[1]刘伟.冬茅冲尾矿坝稳定性数值模拟与分析[D].衡阳:南华大学,2015.
[2]高松.尾矿库渗流特性研究[D].石家庄:石家庄铁道大学,2021.
[3]杨春和,张超,李全明,等.大型高尾矿坝灾变机制与防控方法[J].岩土力学,2021,42(1):1-17.YANG Chunhe,ZHANG Chao,LI Quanming,et al.Disaster mechanism and prevention methods of large-scale high tailings dam[J].Rock and Soil Mechanics,2021,42(1):1-17.
[4]WU T,QIN J.Experimental study of a tailings impoundment dam failure due to overtopping[J].Mine Water Environ,2018,37(2):272-280.
[5]刘胜,王媛,冯迪.尾矿库中新型复合排渗管排渗特征试验研究[J].岩土工程学报,2019,41(12):2360-2366.LIU Sheng,WANG Yuan,FENG Di.Experimental study on drainage characteristics of new composite drainage pipes in tailings pond[J].Chinese Journal of Geotechnical Engineering,2019,41(12):2360-2366.
[6]胡明鉴,郭爱国,陈守义.某上游法尾矿坝抗滑稳定性分析的几点思考[J].岩土力学,2004(5):769-773.HU Mingjian,GUO Aiguo,CHEN Shouyi.Reflections on anti-slide stability analysis of a gangue dam[J].Rock and Soil Mechanics,2004(5):769-773.
[7]王光进,唐永俊,杜超,等.尾矿库水位变化下的溃坝试验研究[J].泥沙研究,2018,43(4):67-73.WANG Guangjin,TANG Yongjun,DU Chao,et al.Experimental study on dam break of tailings pond under water levelchange[J].Journal of Sediment Research,2018,43(4):67-73.
[8]郝喆,张维正,陈殿强.尾矿库加高增容过程的渗流稳定性分析[J].有色矿冶,2018,34(2):51-54.HAO Zhe,ZHANG Weizheng,CHEN Dianqiang.Analysis of seepage stability in the process of heightening and increasing capacity of tailings pond[J].NON-FERROUS MINING AND METALLURGY,2018,34(2):51-54.
[9]孙景鹏,宋春山,韩红卫,等.尾矿库三维渗流模拟及排渗设施对渗流场影响[J].金属矿山,2022(6):184-189.SUN Jingpeng,SONG Chunshan,HAN Hongwei,et al.Three dimensional seepage simulation of tailings pond and the influence of drainage facilities on seepage field[J].METAL MINE,2022(6):184-189.
[10]曹庆贵,程卫民,辛嵩.安全系统工程[M].北京:煤炭工业出版社,2010:82-86.
[11]中华人民共和国应急管理部.尾矿库安全规程:GB 39496—2020[S].北京:中国标准出版社,2020.
[12]中华人民共和国住房和城乡建设部.尾矿设施设计规范:GB 50863—2013[S].北京:中国计划出版社,2013.
[13]杨荣,贺利民.某尾矿库浸润线偏高探析及治理[J].湖南有色金属,2020,36(2):67-70.YANG Rong,HE Limin.Analysis and treatment of high saturation line in a tailings pond[J].Hunan Nonferrous Metals,2020,36(2):67-70.
[14]王群.细粒尾矿坝浸润线分布特点对其安全影响的研究[D].北京:北方工业大学,2015.
[15]康顺祥,张爱军,张少宏,等.透镜体特征参数对均质土坝浸润线及渗透流量的影响[J].水资源与水工程学报,2021,32(5):209-214.KANG Shunxiang,ZHANG Aijun,ZHANG Shaohong,et al.Effects of lens parameters on phreatic line and seepage flow of the seepage field in homogeneous earth dams[J].Journal of Water Resources & Water Engineering,2021,32(5):209-214.
[16]廖晓东.上游式尾矿库浸润线偏高原因浅析及治理措施[J].四川有色金属,2013(2):18-21.LIAO Xiaodong.Brief analysis and treatment measures to the higher upstream seepage line of tailings dam[J].Sichuan Nonferrous Metals,2013(2):18-21.
[17]赵静.尾矿堆积坝排渗技术的研究及应用[J].河南科技,2021,40(15):114-116.ZHAO Jing.Research and application of seepage drainage technology of tailings deposit dam[J].Henan Science and Technology,2021,40(15):114-116.
[1]张栋,吴宗之,蔡嗣经.尾矿库地震液化机理及抗震评估指标体系研究[J].中国安全生产科学技术,2010,6(6):17.
ZHANG Dong,WU Zong-zhi,CAI Shi-jing.Discussion on tailings reservoir dam failure risk assessment index system under seismic conditions[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2010,6(7):17.
[2]郑锐,杨振宏,潘成林.基于熵技术的尾矿库安全模糊综合评价体系研究[J].中国安全生产科学技术,2011,7(6):107.
ZHENG Rui,YANG Zhen-hong,PAN Cheng-lin.Reaserch on Fuzzy Comprehensive Evaluation System of Tailings Based on Entropy Technology[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2011,7(7):107.
[3]蔡嗣经,张栋,吴宗之.尾矿库地震溃坝模糊风险评估方法探讨[J].中国安全生产科学技术,2011,7(7):10.
CAI Shi Jing,ZHANG Dong,WU Zong Zhi.Discussion on Tailings Reservoir Dam fuzzy risk assessment model Under Seismic Conditions[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2011,7(7):10.
[4]李全明,田文旗,王云海,等.尾矿库在线监测系统中位移数据分析方法探讨[J].中国安全生产科学技术,2011,7(8):47.
LI Quan-ming,TIAN Wen-qi,WANG Yun-hai.Study on displacement analysis methods of tailing ponds on-line monitoring system[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2011,7(7):47.
[5]胡文志,马海涛,谢振华,等.三维高密度电法在尾矿库隐患检测中的应用[J].中国安全生产科学技术,2011,7(9):64.
HU Wen-zhi,MA Hai-tao,XIE Zhen-hua,et al.Application of three dimensional high-density resistivity method in hidden danger detection of Tailings[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2011,7(7):64.
[6]许元木.浅谈尾矿坝削坡[J].中国安全生产科学技术,2011,7(11):132.
XU Yuan-mu.A superficial analysis on tailings dam cutting slope[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2011,7(7):132.
[7]梅国栋,吴宗之.尾矿库溃坝风险定量评价方法探讨[J].中国安全生产科学技术,2012,8(2):78.
MEI Guo dong,WU Zong zhi.Discussion on quantitative assessment method of dam failure risks in tailings dam[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2012,8(7):78.
[8]孙恩吉,张兴凯,李仲学,等.降雨条件下尾矿坝饱和-半饱和渗流模拟分析[J].中国安全生产科学技术,2012,8(3):5.
SUN En ji,ZHANG Xing kai,LI Zhong xue,et al.Simulation analysis on tailings dam saturated and semisaturation infiltration of under rainfall conditions[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2012,8(7):5.
[9]李钢.基于灰色系统理论的尾矿库坝体
形变位移预测方法[J].中国安全生产科学技术,2012,8(4):107.
LI Gang.Research on the displacement forecasting methods of tailings
dam deformation based on the gray system theory[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2012,8(7):107.
[10]梅国栋.尾矿库溃坝灾害脆弱性评估指标体系及方法研究[J].中国安全生产科学技术,2012,8(12):11.
MEI Guo dong.Research on the dambreak hazard vulnerability assessment index system and methods of tailings pond[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2012,8(7):11.
[11]苏军,王治宇,袁子清,等.光纤光栅(FBG)传感器在尾矿库在线监测中的应用[J].中国安全生产科学技术,2014,10(7):65.[doi:10.11731/j.issn.1673-193x.2014.07.012]
SU Jun,WANG Zhi yu,YUAN Zi qing,et al.Application of FiberBraggGrating sensor in online monitoring system of tailings pond[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2014,10(7):65.[doi:10.11731/j.issn.1673-193x.2014.07.012]
[12]程晓亮,杨鹏,吕文生,等.化学环境下的应力-渗流耦合对尾
矿库稳定性影响试验[J].中国安全生产科学技术,2018,14(2):112.[doi:10.11731/j.issn.1673-193x.2018.02.018]
CHENG Xiaoliang,YANG Peng,LYU Wensheng,et al.Experimental study on effect of stress-seepage coupling on stability of tailing pond under chemical environment[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2018,14(7):112.[doi:10.11731/j.issn.1673-193x.2018.02.018]