|本期目录/Table of Contents|

[1]于阳,孙雅珍,林志军,等.基坑开挖引起邻侧盾构隧道开裂特性研究*[J].中国安全生产科学技术,2021,17(10):99-105.[doi:10.11731/j.issn.1673-193x.2021.10.015]
 YU Yang,SUN Yazhen,LIN Zhijun,et al.Study on cracking characteristics of adjacent shield tunnel caused by foundation pit excavation[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2021,17(10):99-105.[doi:10.11731/j.issn.1673-193x.2021.10.015]
点击复制

基坑开挖引起邻侧盾构隧道开裂特性研究*
分享到:

《中国安全生产科学技术》[ISSN:1673-193X/CN:11-5335/TB]

卷:
17
期数:
2021年10期
页码:
99-105
栏目:
职业安全卫生管理与技术
出版日期:
2021-10-31

文章信息/Info

Title:
Study on cracking characteristics of adjacent shield tunnel caused by foundation pit excavation
文章编号:
1673-193X(2021)-10-0099-07
作者:
于阳孙雅珍林志军王金昌叶友林
(1.沈阳建筑大学 土木工程学院,辽宁 沈阳 110168;
2.沈阳建筑大学 交通工程学院,辽宁 沈阳 110168;
3.中国电建集团华东勘测设计研究院有限公司,浙江 杭州 310058;
4.浙江大学 交通工程研究所,浙江 杭州 310058)
Author(s):
YU Yang SUN Yazhen LIN Zhijun WANG Jinchang YE Youlin
(1.School of Civil Engineering,Shenyang Jianzhu University,Shenyang Liaoning 110168,China;
2.School of Transportation Engineering,Shenyang Jianzhu University,Shenyang Liaoning 110168,China;
3.Power China Huadong Engineering Corporation Limited,Hangzhou Zhejiang 310058,China;
4.Institute of Transportation Engineering,Zhejiang University,Hangzhou Zhejiang 310058,China)
关键词:
基坑开挖隧道工程管片衬砌数值计算裂缝开裂机制
Keywords:
foundation pit excavation tunnel engineering segment lining numerical calculation crack cracking mechanism
分类号:
X951
DOI:
10.11731/j.issn.1673-193x.2021.10.015
文献标志码:
A
摘要:
为探究基坑开挖导致邻侧既有盾构隧道出现开裂破损而带来的不利影响,采用地层-结构法与荷载-结构法相结合的计算方法,同时考虑内置钢筋对混凝土的加强作用,精细化地模拟基坑开挖影响下,非连续盾构管片结构接头处裂缝的扩展过程,揭示其开裂机制。研究结果表明:基坑开挖过程中,管片衬砌“横鸭蛋”变形模式决定了其开裂范围,即左、右拱腰附近为主开裂区;管片的裂损特征为纵向裂缝,初始裂缝由左、右拱腰外弧面逐渐向两侧接头处延展,右拱腰接头处裂缝扩展连接为沿厚度方向的环状裂缝。
Abstract:
In order to explore the adverse effect of the cracking and damage of existing shield tunnel on the adjacent side due to the excavation of foundation pit,a calculation method combining the stratum-structure method and the load-structure method was adopted,and considering the reinforcement effect of the built-in steel bars on the concrete,the propagation process of the cracks at the joints of discontinuous shield segment structure under the influence of foundation pit excavation was finely simulated,and the cracking mechanism was revealed.The results showed that during the process of foundation pit excavation,the cracking range of the segment lining was determined by the ‘transverse duck egg’ deformation mode,i.e.the primary cracking area was near the left and right haunch.The cracks of segment were characterized by the longitudinal cracks,and the initial cracks gradually extended from the outer arc surface of the left and right haunch to the joints on both sides,while the cracks at the right haunch joint extended and connected into a circular crack along the thickness direction.

参考文献/References:

[1]蒙国往,农忠建,吴波,等.地铁车站深基坑开挖变形及数值模拟分析[J].中国安全生产科学技术,2020,16(7):145-151. MENG Guowang,NONG Zhongjian,WU Bo,et al.Excavation deformation and numerical simulation analysis of deep foundation pit in subway station[J].Journal of Safety Science and Technology,2020,16(7):145-151.
[2]卜康正,郑先昌,沈翔,等.基坑放坡开挖对下方既有地铁隧道影响计算及风险预测[J].中国安全生产科学技术,2019,15(7):5-12. BU Kangzheng,ZHENG Xianchang,SHEN Xiang,et al.Calculation for effect of foundation pit sloping excavation on underlying metro tunnels and risk prediction[J].Journal of Safety Science and Technology,2019,15(7):5-12.
[3]魏纲,张鑫海,林心蓓,等.基坑开挖引起的旁侧盾构隧道横向受力变化研究[J].岩土力学,2020,41(2):635-644. WEI Gang,ZHANG Xinhai,LIN Xinbei,et al.Study for variations of transverse forces on nearby shield tunnel caused by foundation pits excavation[J].Rock and Soil Mechanics,2020,41(2):635-644.
[4]陈仁朋,王诚杰,鲁立,等.开挖对地铁盾构隧道影响及控制措施[J].工程力学,2017,34(12):1-13. CHEN Renpeng,WANG Chengjie,LU Li,et al.Influence of excavation on exist metro shield tunnel and control measures[J].Engineering Mechanics,2017,34(12):1-13.
[5]孙廉威.外界荷载作用下已建盾构隧道结构性状[D].杭州:浙江大学,2016.
[6]杨雨冰,周彪,谢雄耀.邻近基坑施工作用下盾构隧道横向变形及开裂特性研究[J].岩石力学与工程学报,2016,35(S2):4082-4093. YANG Yubing,ZHOU Biao,XIE Xiongyao,et al.Study on transverse deformation and cracking property of shield-driven tunnel induced by adjacent excavation[J].Chinese Journal of Rock Mechanics and Engineering,2016,35(S2):4082-4093.
[7]曹淞宇,王士民,刘川昆,等.裂缝位置对盾构隧道管片结构破坏形态的影响[J].东南大学学报(自然科学版),2020,50(1):120-128. CAO Songyu,WANG Shimin,LIU Chuankun,et al.Influence of crack location on failure mode of shield tunnel lining structure[J].Journal of Southeast University(Natural Science Edition),2020,50(1):120-128.
[8]WANG S M,RUAN L,SHEN X Z,et al.Investigation of the mechanical properties of double lining structure of shield tunnel with different joint surface[J].Tunnelling and Underground Space Technology,2019,90:404-419.
[9]WANG F Y,ZHOU M L,ZAHNG D M,et al.Random evolution of multiple cracks and associated mechanical behaviors of segmental tunnel linings using a multiscale modeling method[J].Tunnelling and Underground Space Technology,2019,90:220-230.
[10]王士民,于清洋,彭博,等.基于塑性损伤的盾构隧道双层衬砌三维实体非连续接触模型研究[J].岩石力学与工程学报,2016,35(2):303-311. WANG Shimin,YU Qingyang,PENG Bo,et al.Three-dimensional discontinuous contact model for shield tunnels with double-layer lining based on plastic-damage model[J].Chinese Journal of Rock Mechanics and Engineering,2016,35(2):303-311.
[11]梁东,金浩,肖军华,等.软土地区侧压损失对盾构隧道受力及变形的影响[J].工程力学,2019,36(5):148-156. LIANG Dong,JIN Hao,XIAO Junhua,et al.Influence of lateral pressure loss on the force and deformation of shield tunnel in soft soil area[J].Engineering Mechanics,2019,36(5):148-156.
[12]陈仁朋,孟凡衍,李忠超,等.邻近深基坑地铁隧道过大位移及保护措施[J].浙江大学学报(工学版),2016,50(5):856-863. CHEN Renpeng,MENG Fanyan,LI Zhongchao,et al.Considerable displacement and protective measures for metro tunnels adjacent deep excavation[J].Journal of Zhejiang University (Engineering Science),2016,50(5):856-863.
[13]邱月,封坤,何川,等.盾构隧道错缝拼装管片衬砌局部原型结构破坏试验[J].土木工程学报,2019,52(4):98-108. QIU Yue,FENG Kun,HE Chuan,et al.Local prototype failure test on staggered assembled segmental lining for shield tunnel[J].China Civil Engineering Journal,2019,52(4):98-108.
[14]YAN Q X,XU Y J,ZHANG W L,et al.Numerical analysis of the cracking and failure behaviors of segmental lining structure of an underwater shield tunnel subjected to a derailed high-speed train impact[J].Tunnelling and Underground Space Technology,2018,72:41-54.
[15]苏昂,王士民,何川,等.复合地层盾构隧道管片施工病害特征及成因分析[J].岩土工程学报,2019,41(4):683-692. SU Ang,WANG Shimin,HE Chuan,et al.Disease characteristics and causes analysis of segments of shield tunnels in composite stratum during construction[J].Chinese Journal of Geotechnical Engineering,2019,41(4):683-692.
[16]顾晓鲁,钱鸿缙,刘惠珊,等.地基与基础(第三版)[M].北京:中国建筑工业出版社,2003.
[17]中华人民共和国住房和城乡建设部.混凝土结构设计规范:GB 50010—2010[S].北京:中国建筑科学研究院,2010.

相似文献/References:

[1]安永林,蔡海滨,岳健,等.高铁对邻近矿区主井的动力安全影响分析[J].中国安全生产科学技术,2015,11(4):40.[doi:10.11731/j.issn.1673-193X.2015.04.006]
 AN Yong-lin,CAI Hai-bin,YUE Jian,et al.Analysis on influence of high-speed rail on main shaft of neighboring mine[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2015,11(10):40.[doi:10.11731/j.issn.1673-193X.2015.04.006]
[2]吴波,路明,雷领,等.基于正交试验、组合赋权-灰色关联度法研究隧道施工最优方案[J].中国安全生产科学技术,2019,15(8):124.[doi:10.11731/j.issn.1673-193x.2019.08.020]
 WU Bo,LU Ming,LEI ling,et al.Research on optimal scheme of tunnel construction based on orthogonal test and combined weightinggrey correlation method[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2019,15(10):124.[doi:10.11731/j.issn.1673-193x.2019.08.020]
[3]崔光耀,祁家所,王明胜.中义隧道片理化玄武岩段大变形控制技术研究*[J].中国安全生产科学技术,2020,16(10):115.[doi:10.11731/j.issn.1673-193x.2020.10.018]
 CUI Guangyao,QI Jiasuo,WANG Mingsheng.Study on large deformation control technology of schistositized basalt section in Zhongyi tunnel[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2020,16(10):115.[doi:10.11731/j.issn.1673-193x.2020.10.018]
[4]崔光耀,田宇航,麻建飞,等.高烈度地震区隧道软硬围岩交接段刚柔并济抗减震技术研究*[J].中国安全生产科学技术,2021,17(4):135.[doi:10.11731/j.issn.1673-193x.2021.04.022]
 CUI Guangyao,TIAN Yuhang,MA Jianfei,et al.Research on rigid-flexible combination anti-seismic technology on soft-hard surrounding rock intersection of tunnel in high intensity seismic area[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2021,17(10):135.[doi:10.11731/j.issn.1673-193x.2021.04.022]
[5]王兵.新建草莓沟2号隧道近接下穿既有隧道施工安全影响分析*[J].中国安全生产科学技术,2021,17(5):106.[doi:10.11731/j.issn.1673-193x.2021.05.016]
 WANG Bing.Analysis on construction safety influence of newly-built Caomeigou No.2 tunnel close undercrossing existing tunnel[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2021,17(10):106.[doi:10.11731/j.issn.1673-193x.2021.05.016]
[6]安栋,刘天旺,郭艳军.强震区跨断层隧道纤维混凝土衬砌抗震效果分析*[J].中国安全生产科学技术,2021,17(6):98.[doi:10.11731/j.issn.1673-193x.2021.06.016]
 AN Dong,LIU Tianwang,GUO Yanjun.Analysis on seismic effect of fiber concrete lining in cross-fault tunnel at strong earthquake area[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2021,17(10):98.[doi:10.11731/j.issn.1673-193x.2021.06.016]
[7]崔光耀,石文昊,王明胜,等.高烈度地震区跨断层隧道不同厚度减震层减震效果分析*[J].中国安全生产科学技术,2021,17(7):130.[doi:10.11731/j.issn.1673-193x.2021.07.021]
 CUI Guangyao,SHI Wenhao,WANG Mingsheng,et al.Analysis on shock absorption effect of shock-absorbing layer with different thicknesses for fault-crossing tunnels in high seismic intensity zone[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2021,17(10):130.[doi:10.11731/j.issn.1673-193x.2021.07.021]
[8]乔建刚,彭瑞,李景文,等.基于修正莫尔库伦的基坑开挖对隧道安全影响研究*[J].中国安全生产科学技术,2022,18(2):177.[doi:10.11731/j.issn.1673-193x.2022.02.027]
 QIAO Jiangang,PENG Rui,LI Jingwen,et al.Research on influence of foundation pit excavation on tunnel safety based on modified Mohr Coulomb[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2022,18(10):177.[doi:10.11731/j.issn.1673-193x.2022.02.027]
[9]曹成威,石钰锋,詹涛,等.考虑动态施工超长管棚预支护力学特性及参数影响分析*[J].中国安全生产科学技术,2022,18(6):98.[doi:10.11731/j.issn.1673-193x.2022.06.015]
 CAO Chengwei,SHI Yufeng,ZHAN Tao,et al.Analysis on mechanical characteristics and parameter influence of pre-support for ultra-long pipe shed considering dynamic construction[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2022,18(10):98.[doi:10.11731/j.issn.1673-193x.2022.06.015]
[10]项琴,朱宏伟,杜义祥,等.隧道突泥涌水情景构建及演化状态预测模型*[J].中国安全生产科学技术,2022,18(8):154.[doi:10.11731/j.issn.1673-193x.2022.08.023]
 XIANG Qin,ZHU Hongwei,DU Yixiang,et al.Scenario construction and evolution state prediction model of water and mud inrush in tunnel[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2022,18(10):154.[doi:10.11731/j.issn.1673-193x.2022.08.023]

备注/Memo

备注/Memo:
收稿日期: 2020-12-15
* 基金项目: 国家重点基础研究发展计划(973计划)项目(2015CB057801);辽宁省自然科学基金项目(2018011666-301)
作者简介: 于阳,博士研究生,主要研究方向为盾构隧道结构非线性分析。
通信作者: 孙雅珍,博士,教授,主要研究方向为结构损伤机制。
更新日期/Last Update: 2021-11-03