|本期目录/Table of Contents|

[1]罗广强,雷阳,于正兴,等.复杂形态井巷工程三维激光扫描与MIDAS-FLAC3D耦合建模稳定性分析研究[J].中国安全生产科学技术,2016,12(11):31-35.[doi:10.11731/j.issn.1673-193x.2016.11.005]
 LUO Guangqiang,LEI Yang,YU Zhengxing,et al.Study on stability analysis of mining well project with complex shape by 3D laser scanning and MIDAS-FLAC3D coupled modeling[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2016,12(11):31-35.[doi:10.11731/j.issn.1673-193x.2016.11.005]
点击复制

复杂形态井巷工程三维激光扫描与MIDAS-FLAC3D耦合建模稳定性分析研究

《中国安全生产科学技术》[ISSN:1673-193X/CN:11-5335/TB]

卷:
12
期数:
2016年11期
页码:
31-35
栏目:
学术论著
出版日期:
2016-11-30

文章信息/Info

Title:
Study on stability analysis of mining well project with complex shape by 3D laser scanning and MIDAS-FLAC3D coupled modeling
文章编号:
1673-193X(2016)-11-0031-05
作者:
罗广强1雷阳1于正兴2姜颖1洪学娣1
(1. 唐山工业职业技术学院,唐山 063000;2.中国安全生产科学研究院,北京 100012)
Author(s):
LUO Guangqiang1 LEI Yang1YU Zhengxing2 JIANG Ying1 HONG Xuedi1
(1. Tangshan Industrial Vocational Technical College, Tangshan Hebei 063000, China; 2. China Academy of Safety & Technology, Beijing 100012, China)
关键词:
三维激光扫描井巷工程复杂模型耦合计算稳定性分析
Keywords:
3D laser scanning mining well project complicated model coupled calculation stability analysis
分类号:
X936
DOI:
10.11731/j.issn.1673-193x.2016.11.005
文献标志码:
A
摘要:
受井巷工程空间形态的复杂性及探测技术的局限性影响,部分人员无法进入的复杂形态井巷工程的实际空间形态往往很难准确获得,复杂井巷工程的数值分析往往很难进行建模或建立模型与实际误差较大,而在此基础上进行的稳定性分析结果可靠性往往较差。采用三维激光扫描技术对复杂形态井巷工程进行三维激光点云扫描,基于点云数据运用MIDAS软件建立精确形态的复杂井巷工程模型,通过耦合技术建立最终可以在FLAC3D中进行运算并且与实际形态相一致的数值模型。最后以某矿山主溜井为工程实例,利用三维激光精确扫描技术获取该井巷工程的实际空间形态,在此基础上进行MIDAS与FLAC3D耦合方法的建模分析,对该复杂井巷工程的稳定状况进行了稳定性分析。
Abstract:
Due to the influence of complex spatial shape of mining well project and the limitation of detection technology, it is hard to accurately obtain the actual spatial shape of mining well project with complex shape, which the personnel cannot get into. In the numerical analysis of complex mining well project, it is hard to carry out modeling, or the established model has a large error against reality, so the results of stability analysis on this basis has a poor reliability. The 3D laser scanning technology was used to carry out 3D laser point cloud scanning on the mining well project with complex shape. Based on the data of point cloud, a model of complex mining well project with accurate shape was established by using MIDAS software. A numerical model which can perform computation in FLAC3D and be consistent with actual shape was establish through the coupling technology. Finally, taking the main ore pass of a certain mine as example, the 3D laser accurate scanning technology was applied to obtain the actual spatial shape of this mining well project, and on this basis, the modeling analysis by coupling MIDAS with FLAC3D was conducted, then the stability analysis on the stability status of this complex mining well project was carried out.

参考文献/References:

[1]马海涛,刘勇锋,胡家国. 基于C-ALS采空区探测及三维模型可视化研究[J]. 中国安全生产科学技术, 2010,6(3): 38-41. MA Haitao, LIU Yongfeng, HU Jiaguo. Study on gob detection and visualization of three-dimensional model based on C-ALS[J]. Journal of Safety Science and Technology, 2010, 6(3): 38-41.
[2]秦宏楠,李长洪,马海涛,等. 基于颗粒流的溜井冲击破坏规律研究[J]. 中国安全生产科学技术, 2015, 11(4): 33-39. QIN Hongnan, LI Changhong, MA Haitao, et al. Study on impact damage laws of ore pass based on particle flow[J]. Journal of Safety Science and Technology, 2015, 11(4): 33-39.
[3]明世祥. 地下金属矿山主溜井变形破坏机理分析[J]. 金属矿山, 2004(1): 5-8. MING Shixiang. Analysis of deformation destruction mechanism of main pass in underground metal mines[J]. Metal Mine, 2004(1): 5-8.
[4]陈得信,王克宏,王兴国,等. 盘区脉外溜井破坏原因分析及井筒维护[J]. 有色金属(矿山部分), 2009, 61(3): 15-18. CHEN Dexin, WANG Kehong, WANG Xingguo, et al. Maintenance and destroy cause analysis of the ore pass out of the vein[J]. Nonferrous Metals(Mining Section), 2009, 61(3): 15-18.
[5]周建华,周根明. 主溜井垮塌分析与研究[J]. 有色矿山, 2001, 30(1): 9-13. ZHOU Jianhua, ZHOU Genming. Analysis and study of main chute falling[J].Nonferrous Mines, 2001, 30(1): 9-13.
[6]李长洪,蔡美峰,乔兰,等. 某矿主溜井塌落破坏成因分析及其防治对策[J]. 中国矿业, 1999, 8(6): 37-39. LI Changhong, CAI Meifeng, QIAO Lan, et al. Analysis of causes of cave-in of a main ore-pass and its prevention measures[J]. China Mining Magazine, 1999, 8(6): 37-39.
[7]宋卫东,王金安,匡忠祥. 程潮铁矿淹井前后采场溜井稳定性数值分析[J]. 北京科技大学学报, 2000, 22(4): 292-295. SONG Weidong, WANGJinan, KUANG Zhongxiang. Numerical analysis on the shope orepass stability in the pit of Chengchao iron mine in front and behind submerged well[J]. Journal of University of Science and Technology Beijing, 2000, 22(4): 292-295.
[8]宋卫东,匡忠祥. 采场溜井加固工程围岩稳定性数值计算分析[J]. 金属矿山, 2001(6): 23-25. SONG Weidong, KUANG Zhongxiang. Numercal calculation analysis of the surrounding rock stability of the reinforcement engineering[J]. Metal Mine, 2001(6):23-25.
[9]高永涛,王金安,宋卫东,等. 一种治理主溜井特大塌方的新方法--托斗法[J]. 岩石力学与工程学报, 2002, 21(4): 540-545. GAO Yongtao, WANG Jinan, SONG Weidong, et al. A new technique-supporting funnel method used in recovering and controlling of large-scale collapsed main transportation shaft[J]. Chinese Journal of Rock Mechanice and Engineering, 2002, 21(4): 540-545.
[10]宋卫东,高永涛,吴顺川,等. 二次高压灌浆预应力锚固技术在程潮铁矿2~#主溜井加固工程中的应用[J]. 黄金, 2001, 22(8): 18-21. SONG Weidong, GAO Yongtao, WU Shunchuan, et al. Application of the technology of prestressed anchor by secondary high-pressure grouting in the reinforcement of main ore-pass No.2 at Chengchao Iron Mine[J]. Gold, 2001, 22(8): 18-21.
[11]秦宏楠,张法胜,窦梅林,等. TRT技术在采矿工程中的应用[J]. 中国安全生产科学技术, 2013, 9(11): 78-82. QIN Hongnan, ZHANG Fasheng, DOU Meilin, et al. Application of TRT technology in mining engineering [J]. Journal of Safety Science and Technology, 2013, 9(11): 78-82.
[12]杨镜明,魏周政,高晓伟. 高密度电阻率法和瞬变电磁法在煤田采空区勘查及注浆检测中的应用[J]. 地球物理学进展, 2014, 29(1): 362-369. YANG Jingming, WEI Zhouzheng, GAO Xiaowei. The application of the methods of high density resistivity method and transient electromagnetic to detecting coal mining goaf and to inspect grouting effect[J]. Progress in Geophysics, 2014, 29(1): 362-369.
[13]白冰,周健. 探地雷达测试技术发展概况及其应用现状[J]. 岩石力学与工程学报,2001, 20(4): 527-531. Bai Bing,Zhou Jian. Advance and applications of ground penetrating radar measuring technology[J]. Chinese Journal of Rock Mechanics and Engineering, 2001, 20(4): 527-531.
[14]张开元,韩自豪,周韬. 瞬变电磁法在探测煤矿采空区中的应用[J]. 工程地球物理学报. 2007, 4(4): 341-344. ZHANG Kaiyuan, HANZihao, ZHOUTao. Application of transient electromagnetic method in coal gob[J]. Chinese Journal of Engineering Geophysics, 2007, 4(4): 341-344.
[15]祁民,张宝林,梁光河,等. 高分辨率预测地下复杂采空区的空间分布特征--高密度电法在山西阳泉某复杂采空区中的初步应用研究[J]. 地球物理学进展, 2006, 21(1): 256-262. QI Min, ZHANG Baolin, LIANG Guanghe, et al. High-resolution prediction of space distribution characteristics of complicated underground cavities-preliminary application of high-density electrical technique in an area of Yangquan, Shanxi[J]. Progress in Geophysics, 2006, 21(1): 256-262.
[16]徐白山,王恩德,陈庆凯,等. 利用EH-4确定煤矿采空区的边界[J]. 东北大学学报(自然科学版), 2006, 27(7): 810-813. XU Baishan, WANG Ende, CHEN Qingkai, et al. Determination of coal mine gob edges by EH-4 system[J].Journal of Northeastern University(Natural Science), 2006,27(7): 810-813.
[17]刘勇锋,马海涛,付士根. 综合物探技术在老空区水害防治中的应用[J]. 中国安全生产科学技术, 2010, 6(6): 103-107. LIU Yongfeng, MA Haitao, FU Shigen. Application of comprehensive geophysical exploration technology in prevention and control of goaf water disaster[J]. Journal of Safety Science and Technology, 2010, 6(6): 103-107.
[18]张生,马海涛,王虎. 安徽开发矿业有限公司3#主溜井治理方案研究[J]. 中国安全生产科学技术, 2014, 10(S): 276-281. ZHANG Sheng, MA Haitao, WANG Hu. Study on treatment scheme of 3# main chute in Anhui Development Mining Co., LTD[J]. Journal of Safety Science and Technology, 2014, 10(S): 276-281.

相似文献/References:

[1]王虎,张海清,刘勇锋,等.露天矿山隐伏盲空区精确探测及爆破优化设计[J].中国安全生产科学技术,2019,15(11):137.[doi:10.11731/j.issn.1673-193x.2019.11.022]
 WANG Hu,ZHANG Haiqing,LIU Yongfeng,et al.Accurate detection and blasting optimization design of concealed unknown underground goaf in openpit mine[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2019,15(11):137.[doi:10.11731/j.issn.1673-193x.2019.11.022]
[2]石萍萍,李海港,熊忠航,等.基于不同降雨条件下的尾矿库边坡变形演化特征研究*[J].中国安全生产科学技术,2025,21(11):25.[doi:10.11731/j.issn.1673-193x.2025.11.003]
 SHI Pingping,LI Haigang,XIONG Zhonghang,et al.Research on the evolution characteristics of tailings-dam slope deformation under different rainfall conditions[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2025,21(11):25.[doi:10.11731/j.issn.1673-193x.2025.11.003]

备注/Memo

备注/Memo:
中国安全生产科学研究院基本科研业务费专项资金项目
更新日期/Last Update: 2017-01-04