[1]卢进南,毛君,谢苗,张睿.巷道超前支架全支撑态动力学模型[J].煤炭学报,2015,40(1):50-57.
LU Jinnan, MAO Jun, XIE Miao, et al.Dynamics model of advanced powered support in heading under full
support situation[J].Journal of China Coal Society,2015,40(1):50-57.
[2]谢苗,白雅静,毛君,董先瑞,卢进南.不同工况下超前支护装备的模态分析[J].工程设计学报,2015,22(3):236-
242.
XIE Miao,BAI Yajing,MAO Jun,et al.Modal analysis of supporting in advance equipment under different
working conditions[J]. Chinese Journal of Engineering Design,2015,22(3):236-242.
[3]毛君,郑广辉,谢苗,潘德文.模糊PID的超前时支护装备支撑力自动控制系统[J].智能系统学报,2015(5):762-
768.
MAO Jun, ZHENG Guanghui, XIE Miao, et al. Support Force Automatic Control System Of Advanced Supporting
Equipment Based On Fuzzy-PID[J]. CAAI Transactions on Intelligent Systems, 2015(5):762-768.
[4]栾丽君, 姚立泽, 齐建峰,等. 自移式掘进机辅助支护设备立柱力学分析[J].辽宁工程技术大学学报(自然科
学版),2013,32(4):527-530.
LUAN Lijun, YAO Lize, QI Jianfeng, et al. Column mechanics analysis of self - motion assistanced powered
support equipment for tunneling machine[J]. Journal of Liaoning Technical University(Natural Science),
2013,32(4):527-530.
[5]栾丽君, 任金萍, 卢景文.巷道用自移式辅助支护设备顶梁的优化及有限元分析[J]. 煤矿机械,2010,31
(3):93-94.
LUAN Lijun, REN Jinping, LU Jingwen. Optimization and Finite-element Analysis of Self-motion Assitanced
Powered Support Equipment for Roadway[J]. Coal Mine Machinery, 2010,31(3):93-94.
[6]谢苗,刘治翔,毛君,等.迈步式超前支护系统设计与支护特性研究[J].机械强度,2016,38(2):302-310.
XIE Miao, LIU Zhixiang, MAO Jun,et al. Design on Step-type Advanced Supporting System and Research on
the Support Characteristics [J].Journal of Mechanical Strength, 2016,38(2): 302-310.
[7]毛君,郑广辉,谢苗,潘德文.模糊PID的超前时支护装备支撑力自动控制系统[J].智能系统学报, 2015,10(7):56
-60.
MAO Jun, ZHENG Guanghui, XIE Miao, et al. Support Force Automatic Control System Of Advanced Supporting
Equipment Based On Fuzzy-PID[J]. CAAI Transactions on Intelligent Systems,2015,10(7):56-60.
[8]谢苗,刘治翔,鲁启通,田丰旭,毛君.超前支架迈步过程稳定控制方法研究[J].中国安全科学学报, 2015,25
(3):54-59.
XIE Miao,LIU Zhixiang,LU Qitong,et al.Study on method for controlling stability of advanced support
in step process[J].China Safety Science Journal,2015,25(3):54-59.
[9]谢苗,刘治翔,池城,毛君.巷道超前支架的电液伺服位置压力复合控制方法[J].中国机械工程,2016,27(2):1-7.
XIE Miao,LIU Zhixiang,CHI Cheng,et al.Electro-hydraulic servo position and pressure hybrid control
method of forepoling system on tunnelling[J]. China Mechanical Engineering,2016,27(2):239-245.
[10]谢苗,刘治翔,毛君.综掘巷道超前支护装备多缸同步控制方法研究[J].工程设计学报,2015,22(2):193-200.
XIE Miao,LIU Zhixiang,MAO Jun.Multi-cylinder synchronous control method for advanced support of
roadway support equipment[J]. Chinese Journal of Engineering Design,2015,22(2):193-200.
[11]YAN W,KOMVOPOULOUS K. Contact analysis of elastic plastic surfaces[J]. Journal of Applied
Physics,1998,84:3617-362.
[12]郝培,余海东,赵勇.考虑隧道表面特性的硬岩全断面掘进装备撑靴接触界面刚度分析[J].上海交通大学学
报,2014,48(6):827-832.
HAO Pei, YU Haidong, ZHAO Yong.Normal stiffness of tunnel surface contacting with thrusting boots of TBM
with various surface characteristics[J].Journal of Shanghai Jiao Tong University,2014,48 (6):827-832.
[13]余海东,郝培,赵勇等.硬岩掘进装备支撑系统界面接触刚度非线性特性[J].机械工程学报,2014,50(21):54-59.
YU Haidong, HAO Pei, ZHAO Yong,et al.Non-linear Behavior of Normal Contact Stiffness of Tunnel Surface
and Supporting System of Tunnel Boring Machines[J].Journal of Mechanical Engineering,2014,50(21):54-
59.
[14]王苏彧,高峰,李睿,等.基于PCC的任意巷道断面自动截割成形控制系统[J].煤炭学报,2013,38(S1):261-266.
WANG Suyu, GAO Feng, LI Rui, et al. Control system of automatic arbitrary roadway section cutting and
forming based on PCC [J]. Journal of China Coal Society,2013,38(S1):261-266.
[15]成凌飞,张冰丽,吕楠.基于积分形式的矩形巷道粗糙度损耗公式的优化[J].河南理工大学学报(自然科学
版),2015, 34(6):836-840.
CHENG Lingfei, ZAHNG Bingli, LV Nan. Optimization of roughness loss formula of rectangular tunnel based
on the integral form[J]. Journal of Henan Polytechnic University( Natural Science),2015,34(6):836-840.