|本期目录/Table of Contents|

[1]陈善乐,汪华君,崔铁军.近距离煤层大断面切眼支护稳定周期分析[J].中国安全生产科学技术,2014,10(8):28-33.[doi:10.11731/j.issn.1673-193x.2014.08.005]
 CHEN Shan-le,WANG Hua-jun,CUI Tie-jun.Stable period analysis of large section open-off cut support in close coal seam[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2014,10(8):28-33.[doi:10.11731/j.issn.1673-193x.2014.08.005]
点击复制

近距离煤层大断面切眼支护稳定周期分析
分享到:

《中国安全生产科学技术》[ISSN:1673-193X/CN:11-5335/TB]

卷:
10
期数:
2014年8期
页码:
28-33
栏目:
学术论著
出版日期:
2014-08-31

文章信息/Info

Title:
Stable period analysis of large section open-off cut support in close coal seam
作者:
陈善乐12汪华君2崔铁军13
(1. 辽宁工程技术大学 安全科学与工程学院, 辽宁 阜新 123000; 2. 毕节学院 资源与安全工程学院, 贵州 毕节 551700;3. 大连交通大学 辽宁省隧道与地下结构工程技术研究中心, 辽宁 大连 116028)
Author(s):
CHEN Shan-le12 WANG Hua-jun2 CUI Tie-jun13
(1. College of Safety Science and Engineering, Liaoning Technical University, Fuxin Liaoning 123000, China; 2. College of Resources and safety engineering, Bijie University, Bijie Guizhou 551700, China; 3. Tunnel & Underground Structure Engineering Center of Liaoning, Dalian Jiaotong University, Dalian Liaoning 116028, China)
关键词:
近距离煤层开切眼稳定周期
Keywords:
close coal seam openoff cut stable period
分类号:
X936
DOI:
10.11731/j.issn.1673-193x.2014.08.005
文献标志码:
A
摘要:
在近距离煤层群的下行开采中,上位煤层的回采直接影响到下位煤层开切眼围岩的应力分布、破坏规律以及围岩的运移规律,从而影响到切眼的支护方式。为了分析下位煤层工作面切眼锚杆支护的稳定周期,利用基于三维显式有限差分法的计算工具Flac3D,以矿井近距离煤层工作面10603的切眼支护为工程实例,对比分析了上位煤层开采后,切眼围岩在支护前和支护后的应力分布、破坏规律和运移规律。结果表明,切眼进行锚杆支护后,应力集中带及影响范围都减少了50%,围岩剪应力由支护前的2.5 MPa降低到支护后的0.6 MPa,围岩塑性区域比支护前减少了40%,有效地控制了围岩的破坏,且切眼顶底板稳定周期为26天,两帮稳定周期为28~30天
Abstract:
In the downward mining of close distance coal seam group, the mining of upper coal seam directly affects the stress distribution, damage law and migration law of surrounding rock in lower coal seam, thereby affecting the support pattern of openoff cut. In order to analysis the stable period of openoff cut support in lower coal seam with anchor bolt support, by using the computing tools Flac3D, which was based on three dimensional explicit finite difference method, and taking the 10603 working face in close coal seam as example, the stress distribution, damage law and migration law of openoff cut under support or not, with the upper coal seam has been mined, were comparatively analyzed. The results showed that after the openoff cut has been supported with anchor bolt, the stress concentration belt and its influence scope of surrounding rock are decreased by 50%, the shear stress of surrounding rock has down to 0.6 MPa from 2.5 MPa, the plastic area of surrounding rock reduces by more than 40%, the stable period of roof and floor is 26 days, and the stable period of sides is 28~30 days.

参考文献/References:

[1]张少帅,杨胜强,鹿存荣.基于瓦斯涌出量预测的近距离煤层群开采顺序优化选择[J].中国安全生产科学技术,2011,7(9):6063 ZHANG Shaoshuai, YANG Shengqiang, LU Cunrong. Optimization of mining sequence at closed distance seam group based on the gas emission prediction[J]. Journal of Safety Science and Technology, 2011,7(9):6063
[2]李浩,石必明,李耀.强突松软近距离煤层群石门揭煤防突技术研究[J].中国安全生产科学技术,2014,10(1):98102 LI Hao, SHI Biming, LI Yao. Study on technologies of rock crosscut coal uncovering and avoiding outburst of gas in condition of soft seams with strong gas outburst risk in short distance[J].Journal of Safety Science and Technology, 2014,10(1):98102
[3]马立强,汪理全,张东升,等.近距离煤层群上行开采可行性研究与工程应用[J].湖南科技大学学报(自然科学版),2007, 22(4):15 MA Liqiang, WANG Liquan, ZHANG Dongsheng, et al. Application and study on feasibility of near distance coal seam group ascending mining[J]. Journal of Hunan University of Science & Technology( Natural Science Edition), 2007, 22(4):15
[4]杨胜利,刘颢颢,李杨,等.极近距离煤层合层综放技术[J].煤炭学报,2011,36(3):371376 YANG Shengli, LIU Haohao, LI Yang, et al. The technology on full mechanized caving with combinelayers in very contiguous seams[J]. Journal of China Coal Society, 2011,36(3):371376
[5]孙春东,杨本生,刘超.10m极近距离煤层联合开采矿压规律[J].煤炭学报,2011, 36(9):14231428 SUN Chundong, YANG Bensheng, LIU Chao. Strata behavior regularity of 10m very contiguous seams combined mining[J].Journal of China Coal Society, 2011, 36(9):14231428
[6]朱涛,张百胜,冯国瑞,等.极近距离煤层下层煤采场顶板结构与控制[J].煤炭学报,2010, 35(2):190-193 ZHU Tao,ZHANG Baisheng,FENG Guorui, et al. Roof structure and control in the lower seam mining field in the ultraclose multiple seams[J].Journal of China Coal Society, 2010, 35(2):190-193
[7]张东,苏刚,程晋孝.深井大采高综采工作面切眼联合支护技术[J].煤炭学报,2010,35(11):1883-1887 ZHANG Dong, SU Gang, CHENG Jin-xiao. Combined support technology of openoff cut for high cutting fully mechanized coal m ining face in deep mine[J].Journal of China Coal Society, 2010,35(11):1883-1887
[8]曹树刚,邹德均,白燕杰,等.近距离“三软”薄煤层群回采巷道围岩控制[J].采矿与安全工程学报,2011,28(4):524-529 CAO Shu-gang, ZOU De-jun, BAI Yan-jie, et al. Surrounding rock control of mining roadway in the thin coal seam group with short distance and “Three Soft”[J].Journal of Mining & Safety Engineering, 2011,28(4):524-529
[9]杨永刚,张海燕,解盘石.复杂围岩环境下大断面巷道支护系统研究与实践[J].采矿与安全工程学报,2009,26(3):354-358 YANG Yong-gang, ZHANG Hai-yan, XIE Pan-shi. Research and practice of large section roadway support system in complex surrounding rocks[J]. Journal of Mining & Safety Engineering, 2009,26(3):354-358
[10]崔铁军,马云东.火灾中非均匀温场热力耦合隧道管片受力分析[J]. 应用力学学报, 2013,30(6):1-5 CUI Tie-jun, MA Yun-dong. Internal forces analysis for tunnel segment under fire based on the coupled thermalmechanical model in nonuniform temperature field[J]. Chinese Journal of Applied Mechanics, 2013,30(6):1-5
[11]魏锦平,郜进海,陈商强.基于梁拱式组合结构的薄层状复合顶板锚固设计[J].采矿与安全工程学报,2009,26(4):499-503WEI Jin-ping, GAO Jin-hai, CHEN Shang-qiang.Anchoring design for thinlayered composite roof based on beamarch compound structure[J]. Journal of Mining & Safety Engineering, 2009,26(4):499-503
[12]唐治,潘一山,阎海鹏,等.急倾斜煤柱开采后对巷道影响的数值模拟[J].中国地质灾害与防治学报,2010,(6):6467 TANG Zhi, PAN Yi-shan, YAN Hai-peng, et al. Numerical simulation about influences of steep inclined coal pillar after mining on laneway[J]. The Chinese Journal of Geological Hazard and Control, 2010,(6):64-67
[13]王永秀,齐庆新,陈兵,雷毅.煤柱应力分布规律的数值模拟分析[J].煤炭科学技术,2004,(10):59-62 WANG Yong-xiu, QI Qing-xin, CHEN Bing,et al. Analysis on digital simulation for stress distribution la w of coal pillar[J].Coal Science and Technology, 2004,(10):59-62
[14]杨启楠.基于FLAC3D复合顶煤大断面煤巷围岩数控模拟[J].辽宁工程技术大学学报(自然科学版),2012,31(4):461-466 YANG Qi-nan.Numerical simulation of compound roof control at coal roadway with large crosssection based on FLAC3D[J].Journal of Liaoning Technical University(Natural Science), 2012,31(4):461-466

相似文献/References:

[1]陈善乐,王坤,汪华君,等.近距离煤层群下行开采切眼错距确定分析[J].中国安全生产科学技术,2015,11(12):144.[doi:10.11731/j.issn.1673-193x.2015.12.023]
 CHEN Shan-le,WANG Kun,WANG Hua-jun,et al.Analysis on determination of alternate distance for open-off cut in downward mining of close distance coal seam group[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2015,11(8):144.[doi:10.11731/j.issn.1673-193x.2015.12.023]
[2]赵云佩.近距煤层无煤柱协调开采布局研究与应用*[J].中国安全生产科学技术,2020,16(8):131.[doi:10.11731/j.issn.1673-193x.2020.08.021]
 ZHAO Yunpei.Research and application of coordinated mining layout without coal pillars in close coal seams[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2020,16(8):131.[doi:10.11731/j.issn.1673-193x.2020.08.021]

备注/Memo

备注/Memo:
贵州省基金计划项目(LKB[2012]03)
更新日期/Last Update: 2014-09-26