[1]AZAM S,LI Q.Tailings dam failure:a review last one hundred years[J].Waster GEO Technics,2010,12:50-53.
[2]柴敬,袁强,汪志力,等.物理模型试验方法的应用分析[J].西安科技大学学报,2013,33(5):505-511.
CHAI Jing,YUAN Qiang,WANG Zhili,et al.Application analysis of physical model test method[J].Journal of Xi’an University of Science and Technology,2013,33(5):505-511.
[3]王协康,方铎.泥石流模型试验相似律分析[J].四川大学学报:工程科学版,2000,32(3):9-12.
WANG Xiekang,FANG Duo.Study on laws of debris flow model similarity[J].Journal of Sichuan University:Engineering Science Edition,2000,32(3):9-12.
[4]COLEMAN S E,ANDREWS D P,WEBBY M G.Overtopping breaching of non-cohesive homogeneous embankments[J].Journal of Hydraulic Engineering,2004,128(9):829-838.
[5]DUPONT E,DEWALS B,ARCHAMBEAU P,et al.Experimental and numerical study of the breaching of an embankment dam[J].Journal of Bacteriology,2007,189(9):3645-3649.
[6]HANSON G J,TEMPLE D M,ROBINSON K M,et al.Over view of dam gully erosion research[J].International Journal of Sediment Research,2005,20(3):259-269.
[7]MORRIS M W,HASSAN M,KORTENHAUS A,et al.Modelling breach initiation and growth[R].Munich:Hr Wallingford Limited,2008.
[8]MORRIS M W.CADAM:concerted action on dam break modelling[R].Munich:Hr Wallingford Limited,2000.
[9]MORRIS M W,HASSAN M A A M,VASKINN K A.Conclusions and recommendations from the IMPACT Project WP2:breach formation[R].Munich:Hr Wallingford Limited,2004.
[10]匡尚富.天然坝溃决的泥石流形成机理及其数学模型[J].泥沙研究,1993(4):42-57.
KUANG Shangfu.Formation mechanisms and prediction models of debris flow due to natural failures[J].Journal of Sediment Research,1993(4):42-57.
[11]赵天龙,陈生水,钟启明.尾矿坝溃决机理与溃坝过程研究进展[J].水利水运工程学报,2015(1):105-111.
ZHAO Tianlong,CHEN Shengshui,ZHONG Qiming.Advances in studies of tailing dam break mechanism and process[J].Hydro-Science and Engineering,2015(1):105-111.
[12]潘建平,王笙屹,朱洪威.尾矿坝液化流滑破坏模型与稳定措施研究[J].金属矿山,2011(4):134-136.
PAN Jianping,WANG Shengyi,ZHU Hongwei.Study on flow slide destruction models induced by seismic liquefaction and stabilizing measures of tailings dam[J].Metal Mine,2011(4):134-136.
[13]魏勇,赵安文,许开立.尾矿库坝基管涌破坏试验[J].金属矿山,2015(9):157-160.
WEI Yong,ZHAO Anwen,XU Kaili.Failure experiment of tailings dam foundation piping[J].Metal Mine,2015(9):157-160.
[14]肖经光,姚美良,槐以高,等.上游式尾矿坝漫顶溃坝的溃口扩展机理[J].价值工程,2017,36(19):117-119.
XIAO Jingguang,YAO Meiliang,HUAI Yigao,et al.Expansion mechanism of collapse gates of upstream tailings dam break due to overtopping[J].Value Engineering,2017,36(19):117-119.
[15]敬小非,尹光志,魏作安,等.尾矿坝垮塌机制与溃决模式试验研究[J].岩土力学,2011,32(5):1377-1384,1404.
JING Xiaofei,YIN Guangzhi,WEI Zuoan,et al.Model experimental study of collapse mechanism and broken mode of tailings dam[J].Chinese Journal of Rock and Soil Mechanics,2011,32(5):1377-1384,1404.
[16]楚金旺,宋会彬,张红武.尾矿库漫顶溃坝模型试验研究[J].中国矿山工程,2015,44(3):73-77.
CHU Jinwang,SONG Huibin,ZHANG Hongwu.Experimental study on tailing dam break due to overtopping[J].China Mine Engineering,2015,44(3):73-77.
[17]曹帅,张红武,赵晨苏,等.变坝坡赤泥库漫顶溃坝模型试验研究[J].水利学报,2019,50(4):428-439.
CAO Shuai,ZHANG Hongwu,ZHAO Chensu,et al.Experimental study on dam-break of a red mud reservoir with complex dam slopes[J].Journal of Hydraulic Engineering,2019,50(4):428-439.
[18]党显璋,高茂生,张力霆,等.不同堆积密实度下尾矿库洪水漫顶溃坝的模型试验研究[J].海洋地质前沿,2019,34(9):79-85.
DANG Xianzhang,GAO Maosheng,ZHANG Liting,et al.Experimental study on the model of flood overtopping and dam break of a tailing pond under different deposit compactness[J].Marine Geology Frontuers,2019,34(9):79-85.
[19]杨玉婷,王光进,艾敏,等.尾矿库渗流溃坝模型试验研究[J].矿冶,2019,28(5):15-20.
YANG Yuting,WANG Guangjin,AI Min,et al.Experimental study on dam break model of seepage in tailing reservoir[J].Mining and Metallurgy,2019,28(5):15-20.
[20]敬小非,尹光志,魏作安,等.基于不同溃口形态的尾矿坝溃决泥浆流动特性试验研究[J].岩土力学,2012,33(3):745-752.
JING Xiaofei,YIN Guangzhi,WEI Zuoan,et al.Study of tailings dam-break surges with floating slurry in model experiment in different collapse gates[J].Rock and Soil Mechanics,2012,33(3):745-752.
[21]尹光志,敬小非,魏作安,等.尾矿坝溃坝相似模拟试验研究[J].岩石力学与工程学报,2010,29(S2):3830-3838.
YIN Guangzhi,JING Xiaofei,WEI Zuoan,et al.Experimental study of similar simulation of tailings dam-break[J].Chinese Journal of Rock Mechanics and Engineering,2010,29(S2):3830-3838.
[22]刘磊,张红武,钟德钰,等.尾矿库漫顶溃坝模型研究[J].水利学报,2014,45(6):675-681.
LIU Lei,ZHANG Hongwu,ZHONG Deyu,et al.Research on tailings dam break due to overtopping[J].Journal of Hydraulic Engineering,2014,45(6):675-681.
[23]邵军,甘莎莎,何新春.溃坝模拟试验在尾矿库环境风险评价中的应用[J].中国矿山工程,2016,45(2):64-67.
SHAO Jun,GAN Shasha,HE Xincun.Application of dam break simulation test in environmental risk assessment of tailing pond[J].China Mine Engineering,2016,45(2):64-67.
[24]辛保泉,万露,耿龙龙,等.尾矿库溃坝室外模型试验及灾害预测分析[J].中国安全生产科学技术,2018,14(5):102-108.
XIN Baoquan,WAN Lu,GENG Longlong,et al.Outdoor model tests and disaster prediction analysis of dam break in tailings reservoir[J].Journal of Safety Science and Technology,2018,14(5):102-108.
[25]张东明,郑彬彬,尹光志,等.高浓缩分级尾矿上游法堆坝及模型试验研究[J].岩土力学,2016,37(7):1832-1838,1867.
ZHANG Dongming,ZHENG Binbin,YIN Guangzhi,et al.Model tests on upstream dam-building method using concentrated and classified tailings[J].Rock and Soil Mechanics,2016,37(7):1832-1838,1867.
[26]尹光志,李愿,魏作安,等.洪水工况下尾矿库浸润线变化规律及稳定性分析[J].重庆大学学报,2010,33(3):72-75,86.
YIN Guangzhi,LI Yuan,WEI Zuoan,et al.Regularity of the saturation lines change and stability analysis of tailings dam in the condition of flood[J].Journal of Chongqing University,2010,33(3):72-75,86.
[27]敬小非,尹光志,魏作安,等.模型试验与数值模拟对尾矿坝稳定性综合预测[J].重庆大学学报,2009,32(3):308-313.
JING Xiaofei,YIN Guangzhi,WEI Zuoan,et al.Model test and numerical simulation of tailing dam safety forecasting[J].Journal of Chongqing University,2009,32(3):308-313.
[28]张敏哲,金爱兵,王志凯,等.尾矿坝稳定性物理模型试验研究[J].金属矿山,2013(12):115-117.
ZHANG Minzhe,JIN Aibing,WANG Zhikai,et al.On the physical model tests of tailings dam stability[J].Metal Mine,2013(12):115-117.
[29]张卫中,康钦容,曹冠森,等.云南某铜尾矿库不同堆坝速率稳定性分析[J].金属矿山,2016(11):39-42.
ZHANG Weizhong,KANG Qinrong,CAO Guansen,et al.Stability analysis of different construction rates of a copper tailings dam in Yunnan province[J].Metal Mine,2016(11):39-42.
[30]赵一姝,敬小非,周筱,等.筋带对尾矿坝漫坝破坏过程阻滞作用试验研究[J].中国安全科学学报,2016,26(1):94-99.
ZHAO Yishu,JING Xiaofei,ZHOU Xiao,et al.Experimental study on blocking action of bar strip on tailings dam overtopping[J].China Safety Science Journal,2016,26(1):94-99.
[31]尹光志,魏作安,万玲,等.细粒尾矿堆坝加筋加固模型试验研究[J].岩石力学与工程学报,2005,24(6):1030-1034.
YIN Guangzhi,WEI Zuoan,WAN Ling,et al.Test study on stability of fine grained tailings dam in geo-grid reinforcement situation[J].Chinese Journal of Rock Mechanics and Engineering,2005,24(6):1030-1034.
[32]敬小非,周筱,赵一姝,等.筋带密度对尾矿坝漫顶破坏规律影响研究[J].中国安全生产科学技术,2016,12(8):68-74.
JING Xiaofei,ZHOU Xiao,ZHAO Yishu,et al.Impact study on spacing of geogrid of tailing dam break due to overtopping[J].Journal of Safety Science and Technology,2016,12(8):68-74.
[33]唐建新,尹光志,魏作安,等.龙都尾矿库细粒尾矿堆坝模型试验研究[J].中国矿业,2004,13(1):55-57.
TANG Jianxin,YIN Guangzhi,WEI Zuoan,et al.Model test study of fine grained tailings dam of Longdu tailings pone[J].China Mining Magazine,2004,13(1):55-57.
[1]李全明,田文旗,王云海,等.尾矿库在线监测系统中位移数据分析方法探讨[J].中国安全生产科学技术,2011,7(8):47.
LI Quan-ming,TIAN Wen-qi,WANG Yun-hai.Study on displacement analysis methods of tailing ponds on-line monitoring system[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2011,7(12):47.
[2]许元木.浅谈尾矿坝削坡[J].中国安全生产科学技术,2011,7(11):132.
XU Yuan-mu.A superficial analysis on tailings dam cutting slope[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2011,7(12):132.
[3]梅国栋,吴宗之.尾矿库溃坝风险定量评价方法探讨[J].中国安全生产科学技术,2012,8(2):78.
MEI Guo dong,WU Zong zhi.Discussion on quantitative assessment method of dam failure risks in tailings dam[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2012,8(12):78.
[4]孙恩吉,张兴凯,李仲学,等.降雨条件下尾矿坝饱和-半饱和渗流模拟分析[J].中国安全生产科学技术,2012,8(3):5.
SUN En ji,ZHANG Xing kai,LI Zhong xue,et al.Simulation analysis on tailings dam saturated and semisaturation infiltration of under rainfall conditions[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2012,8(12):5.
[5]李钢.基于灰色系统理论的尾矿库坝体
形变位移预测方法[J].中国安全生产科学技术,2012,8(4):107.
LI Gang.Research on the displacement forecasting methods of tailings
dam deformation based on the gray system theory[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2012,8(12):107.
[6]梅国栋.尾矿库溃坝灾害脆弱性评估指标体系及方法研究[J].中国安全生产科学技术,2012,8(12):11.
MEI Guo dong.Research on the dambreak hazard vulnerability assessment index system and methods of tailings pond[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2012,8(12):11.
[7]蔡嗣经,张栋,吴宗之.尾矿库地震溃坝模糊风险评估方法探讨[J].中国安全生产科学技术,2011,7(7):10.
CAI Shi Jing,ZHANG Dong,WU Zong Zhi.Discussion on Tailings Reservoir Dam fuzzy risk assessment model Under Seismic Conditions[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2011,7(12):10.
[8]张栋,吴宗之,蔡嗣经.尾矿库地震液化机理及抗震评估指标体系研究[J].中国安全生产科学技术,2010,6(6):17.
ZHANG Dong,WU Zong-zhi,CAI Shi-jing.Discussion on tailings reservoir dam failure risk assessment index system under seismic conditions[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2010,6(12):17.
[9]梅国栋,王云海.我国尾矿库事故统计分析与对策研究[J].中国安全生产科学技术,2010,6(3):211.
MEI Guo-dong,WANG Yun-hai.Statistic analysis and countermeasure study on tailings pond accidents in China[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2010,6(12):211.
[10]郭朝阳,唐治亚.尾矿库溃坝模型探讨[J].中国安全生产科学技术,2010,6(1):63.
GUO Chao-yang,TANG Zhi-ya.Study on the tailings dam-break model[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2010,6(12):63.