[1]张继奎.圆梁山隧道特殊地质地段施工浅析[J].隧道建设,2004,24(5):44-50.
[2]曾桅栋,李海清.回弄山隧道灾害性涌水突泥的原因分析与对策研究[J].公路,2008,3:216-221.
[3]李利平,李术才,陈军,等.基于岩溶突涌水风险评价的隧道施工许可机制及其应用研究[J].岩石力学与工程学报,2011,30(7):1345-1355.
LI Liping,LI Shucai,CHEN Jun,et al.Construction license mechanism and its application based on karst water inrush risk evaluation [J].Chinese Journal of Rock Mechanics and Engineering,2011,30(7):1345-1355.
[4]舒森.岩溶隧道突水突泥预报综合评估[J].铁道标准设计,2015,59(4):72-78.
SHU Sen.Comprehensive assessment of prediction of water and mud bursting in karst tunnel [J].Railway Standard Design,2015,59(4):72-78.
[5]贾磊,李源,章岩,等.隧道突水突泥灾害的模糊预测和控制措施[J].灾害学,2014,29(2):69-71.
JIA Lei,LI Yuan,ZHANG Yan,et al.Fuzzy-prediction and control measures for water bursting and mud surging of tunnel [J].Journal of Catastrophology,2014,29(2):69-71.
[6]LI S C,WU J,XU Z H,et al.Unascertained measure model of water and mud inrush risk evaluation in karst tunnels and its engineering application[J].KSCE Journal of Civil Engineering,2017,21(4):1170-1182.
[7]李德毅,孟海军,史雪梅.隶属云和隶属云发生器[J].计算机研究与发展,1995(6):15-20.
LI Deyi,MENG Haijun,SHI Xuemei.Membership clouds and membership cloud generators [J].Journal of Computer Research and Development,1995(6):15-20.
[8]刘常昱,李德毅,杜鹢,等.正态云模型的统计分析[J].信息与控制,2005,34(2):236-239,248.
LIU Changyu,LI Deyi,DU Yi,et al.Some statistical analysis of the normal cloud model [J].Information and Control,2005,34(2):236-239,248.
[9]宋远骏,李德毅,杨孝宗,等.电子产品可靠性的云模型评价方法[J].电子学报,2000(12):75-77.
SONG Yuanjun,LI Deyi,YANG Xiaozong,et al.Reliability evaluation of electronic products based on cloud models [J].Acta Electronica Sinica,2000(12):75-77.
[10]徐钟,邓辉,卢平,等.隧道岩溶段涌水突泥风险评价体系初探[J].水利水电技术,2018,49(3):127-134.
XU Zhong,DENG Hui,LU Ping,et al.Preliminary study on risk evaluation system of water inrush and mud burst in karst section of tunnel [J].Water Resources and Hydropower Engineering,2018,49(3):127-134.
[11]翁其能,吴秉其,向帅,等.隧道涌水突泥风险评价模型研究[J].重庆交通大学学报 (自然科学版),2012,31(5):944-947.
WENG Qineng,WU Bingqi,XIANG Shuai,et al.Model study of risk accessment about water bursting and mud gushing in tunnel[J].Journal of Chongqing Jiaotong University (Natural Science),2012,31(5):944-947.
[12]杜毓超,韩行瑞,李兆林.基于 AHP 的岩溶隧道涌水专家评判系统及其应用[J].中国岩溶,2009,28(3):281-287.
DU Yuchao,HAN Xingrui,LI Zhaolin.Professional evaluation system for karst tunnel gushing based on AHP and its application [J].Carsologica Sinica,2009,28(3):281-287.
[13]杨光,刘敦文,褚夫蛟,等.基于云模型的隧道塌方风险等级评价[J].中国安全生产科学技术,2015,11(6):95-101.
YANG Guang,LIU Dunwen,CHU Fujiao,et al.Evaluation on risk grade of tunnel collapse based on cloud model [J].Journal of Safety Science and Technology,2015,11(6):95-101.
[14]交通运输部工程质量监督局.公路桥梁和隧道工程施工安全风险评估制度及指南解析[M].北京:人民交通出版社,2011.
[15]李术才,石少帅,李利平,等.三峡库区典型岩溶隧道突涌水灾害防治与应用[J].岩石力学与工程学报,2014,33(9):1887-1896.
LI Shucai,SHI Shaoshuai,LI Liping,et al.Control of water inrush in typical karst tunnels in three gorges reservoir area and its application [J].Chinese Journal of Rock Mechanics and Engineering,2014,33(9):1887-1896.
[16]李利平,李术才,陈军,等.基于岩溶突涌水风险评价的隧道施工许可机制及其应用研究[J].岩石力学与工程学报,2011,30(7):1345-1355.
LI Liping,LI Shucai,CHEN Jun,et al.Construction license mechanism and its application based on karst water inrush risk evaluation [J].Chinese Journal of Rock Mechanics and Engineering,2011,30(7):1345-1355.
[17]石少帅.深长隧道充填型致灾构造渗透失稳突涌水机理与风险控制及工程应用[D].济南:山东大学,2014.
[18]中华人民共和国住房和城乡建设部.地下工程防水技术规范:GB/T 50108—2008 [S].北京:中国计划出版社,2009.