[1]陈瑞文,周志浩,戴文俊,等.杭州砂性富水地层盾构下穿公路隧道结构变形控制及综合接收施工技术[J].施工技术,2019,48(23):88-92.
CHEN Ruiwen,ZHOU Zhihao,DAI Wenjun,et al.Structural deformation control and comprehensive receiving construction technology of shield underpass highway tunnel in sandy water-rich stratum in Hangzhou [J].Construction Technology,2019,48(23):88-92.
[2]赵慧龙,宋战平,王军保.某矿山法施工隧道下穿公路数值模拟分析[J].现代隧道技术,2019,56(S2):340-346.
ZHAO Huilong,SONG Zhanping,WANG Junbao.Numerical simulation analysis of tunnel underpass highway constructed by mining method [J].Modern Tunnel Technology,2019,56(S2):340-346.
[3]方勇,符亚鹏,杨志浩,等.公路隧道下穿煤层采空区开挖过程相似模型试验[J].土木工程学报,2015,48(2):125-134.
FANG Yong,FU Yapeng,YANG Zhihao,et al.Similar model test on excavation process of highway tunnel under goaf of coal seam[J].China Civil Engineering Journal,2015,48(2):125-134.
[4]贾宝新,孙傲,陈浩,等.基于Peck公式铁路隧道下穿既有公路隧道路基沉降规律分析[J].公路,2018,63(7):318-323.
JIA Baoxin,SUN Ao,CHEN Hao,et al.Analysis of subgrade settlement of existing highway tunnel under railway Tunnel based on Peck Formula [J].Highway,2018,63(7):318-323.
[5]董捷,王志岗,仲帅.新建隧道下穿高速公路动力响应及变形控制研究[J].铁道标准设计,2019,63(8):133-139.
DONG Jie,WANG Zhigang,ZHONG Shuai.Research on dynamic response and deformation control of new tunnel under expressway [J].Railway Standard Design,2019,63(8):133-139.
[6]熊怡思,苏河修,周振梁,等.大断面公路隧道下穿水塘超前预支护技术研究[J].土木工程学报,2017,50(S2):182-186.
XIONG Yisi,SU Hexiu,ZHOU Zhenliang,et al.Study on pre-support technology for large cross-section highway tunnel under water pond[J].Journal of Civil Engineering,2017,50(S2):182-186.
[7]郑俊杰,包德勇,龚彦峰,等.铁路隧道下穿既有高速公路隧道施工控制技术研究[J].铁道工程学报,2006(8):80-84.
ZHENG Junjie,BAO Deyong,GONG Yanfeng,et al.Study on construction control technology of railway tunnel under existing expressway tunnel[J].Journal of Railway Engineering,2006(8):80-84.
[8]邓祥辉,袁岽洋,姚军,等.某超浅埋大跨隧道下穿既有公路施工工法研究[J].中外公路,2018,38(4):201-207.
DENG Xianghui,YUAN Dongyang,YAO Jun,et al.Research on construction method of an ultra-shallow buried long-span tunnel under existing highway [J].Sino-Foreign Highway,2018,38(4):201-207.
[9]黄海斌,周平,陈鹏,等.双线公路隧道下穿铁路隧道不同施工工法理论研究[J].铁道标准设计,2016,60(11):104-109.
HUNG Haibin,ZHOU Ping,CHEN Peng,et al.Theoretical research on different construction methods of double-track highway tunnel under railway tunnel [J].Railway Standard Design,2016,60(11):104-109.
[10]中华人民共和国交通部.公路隧道设计规范:JTG D70—2004 [S].重庆:重庆交通科研设计院,2004.
[11]HYODO M,YASUHARA K.Analytical procedure for evaluating pore-water pressure and deformation of saturated clay ground subjected to traffic loads[C]//Proceedings of the sixth International Conference on Numerical Methods in Geomechanics.Rotterdam:Balkema,1988:653-658.
[12]叶斌,叶为民,冯守中,等.交通循环荷载作用下粉土路基的动态响应[J].同济大学学报(自然科学版),2012,40(8):1135-1141.
YE Bin,YE Weimin,FENG Shouzhong,et al.Dynamic response of silty subgrade under cyclic traffic load[J].Journal of Tongji University (Natural Science),2012,40(8):1135-1141.
[13]中华人民共和国交通部.公路沥青路面设计规范;JTG D50—2006 [S].北京:中华人民共和国行业标准,2006.
[14]曹成勇,施成华,彭立敏,等.浅埋大跨下穿高速公路隧道施工风险评估及控制措施研究[J].铁道科学与工程学报,2016,13(7):1439-1446.
CAO Chengyong,SHI Chenghua,PENG Limin,et al.Study on construction risk assessment and control measures of shallow-buried large-span tunnel under expressway[J].Journal of Railway Science and Engineering,2016,13(7):1439-1446.
[1]王仁涛,王成虎,宋凯.青岛地铁超浅埋段爆破振动监测数据特征研究[J].中国安全生产科学技术,2015,11(12):72.[doi:10.11731/j.issn.1673-193x.2015.12.011]
WANG Ren-tao,WANG Cheng-hu,SONG Kai.Study on characteristics of monitoring data for blasting
vibration in the ultra-shallow buried section of Qingdao metro[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2015,11(4):72.[doi:10.11731/j.issn.1673-193x.2015.12.011]