[1]VAIDYA O S, KUMAR S. Analytic hierarchy process: An overview of applications[J]. European Journal of Operational Research, 2006, 169(1): 1-29.
[2]ANDRIC' J M, LU DG. Risk assessment of bridges under multiple hazards in operation period[J]. Safety Science, 2016, 83: 80-92.
[3]ANTHONY C J. What’s wrong with risk matrices? [J]. Risk Analysis: An International Journal, 2008, 28(2): 497-512.
[4]ELHAG T M S, WANG Y M. Risk assessment for bridge maintenance projects: neural networks versus regression techniques[J]. Journal of Computing in Civil Engineering, 2007, 21(6): 402-409.
[5]刘小勇,沈立,孙明义.桥梁工程规划设计阶段施工安全风险评估的研究[J].中国安全生产科学技术,2012,8(8):79-83.
LIU Xiaoyong, SHEN Li, SUN Mingyi. Research on the construction safety risk assessment in the planning and design stages of bridge engineering[J]. Journal of Safety Science and Technology,2012,8(8):79-83.
[6]桂志敬,吴忠广,严琼, 等.公路隧道施工安全风险评估方法优化研究[J].中国安全生产科学技术,2018,14(9):136-143.
GUI Zhijing, WU Zhongguang, YAN Qiong, et al. Study on optimization of safety risk assessment method for highway tunnel construction[J]. Journal of Safety Science and Technology,2018,14(9):136-143.
[7]曹吉鸣, 申良法, 彭为, 等. 风险链视角下建设项目进度风险评估[J]. 同济大学学报(自然科学版),2015,43(3):468-474.
CAO Jiming, SHEN Liangfa, PENG Wei, et al. Novel method for schedule risks assessment in construction projects from perspective of risk chain[J]. Journal of Tongji University (Natural Science), 2015, 43(3): 468-474.
[8]RAJ T, SHANKAR R, SUHAIBM. An ISM approach for modelling the enablers of flexible manufacturing system: The case for India[J]. International Journal of Production Research, 2008, 46(24): 6883-6912.
[9]张磊, 樊治平, 乐琦. 考虑风险关联情形的风险评估方法研究[J]. 运筹与管理, 2011 (6): 188-195.
ZHANG Lei, FAN Zhiping, YUE Qi. A method for estimating risks considering the interrelationships among risks[J]. Operations Research and Management, 2011 (6): 188-195.
[10]李存斌, 陆龚曙. 工程项目风险元传递的系统动力学模型[J]. 系统工程理论与实践, 2012, 32(12): 2731-2739.
LI Cunbin, LU Gongshu. System dynamics model of construction project risk element transmission[J]. Systems Engineering-Theory & Practice, 2012, 32(12): 2731-2739.
[11]李藐, 陈建国, 陈涛, 等. 突发事件的事件链概率模型[J]. 清华大学学报(自然科学版), 2010 (8): 1173-1177.
LI Miao, CHEN Jianguo, CHEN Tao, et al. Probability for disaster chains in emergencies[J]. Journal of Tsinghua University(Science and Technology), 2010 (8): 1173-1177.
[12]李继清, 张玉山, 王丽萍, 等. 洪灾综合风险结构与综合评价方法 (Ⅰ)—宏观方面[J]. 武汉大学学报(工学版), 2005, 38(5): 19-23.
LI Jiqing, ZHANG Yushan, WANG Liping, et al. Structure and evaluation of integrated risk for flood disaster (Ⅰ)-macro-view[J]. Engineering Journal of Wuhan University, 2005, 38(5): 19-23.
[13]YANG X, CHENG L, HUANG M, et al. Research on Risk Assessment Model in Waters Adjoining Bridge Based on Bayesian Network[C]//ICTIS 2011: Multimodal Approach to Sustained Transportation System Development[A].Information, Technology, Implementation, 2011: 2597-2605.
[14]ESKESEN S D, TENGBORG P, KAMPMANNJ, et al. Guidelines for tunnelling risk management: international tunnelling association, working group No. 2[J]. Tunnelling and Underground Space Technology, 2004, 19(3): 217-237.
[15]李书韬, 程进. 模糊层次分析方法在大跨度桥梁施工期风险评估中的应用[J]. 结构工程师, 2011, 27(5): 159-162.
LI Shutao, CHENG Jin. AHP-FCE method for construction period risk evaluation of long-span bridges[J]. Structural Engineers, 2011, 27(5): 159-162.