|本期目录/Table of Contents|

[1]王景春,王屹.基于未确知测度的艰险隧道施工物资配置水平评估*[J].中国安全生产科学技术,2023,19(11):150-156.[doi:10.11731/j.issn.1673-193x.2023.11.021]
 WANG Jingchun,WANG Yi.Assessment on level of materials allocation for difficult tunnel construction based on unascertained measure[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2023,19(11):150-156.[doi:10.11731/j.issn.1673-193x.2023.11.021]
点击复制

基于未确知测度的艰险隧道施工物资配置水平评估*
分享到:

《中国安全生产科学技术》[ISSN:1673-193X/CN:11-5335/TB]

卷:
19
期数:
2023年11期
页码:
150-156
栏目:
职业安全卫生管理与技术
出版日期:
2023-11-30

文章信息/Info

Title:
Assessment on level of materials allocation for difficult tunnel construction based on unascertained measure
文章编号:
1673-193X(2023)-11-0150-07
作者:
王景春王屹
(1.石家庄铁道大学 安全工程与应急管理学院,河北 石家庄 050043;
2.石家庄铁道大学 土木工程学院,河北 石家庄 050043)
Author(s):
WANG Jingchun WANG Yi
(1.School of Safety Engineering and Emergency Management,Shijiazhuang Tiedao University,Shijiazhuang Hebei 050043,China;
2.School of Civil Engineering,Shijiazhuang Tiedao University,Shijiazhuang Hebei 050043,China)
关键词:
艰险隧道物资配置水平评估改进G1法未确知测度
Keywords:
difficult tunnel materials allocation level assessment improved G1 method unascertained measure
分类号:
X947
DOI:
10.11731/j.issn.1673-193x.2023.11.021
文献标志码:
A
摘要:
为进一步完善艰险地区隧道施工组织设计,提高物资配置水平及安全性,提出基于CRITIC修正的G1赋权方法和未确知测度理论相结合的艰险隧道施工物资配置水平评估模型。首先,通过对物资配置影响因素的分析,构建包括“人、机、环、管”4个准则及26个指标的物资配置水平评价指标体系;其次,采用基于CRITIC修正的G1赋权法计算各评价指标的权重,运用未确知测度模型确定评价等级并排序;最后,将模型应用到3个在建艰险隧道的4个工区中。研究结果表明:4个工区的物资配置水平E4>E3>E1>E2与现场实际情况相符,改进的未确知测度评价模型具有一定的可行性和有效性。研究结果可为提高艰险地区隧道施工效率及流畅性提供参考。
Abstract:
In order to further improve the design of tunnel construction organization in difficult areas and improve the level of materials allocation and safety,an assessment model of materials allocation level for difficult tunnel construction based on CRITIC modified G1 weighting method and unascertained measure theory was proposed.Firstly,through the analysis on the influencing factors of materials allocation,an assessment indexes system of the materials allocation level,including 4 guidelines of “human,machine,environment and management” and 26 indexes was constructed.Secondly,the CRITIC modified G1 weighting method was used to calculate the weight of each assessment index,and the unascertained measure model was applied to determine the assessment level and rank.Finally,the model was applied to 4 working zones in three constructing difficult tunnels.The results show that the rank for the materials allocation level of four working zones is E4>E3>E1>E2,which is consistent with the actual situation.The improved unascertained measure assessment model has certain feasibility and effectiveness.The result can provide a reference for improving the efficiency and fluency of tunnel construction in difficult areas.

参考文献/References:

[1]LEE J,PARK M,LEE H S,et al.Classification of modular building construction projects based on schedule-driven approach [J].Journal of Construction Engineering and Management,2019,145(5):04019031.
[2]OLIVIERI H,SEPPANEN O,ALVES T D L,et al.Survey comparing critical path method,last planner system,and location-based techniques [J].Journal of Construction Engineering and Management,2019,145(12):04019077.
[3]YANG B,LIU B D,XIAO J Z,et al.A novel construction scheduling framework for a mixed construction process of precast components and cast-in-place parts in prefabricated buildings [J].Journal of Building Engineering,2021,43:103181.
[4]SONG Y H,WANG J W,LU J Q,et al.Research on collaborative scheduling of multiple projects of prefabricated building based on the niche genetic-raccoon family optimization algorithm [J].Alexandria Engineering Journal,2023,64:1015-1033.
[5]YUAN Y S,YE S D,LIN L,et al.Multi-objective multi-mode resource-constrained project scheduling with fuzzy activity durations in prefabricated building construction [J].Computers & Industrial Engineering,2021,158:107316.
[6]尹静,孙浩,张恒熙,等.装配式混凝土结构生产运输协同调度[J].科学技术与工程,2021,21(21):9029-9034. YIN Jing,SUN Hao,ZHANG Hengxi,et al.Coordinated scheduling of production and transportation of prefabricated concrete structures[J].Science Technology and Engineering,2021,21(21):9029-9034.
[7]李华,张旭旭,高红,等.智慧工地本质安全度评价方法研究[J].中国安全生产科学技术,2022,18(1):139-145. LI Hua,ZHANG Xuxu,GAO Hong,et al.Research on evaluation method for intrinsic safety degree of smart construction site [J].Journal of Safety Science and Technology,2022,18(1):139-145.
[8]石勇,史秀志.基于未确知测度的岩体稳定性多元联系度评价模型[J].中国安全生产科学技术,2021,17(11):125-130. SHI Yong,SHI Xiuzhi.Evaluation model on multivariate connection degree of rock mass stability based on unascertained measure [J].Journal of Safety Science and Technology,2021,17(11):125-130.
[9]ZHANG G R,WANG E Y,ZHANG C L,et al.A comprehensive risk assessment method for coal and gas outburst in underground coal mines based on variable weight theory and uncertainty analysis [J].Process Safety and Environmental Protection,2022,167:97-111.
[10]刘会景.基于未确知测度的煤矿瓦斯爆炸应急救援能力综合评估[J].煤炭工程,2023,55(1):180-186. LIU Huijing.Comprehensive evaluation of mine gas explosion emergency rescue capability based on unascertained measure [J].Coal Engineering,2023,55(1):180-186.
[11]DIAKOULAKI D,MAVROTAS D L,PAPAYANNAKIS L.Determining objective weights in multiple criteria problems:the critic method [J].Computers and Operations Research,1995,22(7):763-770.
[12]吴建斌,谷志红,王正,等.基于博弈变权-云模型的配电网设备精益运维多属性评价[J].科学技术与工程,2021,21(27):11615-11623. WU Jianbin,GU Zhihong,WANG Zheng,et al.Multi-attribute evaluation on lean operation and maintenance of distribution network equipment based on game variable weight cloud model [J].Science Technology and Engineering,2021,21(27):11615-11623.
[13]芦磊,张斌,郑达.基于AHP-CRITIC的公路土质路堑边坡风险评估模型[J].人民长江,2023,54(1):133-139. LU Lei,ZHANG Bin,ZHENG Da.Study on risk assessment model of highway soil cutting slope based on AHP-CRITIC Method [J].Yangtze River,2023,54(1):133-139.
[14]许铭赫,高扬.基于序关系分析法和自适应噪声完备集合经验模态分解法的直升机飞行培训安全风险评估指标权重分析[J].科学技术与工程,2021,21(14):6089-6096. XU Minghe,GAO Yang.Index weight analysis for safety risk assessment of helicopter flight training based on order relation analysis method complete ensemble empirical mode decomposition with adaptive noise [J].Science Technology and Engineering,2021,21(14):6089-6096.
[15]何涛,马洁.基于云模型和组合赋权法的CBTC系统可靠性评价[J].重庆大学学报,2023,46(2):130-139. HE Tao,MA Jie.Reliability evaluation of CBTC based on cloud model and combination weighting method [J].Journal of Chongqing University,2023,46(2):130-139.
[16]战琦,周炜,李文亮,等.基于组合赋权的车辆智能换道避障功能模糊综合评价[J].公路交通科技,2023,40(1):236-244. ZHAN Qi,ZHOU Wei,LI Wenliang,et al.Fuzzy comprehensive evaluation on vehicle intelligent obstacle avoidance function by lane changing based on combination weighing [J].Journal of Highway and Transportation Research and Development,2023,40(1):236-244.
[17]YE F,SUN J,WANG Y Y,et al.A novel method for the performance evaluation of institutionalized collaborative innovation using an improved G1-CRITIC comprehensive evaluation model [J].Journal of Innovation & Knowledge,2023,8(1):100289.
[18]苏旸,靳春玲,贡力,等.基于IE-UMT模型的机制砂质量分级优选评价[J].公路,2023,68(1):302-307. SU Yang,JIN Chunling,GONG Li,et al.Optimal evaluation of mechanical sand quality grading based on IE-UMT model [J].Highway,2023,68(1):302-307.
[19]左林霄,高鹏,冯栋,等.基于AHP-熵权法耦合方法的地质构造复杂程度定量评价[J].煤炭科学技术,2022,50(11):140-149. ZUO Linxiao,GAO Peng,FENG Dong,et al.Quantitative evaluation of geological structure complexity based on AHP-entropy weight coupling method [J].Coal Science and Technology,2022,50(11):140-149.

相似文献/References:

备注/Memo

备注/Memo:
收稿日期: 2023-07-26
* 基金项目: 国家自然科学基金项目(71941014)
作者简介: 王景春,博士,教授,主要研究方向为隧道工程及安全技术。
更新日期/Last Update: 2023-12-06