[1]ARUNRAJ N S, MANDAL S, MAITI J. Modeling uncertainty in rink assessment:an integrated approach with fuzzy set theory and Monte Carlo simulation[J]. Accident Analysis & Prevention, 2013, 55(3): 242-255.
[2]曲毅,仲秋雁,马骁霏,等.基于情景的突发事件演变概率规则推理方法[J].系统工程学报,2014,29(4):571-578.
QU Yi, ZHONG Qiuyan, MA Xiaofei, et al.The event evolution scenario-based reasoning method via probability rules[J].Journal of Systems Engineering,2014,29(4): 571-578.
[3]孙开畅,李昆,徐小峰,等.水电工程施工安全生产与应急决策信息系统研究与应用[J].水力发电学报,2013,32(5):306-310.
SUN Kaichang, LI Kun, XU Xiaofeng, et al.Study and application of safety management andemergency decision system for hydropower project[J].Journal of Hydroelectric Engineering,2013,32(5):306-310.
[4]郑霞忠,胡斌锋,郑烜.基于水电工程的应急执行力构成要素分析[J].中国安全生产科学技术,2011,7(10):149-153.
ZHENG Xiazhong, HU Binfeng, ZHENG Xuan.Analysis on the constituent elements of emergency execution basedon hydropower project[J],Journal of Safety Science and Technology,2011,7(10):149-153.
[5]葛悦,汪彤,徐亚博.基于灰色层次分析法的突发事件应急管理能力评价[J].中国安全生产科学技术,2014,10(12):80-86.
GE Yue,WANG Tong,XU Yabo.Assessment of emergency management capability based on gray analytic hierarchy process[J]. Journal of Safety Science and Technology,2014,10(12):80-86.
[6]陈述,徐佳驹,郑霞忠,等.水电工程应急能力模糊可变评估方法研究[J].数学的实践与认识,2015,(9):103-110.
CHEN Shu, XU Jiaju, ZHENG Xiazhong, et al.Fuzzy variable assessment on emergency ability of hydropower engineering[J].Mathematics in Practice and Theory,2015,(9): 103-110.
[7]江新,徐平,郑霞忠.水电工程施工突发事件应急响应方案决策研究[J].中国安全科学学报,2016,26(4):161-167.
JIANG Xin,XU Ping,ZHENG Xiazhong.Study on decision about response program to emergenciesin hydropower project construction[J].China Safety Science Journal,2016,26(4): 161-167.
[8]李鹤,张平宇,程叶青.脆弱性的概念及其评价方法[J].地理科学进展,2008,27(2):18-25.
LI He, ZHANG Pingyu, CHENG Yeqing.Concepts and assessment methods of vulnerability[J]. Progress in Geography,2008,27(2):18-25.
[9]刘铁民.事故灾难成因再认识——脆弱性研究[J].中国安全生产科学技术,2010,6(5):5-10.
LIU Tiemin.Recognition of disaster caase-study of tlevulnerability[J].Journal of Safety Science and Technology,2010,6(5): 5-10.
[10]贾增科,邱菀华,郭章林.基于脆弱性的突发事件风险分析[J].兵工学报,2009,30(z1):145-149.
JIAZengke, QIU Wanhua, GUO Zhanglin.vulnerability-based risk analysis on emergency events[J].ActaArmamentarii, 2009, 30(s1):145-149.
[11]江新,李琦,沈力,等.基于ANP-灰
模糊的水电工程项目群风险预警研究[J].
国安全科学学报,2014,24(6):146-152.
JIANG Xin, LI Qi, SHEN Li, et al. Hydropower engineering programme risk early warning researchbased on ANP-gray fuzzy[J]. China Safety Science Journal, 2014, 24(6):146-152.
[12]江新,朱沛文.水电站大坝群安全应急管理协同度测度研究[J].中国安全生产科学技术,2015,11(10):133-140.
JIANG Xin,ZHU Peiwen.Study on synergy measurement of safety emergency managementon dam group in hydropower station[J].Journal of Safety Science and Technology,2015,11(10):133-140.
[13]史培军.三论灾害研究的理论与实践[J].自然灾害学报,2002,11(3):1-9.
SHI Peijun. Theory on disaster science and disaster dynamics [J].Journal of Natural Disasters,2002,11 (3):1-9.
[14]江新,朱沛文,沈力.基于ANP和云模型的水电工程项目群资源冲突风险评估[J].中国安全科学学报,2014,24(11):152-158.
JIANG Xin,ZHU Peiwen,SHEN Li.Risk assessment of resource conflict inhydropower engineering programmes based on both ANP and cloud model[J].China Safety Science Journal,2014,24(11):152-158.
[15]邓聚龙.灰理论基础[M].武汉:华中科技大学出版社,2002.
[1]杨文涛,朱渊岳,王志鸿.水电工程地下洞室施工作业职业危害及控制[J].中国安全生产科学技术,2011,7(9):126.
YANG Wen-tao,ZHUYuan-yue,WANG Zhi-hong.Occupational hazards analysis and control on hydropower engineering underground construction[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2011,7(11):126.
[2]郑霞忠,胡斌锋,郑烜.基于水电工程的应急执行力构成要素分析[J].中国安全生产科学技术,2011,7(10):149.
ZHENG Xia-zhong,HU Bin-feng,ZHENG Xuan.An analysis on the constituent elements of emergency execution based on the hydropower project[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2011,7(11):149.
[3]朱渊岳,杨文涛,万志鸿,等.水电站地下厂房机电安装阶段职业病危害检测及分析[J].中国安全生产科学技术,2011,7(11):160.
ZHU Yuan-yue,YANG Wen-tao,WANG Zhi-hong.Occupational hazards test and analysis on mechanical-electrical equipment installation in hydropower underground construction[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2011,7(11):160.
[4]郑霞忠,望运龙,陈述,等.水电工程高危作业风险影响因素的SEM模型[J].中国安全生产科学技术,2014,10(8):119.[doi:10.11731/j.issn.1673-193x.2014.08.021]
ZHENG Xia-zhong,WANG Yun-long,CHEN Shu,et al.SEM model of hydropower high-risk operation on affecting factors[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2014,10(11):119.[doi:10.11731/j.issn.1673-193x.2014.08.021]
[5]陈述,余迪,郑霞忠.水电工程施工作业安全管理能力集对分析[J].中国安全生产科学技术,2014,10(12):56.[doi:10.11731/j.issn.1673-193x.2014.12.010]
CHEN Shu,YU Di,ZHENG Xia-zhong.Set pair analysis on safety management ability in construction operation of hydropower project[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2014,10(11):56.[doi:10.11731/j.issn.1673-193x.2014.12.010]
[6]林鹏,王英龙,汪志林,等.基于微信的大型水电工程安全隐患排查治理系统研发与应用[J].中国安全生产科学技术,2017,13(7):137.[doi:10.11731/j.issn.1673-193x.2017.07.022]
LIN Peng,WANG Yinglong,WANG Zhilin,et al.Development and application of potential safety hazard investigation and control system for large hydropower engineering based on WeChat[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2017,13(11):137.[doi:10.11731/j.issn.1673-193x.2017.07.022]
[7]郑霞忠,朱炜,张明.基于指数变权的水电站施工安全现状可拓评价[J].中国安全生产科学技术,2018,14(10):157.[doi:10.11731/j.issn.1673-193x.2018.10.025]
ZHENG Xiazhong,ZHU Wei,ZHANG Ming.Extension assessment on current situation of construction safety for hydropower station based on exponential variable weight[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2018,14(11):157.[doi:10.11731/j.issn.1673-193x.2018.10.025]
[8]杨荣,聂本武.基于安全系统理论的水电工程智能安全管控模型设计[J].中国安全生产科学技术,2019,15(9):147.[doi:10.11731/j.issn.1673-193x.2019.09.024]
YANG Rong,NIE Benwu.Design of intelligent safety management and control model for hydropower project based on safety system theory[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2019,15(11):147.[doi:10.11731/j.issn.1673-193x.2019.09.024]