[1]魏明.节段预制拼装桥梁适用条件及若干关键技术研究[D].南京:东南大学,2016.
[2]WANG M,ZHANG Y T,TIAN W.The key technology of short-line matching method in precast segment assembling of externally prestressed concrete bridges[J].Advanced Materials Research,2015,3696:912-918.
[3]ZHANG H,WANG M,ZHANG Y T.Research on precast segment assembling bridge technology in short-line matching method[J].Applied Mechanics and Materials,2013,2156:1652-1657.
[4]KOSEKI K,BREEN J E.Exploratory study of shear strength of joints for precast segmental bridges [R].The University of Texas at Austin,1983.
[5]曾雷.短线匹配预制梁悬臂拼装线形控制研究[J].铁道建筑技术,2016(8):10-13,18.
ZENG Lei.Research on linear control of short-term matching prefabricated beam county arm assembly [J].Railway Construction Technology,2016 (8):10-13,18.
[6]俞坚扬.短线预制悬臂拼装桥梁施工监控关键技术研究[D].南昌:华东交通大学,2016.
[7]李国琪.基于层次分析法节段梁拼装施工风险评估[J].价值工程,2019,38(16):75-77.
LI Guoqi.Risk assessment of segment beam assembly construction based on analytic hierarchy process [J].Value Engineering,2019,38 (16):75-77.
[8]段中乐.浅析节段预制拼装桥梁适用条件及关键技术[C]//《建筑科技与管理》组委会.2019年4月建筑科技与管理学术交流会论文集.《建筑科技与管理》组委会:北京恒盛博雅国际文化交流中心,2019:23-24.
[9]陈前融.连续梁桥短线预制阶段施工线形控制系统研究[D].长沙:长沙理工大学,2017.
[10]张立青.节段预制拼装法建造桥梁技术综述[J].铁道标准设计,2014,58(12):63-66,75.
ZHANG Liqing.Summary of the technology of constructing bridges by segment prefabrication [J].Railway Standard Design,2014,58 (12):63-66,75.
[11]郭亚军.综合评价理论与方法[M].北京:科学出版社,2002.
[12]李志荣,朱金善,宋健,等.基于C-OWA算子和证据理论的船舶夜航光环境安全评价[J].中国安全生产科学技术,2019,15(12):182-187.
LI Zhirong,ZHU Jinshan,SONG Jian,et al.Safety evaluation of ship night navigation light environment based on C-OWA operator and evidence theory [J].Journal of Safety Science and Technology,2019,15 (12):182-187.
[13]CHEN S,YU D,WU L M.Fuzzy comprehensive evaluation of fatigue risk in high-risk jobs based on G1 method[J].China Safety Science and Technology,2014,10(4):90-95.
[14]韩艳杰,张志军,李亚俊.基于新型综合集成法的矿井通风系统安全评价[J].中国安全生产科学技术,2014,10(2):75-80.
HAN Yanjie,ZHANG Zhijun,LI Yajun.Safety evaluation of mine ventilation system based on new comprehensive integration method [J].Journal of Safety Science and Technology,2014,10(2):75-80.
[15]宁瑶瑶,李龙.基于非可加测度Shapley值赋权的钻爆法地铁隧道工程施工风险灰色评价[J].工程管理学报,2016,30(6):72-77.
NING Yaoyao,LI Long.Gray evaluation of construction risk of drilling and blasting subway tunnel engineering based on weighting of non-additive measure Shapley value [J].Journal of Engineering Management,2016,30 (6):72-77.