[1]李军, 张宏. 城镇燃气管道第三方破坏因素的模糊概率分析[J]. 天然气与石油, 2016, 34(2):109-114.
LI Jun, ZHANGHong. Fuzzy probability analysis on the third party damage factor for urban gas pipeline[J]. Natural Gas and Oil, 2016, 34(2):109-114.
[2]Li J, Zhang H, Han Y S, et al. Study on failure of third-party damage for urban gas pipeline based on fuzzy comprehensive evaluation.[J]. PLoS ONE, 2016, 11(11):e0166472.
[3]李军, 张宏, 梁海滨,等. 基于模糊综合评价的燃气管道第三方破坏失效研究[J]. 中国安全生产科学技术, 2016, 12(8):140-145.
LI Jun, ZHANG Hong, LIANG Haibin, et al. Study on failure of gas pipeline due to third party damage based on fuzzy comprehensive evaluation[J]. Journal of Safety Science and Technology, 2016, 12(8):140-145.
[4]Brooker D C. Experimental puncture loads for external interference of pipelines by excavator equipment[J]. International Journal of Pressure Vessels & Piping, 2005, 82(11):825-832.
[5]Brooker D C. Numerical modelling of pipeline puncture under excavator loading. Part I. Development and validation of a finite element material failure model for puncture simulation[J]. International Journal of Pressure Vessels & Piping, 2003, 80(10):727-735.
[6]姚安林, 徐涛龙, 李星,等. 基于试验和数值模拟确定挖掘机具作用下埋地输气管道的动载荷[J]. 振动与冲击, 2014, 33(17):39-46.
YAO AnLin, XU Taolong, LI Xing, et al. Determining dynamic load on a buried gas pipeline under mining machinery actions based on test and numerical simulation[J]. Journal of Vibration and Shock, 2014, 33(17):39-46.
[7]杨建功, 练章华, 于浩,等. 油气长输管道第三方破坏监测优化仿真研究[J]. 计算机仿真, 2016, 33(2):469-474.
YANG Jiangong,LIAN ZhangHua, YU Hao, et al. Simulation of third-party damages to long-distance oil and gas pipelines and study on damage monitoring and optimal[J]. Computer Simulation, 2016, 32(2): 469-474.
[8]Zhang J, Liang Z, Han C, et al. Buckling behaviour analysis of a buried steel pipeline in rock stratum impacted by a rockfall[J]. Engineering Failure Analysis, 2015, 58:281-294.
[9]Zhang J, Liang Z, Feng D, et al. Response of the buried steel pipeline caused by perilous rock impact: Parametric study[J]. Journal of Loss Prevention in the Process Industries, 2016, 43:385-396.
[10]Zhang L, Liang Z, Zhang J. Mechanical response of a buried pipeline to explosion loading[J]. Journal of Failure Analysis and Prevention, 2016, 16(4):1-7.
[11]Guo Y, He L, Wang D, et al. Numerical investigation of surface conduit parallel gas pipeline explosive based on the TNT equivalent weight method[J]. Journal of Loss Prevention in the Process Industries, 2016, 44:360-368.
[12]Luo X, Lu S, Shi J, et al. Numerical simulation of strength failure of buried polyethylene pipe under foundation settlement[J]. Engineering Failure Analysis, 2015, 48:144-152.
[13]Luo X, Ma J, Zheng J, et al. Finite Element Analysis of Buried Polyethylene Pipe Subjected to Seismic Landslide[J]. Journal of Pressure Vessel Technology, 2014, 136(3):031801.
[14]李明阳, 陈国华. 含表面裂纹PE管道临界失稳压力的计算与分析[J]. 塑料工业, 2009, 37(5):38-41.
LI Mingyang, CHEN Guohua. Calculation and analysis of the critical buckling pressure of PE pipes with surface crack[J]. China Plastic Industry, 2009, 37(5):38-41.
[15]张宏, 崔红升. 基于应变的管道强度设计方法的适用性[J]. 油气储运, 2012, 31(12):952-954.
ZHANG Hong, CUI Hongsheng. The applicability of strain-based pipeline strength design method[J]. Oil and Gas Storage and Transportation, 2012, 31(12): 952-954.
[16]SURESH R D, SUHDHIR K J. Guidelines for seismic design of buried pipeline, IITK-GSDMA-EQ33- V2.0 [S]. Kanpur, India: Authority Gujarat State Disaster Management, 2002.
[17]Canadian Standard Association, Oil and gas pipeline systems, CSA standard Z662-2011 [S]. Mississauga, Ontario, Canada: Canadian Standard Association, 2011.
[1]张强,杨玉锋,郑洪龙,等.第三方挖掘作用下管道可靠性评估研究[J].中国安全生产科学技术,2017,13(2):143.[doi:10.11731/j.issn.1673-193x.2017.02.025]
ZHANG Qiang,YANG Yufeng,ZHENG Honglong,et al.Study on reliability evaluation of pipeline under the effect of third-party excava-tion[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2017,13(4):143.[doi:10.11731/j.issn.1673-193x.2017.02.025]