞,林圣,冯玎,高仕斌,等.考虑天气状态的接触网可靠性评估方法研究[J].铁道学报,2018,40(10):49-56.
WANG Zhen,LIN Sheng,GAO Shibin,et al.Research on reliability evaluation method for catenary system considering weather condition[J]. Journal of the China Railway Society,2018,40(10):49-56.
[6]古莹奎,张全新,梁玲强,等.基于BDD考虑共因失效的多阶段任务系统可靠性分析方法[J].机械设计与研究,2017,33(2):1-5.
GU Yingkui, ZHANG Quanxin, LIANG Lingqiang,et al.Reliability analysis method of phasedmission systems with common cause failure based on BDD[J].Machine Design & Research,2017,33(2):1-5.
[7]戚加军,赵新文,张永发,等.基于BDD的安全注射系统共因失效分析方法[J].兵器装备工程学报,2017,38(9):143-147.
QI Jiajun, ZHAO Xinwen, ZHANG Yongfa, et al.Common cause failure analysis method of safetyinjection system based on BDD[J].Journal of Ordnance Equipment Engineering,2017,38(9):143-147.
[8]BARTLETT L M, ANDREWS J D. Efficient basic event ordering schemes for fault tree analysis[J]. Quality & Reliability Engineering International,2015,15(2):95-101.
[9]SINNAMON R M, ANDREWS J D. New approaches toevaluating fault trees[J]. Reliability Engineering &System Safety,1995, 58(2):89-96.
[10]RAUZY A. New algorithms for fault tree analysis[J]. Reliability Engineering & System Safety, 1993, 40(3):203-211.
[11]段珊,张修如,刘树锟,等.一种故障树向BDD的转化方法[J].计算机工程与应用,2009,45(21):51-54.
DUAN Shan, ZHANG Xiuru, LIU Shukun, et al. Transformation method of fault tree based on BDD[J]. Computer Engineering and Applications,2009,45(21):51-54.
[12]赵峰, 刘荣峥, 梁丽, 等. 基于贝叶斯网络融合共因失效的接触网系统可靠性分析[J]. 中国安全科学学报,2015,25(5):61-67.
ZHAO Feng, LIU Rongzheng, LIANG Li,et al. Reliability analysis of catenary system based on bayesian network with fusion of common cause failure[J]. China Safety Science Journal,2015,25(5):61-67.
[13]金星,洪延姬,杜红梅. 共因失效系统的可靠性分析方法[M]. 北京:国防工业出版社,2008:1-8.
[14]何正友.复杂系统可靠性分析在轨道交通供电系统中的应用[M]. 北京:科学出版社,2015:18-19.
[15]赵琼,王思华,尚芳宁. 基于故障树分析法的接触网可靠性研究[J]. 铁道标准设计,2014,58(10): 105-108.
ZHAO Qiong, WANG Sihua, SHANG Fangning.Reliability analysis of overhead contact line systembased on fault tree analysis method[J]. Railway Standard Design,2014,58(10): 105-108.