[1]巨玉文.黄土高填方路堤综合压实技术及沉降规律[M].北京:中国建筑工业出版社,2017.
[2]常伟涛.半填半挖路基差异沉降分析研究[D].长沙:湖南大学,2008.
[3]赵超.山区高填方路堤工后沉降变形规律与预测研究[D].武汉:中国地质大学(武汉),2018.
[4]翁效林,马豪豪,梁东平.差异沉降条件下黄土拓宽路基协调机制模型试验研究[J].岩石力学与工程学报,2013,32(S2):4002-4009.
WENG Xiaolin,MA Haohao,LIANG Dongping.Model experimental study of loess widened embankment coordination mechanism under conditions of differential settlement [J].Chinese Journal of Rock Mechanics and Engineering,2013,32(S2):4002-4009.
[5]王有昌.半填半挖路基水分运移规律及差异沉降形成机理研究[D].长沙:长沙理工大学,2009.
[6]郑治,曾忠.西部地区高填方路堤沉降病害调查与分析[J].公路交通科技,2005,22(9):107-110.
ZHENG Zhi,ZENG Zhong.Investigation andanalysis on settlement diseases of high fill embankment in western region [J].Journal of Highway and Transportation Research and Development,2005,22(9):107-110.
[7]崔靖俞,张吾渝,解邦龙,等.西宁地区不同深度原状黄土湿陷性及微观机理研究[J].岩土工程学报,2019,41(S2):249-252.
CUI Jingyu,ZHANG Wuyu,XIE Banglong,et al.Study on the collapsibility of undisturbed loess and its microscopic mechanism at different depths in Xining area [J].Chinese Journal of Geotechnical and Engineering,2019,41(S2):249-252.
[8]周志刚,郑健龙,李强.土工加筋材料处治填挖交界路基非均匀沉降设计方法研究[J].中国公路学报,2003,16(1):28-32.
ZHOU Zhigang,ZHENG Jianlong,LI Qiang.Study of the design method of using geonets to treat the unequal settlement of subgrade at the cut to fill location [J].China Journal of Highway and Transport,2003,16(1):28-32.
[9]蒋鑫,邱延峻.半填半挖式路基差异沉降对沥青路面结构影响分析[J].水文地质工程地质,2006(4):16-19,44.
JIANG Xin,QIU Yanjun.The influences of the asphalt pavement deformation due to the differential subgrade settlement [J].Hydrogelogy & Engineering Geology,2006(4):16-19,44.
[10]张鹏,龙会成,李志翔,等.黄土湿陷过程下埋地油气管道力学行为有限元模拟[J].中国安全生产科学技术,2017,13(5):48-55.
ZHANG Peng,LONG Huicheng,LI Zhixiang,et al.Finite element simulation on mechanical behavior of buried oil/gas pipeline in loess collapse process [J].Journal of Safety Science and Technology,2017,13(5):48-55.
[11]高成雷,赵文忠,凌建明,等.山区公路半填半挖路基沉降控制指标与标准研究[J].岩土力学,2014,35(1):151-158.
GAO Chenglei,ZHAO Wenzhong,LING Jianming,et al.Study of index and criterion for settlement control applicable to cut-and-fill subgrade in mountain-highway [J].Rock and Soil Mechanics,2014,35(1):151-158.
[12]夏英志.某一级公路半填半挖段路基稳定性仿真研究[J].公路工程,2019,44(3):92-96,137.
XIA Yingzhi.Simulation study on stability of semi-filled and semi-excavated subgrade of a first grade highway [J].Highway Engineering,2019,44(3):92-96,137.
[13]刘美芳,蒋鑫,陈晓丽,等.考虑分层填筑的高路堤沉降变形特性分析[J].交通运输工程与信息学报,2020,18(1):61-67,76.
LIU Meifang,JIANG Xin,CHEN Xiaoli,et al.Analysis of settlement deformation characteristics of layered buried high embankment [J].Journal of Transportation Engineering and Information,2020,18(1):61-67,76.
[14]YU H,WANG Y,ZOU C,et al.Study on subgrade settlement characteristics after widening project of highway built on weak foundation [J].Arabian Journal for Science and Engineering,2017,42(9):3723-3732.
[15]马吉倩,付宏渊,王桂尧,等.降雨条件下成层土质边坡的渗流特征[J].中南大学学报(自然科学版),2018,49(2):464-471.
MA Jiqian,FU Hongyuan,WANG Guiyao,et al.Seepage characteristics of layered soil slope under rainfall conditions [J].Journal of Central South University (Science and Technology),2018,49(2):464-471.
[1]马海涛,王云海.特大黄土滑坡事故责任认定中的岩土力学问题*[J].中国安全生产科学技术,2009,5(6):43.
MA Hai tao,WANG Yun hai.Problems of rocksoil mechanics on responsibility cognizance of great loess landslide[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2009,5(11):43.
[2]姜彤,宋陈雨,张俊然,等.广吸力范围内国道G310路基黄土水力力学特性试验研究*[J].中国安全生产科学技术,2021,17(7):117.[doi:10.11731/j.issn.1673-193x.2021.07.019]
JIANG Tong,SONG Chenyu,ZHANG Junran,et al.Experimental study on hydraulic characteristics of loess in subgrade of National Highway G310 in wide suction range[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2021,17(11):117.[doi:10.11731/j.issn.1673-193x.2021.07.019]
[3]曹卫平,张作鹏,赵敏,等.桩顶荷载及温度循环对黄土地基中能量桩承载性状影响研究*[J].中国安全生产科学技术,2024,20(8):165.[doi:10.11731/j.issn.1673-193x.2024.08.022]
CAO Weiping,ZHANG Zuopeng,ZHAO Min,et al.Study on influence of pile top load and temperature cycle on bearing behavior of energy pile in loess foundation[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2024,20(11):165.[doi:10.11731/j.issn.1673-193x.2024.08.022]