[1] 薛鲁宁, 樊建春, 张来斌. 海上钻井井喷事故的蝴蝶结模型[J]. 中国安全生产科学技术, 2013,9(2):7983
XUE Luning, FAN Jianchun, ZHANG Laibin. Bowtie model for offshore drilling blowout accident[J]. Journal of Safety Science and Technology. 2013, 9(2): 7983
[2] 郭恒, 陈国明. 海洋钻井平台事故致因分析与评价指标研究[J]. 中国安全生产科学技术, 2012, 8(3): 108113
GUO Heng, CHEN Guoming. The accidentcausing analysis and evaluation indexes for offshore drilling platforms[J]. Journal of Safety Science and Technology. 2012, 8(3): 108113
[3] 魏超南, 陈国明. 深水地平线钻井平台井喷事故剖析与对策探讨[J]. 钻采工艺, 2012, 35(5): 1821
WEI Chaonan, CHEN Guoming. Analysis of the blowout on deepwater horizon rig and precaution discussion [J]. Drilling & Production Technology, 2012, 35(5): 1821
[4] 邓海发, 陈国明. 基于CFD的深水钻井溢油事故定量风险评估[J]. 安全与环境学报, 2012, 12(2): 233236
DENG Haifa, CHEN Guoming. CFDbased quantitative hazard assessment of oil spills in deepwater drilling[J]. Journal of Safety Environment, 2012, 12(2): 233236
[5] 刘景凯. BP墨西哥湾漏油事件应急处置与危机管理的启示[J]. 中国安全生产科学技术, 2011, 7(1): 8588
LIU Jingkai. The enlightenment by the emergency response and crisis management of BP oil spill in Mexico gulf[J]. Journal of Safety Science and Technology. 2011, 7(1): 8588
[6] Lubchenco J, McNutt M K, Dreyfus G, et al. Science in support of the Deepwater Horizon response[J]. Proceedings of the National Academy of Sciences of the United States of America, 2012, 109(50): 2021220221
[7] Osi L K. BP's Deepwater Horizon Oil Spill: Engineering Failures, Environmental & Economic Impact[D]. New York: The Cooper Union for the Advancement of Science and Art, 2011
[8] 尹邦堂, 李相方, 任美鹏, 等. 深水井喷顶部压井成功最小泵排量计算方法[J]. 中国安全生产科学技术, 2011, 7(11): 1419
YIN Bangtang , LI Xiangfang ,REN Meipeng, et al. Calculation method for the minimum pump displacement while topkill method is successful in deep water well control[J]. Journal of Safety Science and Technology. 2011, 7(11): 1419
[9] 孟会行, 陈国明, 朱渊, 等. 深水井喷应急技术分类及研究方向探讨[J]. 石油钻探技术, 2012, 40(6): 2732
MENG Huixing, CHEN Guoming, ZHU Yuan, et al. Classification and discussion on the direction of emergency technology for deepwater blowout[J]. Petroleum Drilling Techniques, 2012, 40(6): 2732
[10] BP. Deepwater Horizon containment and response: Harnessing capabilities and lessons learned[R]. London: 2010
[11] Mathews K J. Fluid Flow and Heat Transfer in the Top Hat Oil Recovery System[C]. Houston: 2012
[12] Azaron A, Ghomi S. Lower bound for the mean project completion time in dynamic PERT networks[J]. European Journal of Operational Research, 2008, 186(1): 120127
[13] 单友成, 周满红, 赵红. 模糊型计划评审技术在海洋结构建造工期估算中的应用[J]. 天津大学学报(社会科学版), 2009, 11(2): 120122
SHAN Youcheng,ZHOU Manhong,ZHAO Hong. Application of FPERT to evaluation of building period for ocean structure[J]. Journal of Tianjin University(Social Sciences), 2009, 11(2): 120122
[14] 徐炜华, 肖刚. “海洋之殇”——深水地平线事件引发的思考[J]. 中国海洋平台, 2011, 26(6): 68
XU Weihua, XIAO Gang. Thinking of the "Deepwater Horizon" event[J]. China Offshore Platform, 2011, 26(6): 68
[15] 胡运权, 郭耀煌. 运筹学教程[M]. 北京: 清华大学出版社, 2012〖FL)〗〖HJ〗〖HT〗〖ST〗〖WT〗