|本期目录/Table of Contents|

[1]杨斌,熊万玲,杜芳芳.高校应急管理全过程能力评价指标体系构建研究[J].中国安全生产科学技术,2010,6(4):39-44.
 YANG Bin,XIONG Wan-ling,DU Fang-fang.Study on establishment about the evaluation index system of campus emergency management capacity through the overall process[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2010,6(4):39-44.
点击复制

高校应急管理全过程能力评价指标体系构建研究(/HTML)
分享到:

《中国安全生产科学技术》[ISSN:1673-193X/CN:11-5335/TB]

卷:
6
期数:
2010年4
页码:
39-44
栏目:
学术论著
出版日期:
2010-08-31

文章信息/Info

Title:
Study on establishment about the evaluation index system of campus emergency management capacity through the overall process
文章编号:
1673-193X(2010)-04-0039-06
作者:
杨斌熊万玲杜芳芳
四川大学公共管理学院,成都? 610064
Author(s):
YANG Bin XIONG Wan-ling DU Fang-fang
Sichuan University, Chengdu? 610064, China
关键词:
高校应急管理全过程能力评价指标体系
Keywords:
-
分类号:
X92
DOI:
-
文献标志码:
A
摘要:
-
Abstract:
-

参考文献/References:

-

相似文献/References:

[1]李湖生.应急管理阶段理论新模型研究[J].中国安全生产科学技术,2010,6(5):18.
 LI Hu-sheng.Research on new model of the emergency management phase theory[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2010,6(4):18.
[2]宋劲松,刘红霞,王诗剑.应急管理第一响应者制度综述*[J].中国安全生产科学技术,2011,7(2):14.
 SONG Jin song,LIU Hong xia,WANG Shi jian.A summary of first responders in emergency management[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2011,7(4):14.
[3]吴发旺.电力突发事件应急管理中的博弈[J].中国安全生产科学技术,2011,7(3):73.
 WU Fa-wang.Game on emergency management of power incident[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2011,7(4):73.
[4]邢娟娟.应急准备文化的推进与实践[J].中国安全生产科学技术,2011,7(9):115.
 XING Juan-juan.Promoting emergency preparedness culture and practice[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2011,7(4):115.
[5]王善文.国内外含硫气田应急预案编制对比分析研究[J].中国安全生产科学技术,2011,7(10):46.
 WANG Shan-wen.Comparison study on emergency planning of nature gas well involving hydrogen sulfide[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2011,7(4):46.
[6]刘铁民.应急准备任务设置与应急响应能力建设* 〖HT3SS〗——基于情景-任务-能力应急预案编制技术研究之二[J].中国安全生产科学技术,2012,8(10):5.
 LIU Tie min.Studies on setting of emergency preparedness tasks and building of emergency response capacity〖JP〗 ——Part II of emergency planning technology based on “SceneTaskAbility”[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2012,8(4):5.
[7]王汉斌,高翔.煤矿企业脆弱性评估的AHPRS组合权重法[J].中国安全生产科学技术,2012,8(3):170.
 WANG Han bing,GAO Xiang.Vulnerability assessment of coal mine enterprise with the method of ascertaining weight based on analytic hierarchy process and rough set[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2012,8(4):170.
[8]李国平.普光高含硫气田企地三级应急联动模式 研究和运用[J].中国安全生产科学技术,2012,8(5):141.
 LI Guo ping.Study and application of three levels joint enterprises and governments emergency response of puguang high sulfur gas field[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2012,8(4):141.
[9]姬浩,苏兵,吕美.高校突发事件应急管理能力成熟度模型研究[J].中国安全生产科学技术,2013,9(1):39.
 JI Hao,SU Bing,LV Mei.Research on capability maturity model of campus emergency management[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2013,9(4):39.
[10]石昊栋,丁浩,霍国辉,等.石油企业中东突发公共事件应急管理三阶段模式设计[J].中国安全生产科学技术,2012,8(6):158.
 SHI Hao dong,DING Hao,HUO Guo hui,et al.Design of threestage model for public emergency management of oil companies in middle east[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2012,8(4):158.
[11]韦庆辛.关于构建高校突发事件应急管理机制的思考[J].中国安全生产科学技术,2010,6(3):191.
 WEI Qing-xin.Reflection of constructing university emergency management mechanism[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2010,6(4):191.

备注/Memo

备注/Memo:
收稿日期:2010-06-22
作者简介:杨斌,硕士生导师,副教授。
更新日期/Last Update: