|本期目录/Table of Contents|

[1]安永林,蔡海滨,岳健,等.高铁对邻近矿区主井的动力安全影响分析[J].中国安全生产科学技术,2015,11(4):40-46.[doi:10.11731/j.issn.1673-193X.2015.04.006]
 AN Yong-lin,CAI Hai-bin,YUE Jian,et al.Analysis on influence of high-speed rail on main shaft of neighboring mine[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2015,11(4):40-46.[doi:10.11731/j.issn.1673-193X.2015.04.006]
点击复制

高铁对邻近矿区主井的动力安全影响分析
分享到:

《中国安全生产科学技术》[ISSN:1673-193X/CN:11-5335/TB]

卷:
11
期数:
2015年4期
页码:
40-46
栏目:
学术论著
出版日期:
2015-04-30

文章信息/Info

Title:
Analysis on influence of high-speed rail on main shaft of neighboring mine
作者:
安永林1蔡海滨2岳健1张彩月2
(1. 湖南科技大学 土木工程学院,湖南 湘潭 411201;2. 安徽理工大学 土木建筑学院,安徽 淮南 232001)
Author(s):
AN Yong-lin 1 CAI Hai-bin 2 YUE Jian1 ZHANG Cai-yue2
(1. School of Civil Engineering, Hunan University of Science and Technology, Xiangtan Hunan 411201, China; 2. School of Civil Engineering and Architecture, Anhui University of Science & Technology, Huainan Anhui 232001, China)
关键词:
隧道工程列车振动竖井竖井回填动力影响
Keywords:
tunnel engineering train vibrating vertical shaft backfilling dynamic influence
分类号:
X936
DOI:
10.11731/j.issn.1673-193X.2015.04.006
文献标志码:
A
摘要:
为了获得高铁对邻近矿区主井的动力影响,并为回填提供依据,根据山体地形及合福高铁与邻近矿区主井的情况,建立了有无回填的两种工况模型,其中阻尼为Rayleigh模式,边界采用粘滞人工边界,列车看作移动荷载,用激振力函数来模拟。进而分析高铁荷载的频谱特性;对比竖井在有无回填下的自振频率和振型特性,研究竖井衬砌在有无回填下的位移、应力响应。结果表明:竖井回填的自振频率较竖井不回填下的大,两者前3阶振型是一样的,而在第4、5、6阶的振型不一样;竖井回填对降低衬砌的水平位移、水平应力和剪应力效果最明显;竖井衬砌受列车动载影响较大是竖井井口下方180m以内的范围。鉴于竖井下方深处存在围岩较好的约束作用,所以建议竖井回填可以不全部回填,只回填上部180m范围。
Abstract:
According to the mountain shape and the conditions of vertical shaft adjacent to the He-fu Passenger line, two simulation models with and without backfilling were built to study the dynamic influence of high-speed rail on the adjacent vertical shaft. The train was considered as a moving load. Rayleigh damp and sticky artificial boundaries were adopted. The spectral characteristics of high-speed rail loading were analyzed by simulation of excitation function. The natural vibration frequency and vibration mode characteristics of the vertical shaft with and without backfilling were compared, and the response of displacement and stress of the vertical shaft lining were also studied. The results showed that the natural vibration frequency of the shaft with backfilling is higher than that without backfilling. The first, second and third mode shapes are the same, but the fourth, fifth and sixth mode are different. The reduction of horizontal displacement, horizontal stress and shear stress are the most obvious with backfilling. The influence of the railway dynamic load on the shaft lining is larger in the range from the mouth to the 180 m depth below the surface. In view of the better restriction effect of the deep surrounding rock on the shaft, it was suggested that the vertical shaft can be backfilled not all, but just the upper 180m range of the shaft.

参考文献/References:

[1]赵庆贤, 葛秀坤, 邵辉. 列车大提速后周围流场变化诱发的事故隐患分析[J]. 中国安全生产科学技术, 2011, 7(12): 67-73 ZHAO Qing-xian,GE Xiu-kun,SHAO Hui. Analysis on security hidden troubles induced by variability of flow field due to raising train speed greatly[J].Journal of Safety Science and Technology, 2011, 7(12): 67-73
[2]何理, 钟茂华, 史聪灵, 等. 城市轨道交通安全评价体系研究[J].中国安全生产科学技术, 2009, 5(6) :181-132 HE Li, ZHONG Mao-hua, SHI Cong- ling, et al. Study on safety evaluation system of urban rail transit [J].Journal of Safety Science and Technology, 2009, 5(6) :181-132
[3]黄娟. 基于损伤理论的高速铁路隧道结构振动响应分析及疲劳寿命研究[D]. 湖南:中南大学, 2010
[4]丁祖德, 彭立敏, 雷明锋, 等. 高速铁路隧道列车振动响应影响因素分析[J]. 铁道科学与工程学报, 2011, 8(4): 1-6 DING Zu-de,PENG Li-min,LEI Ming-feng,et al. Analysis of influence factors on dynamic response of high-speed railway tunnel under vibration load[J]. Journal of Railway Science and Engineering, 2011, 8(4): 1-6
[5]梁波,蔡英. 不平顺条件下高速铁路路基的动力分析[J]. 铁道学报,1999,21(2):84-88 Liang Bo,Cai Ying. Dynamic analysis of subgrade of high speed railways in geometric irregular condition[J].Journal of the China Railway Society,1999,21(2):84-88
[6]边学成, 蒋红光,申文明, 等. 基于模型试验的高铁路基动力累积变形研究[J]. 土木工程学报, 2011,44(6):112-119 BIAN Xue-cheng,JIANG Hong-guang,SHEN Wen-ming,et al. Test and analysis for vibration influence between Hu-Ning high-speed railway and adjacent existing line[J]. China Civil Engineering Journal, 2011,44(6):112-119
[7]Pham-Ngoc Thach, Han-Long Liu, Gang-Qiang Kong. Vibration analysis of pile-supported embankments under high-speed train passage[J]. Soil Dynamics and Earthquake Engineering, 2013(55), 92-99
[8]A. El Kacimi, P.K. Woodward, O. Laghrouche, G. Medero. Time domain 3D finite element modelling of train-induced vibration at high speed[J]. Computers & Structures, 2013(118), 66-73
[9]Shen-Haw Ju, Hung-Ta Lin. Experimentally investigating finite element accuracy for ground vibrations induced by high-speed trains[J]. Engineering Structures, 2008, 30(3), Pages 733-746
[10]陈松洁. 软弱地层中水下高速铁路盾构隧道列车振动响应分析[D]. 湖南:中南大学, 2010

相似文献/References:

[1]吴波,路明,雷领,等.基于正交试验、组合赋权-灰色关联度法研究隧道施工最优方案[J].中国安全生产科学技术,2019,15(8):124.[doi:10.11731/j.issn.1673-193x.2019.08.020]
 WU Bo,LU Ming,LEI ling,et al.Research on optimal scheme of tunnel construction based on orthogonal test and combined weightinggrey correlation method[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2019,15(4):124.[doi:10.11731/j.issn.1673-193x.2019.08.020]
[2]崔光耀,祁家所,王明胜.中义隧道片理化玄武岩段大变形控制技术研究*[J].中国安全生产科学技术,2020,16(10):115.[doi:10.11731/j.issn.1673-193x.2020.10.018]
 CUI Guangyao,QI Jiasuo,WANG Mingsheng.Study on large deformation control technology of schistositized basalt section in Zhongyi tunnel[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2020,16(4):115.[doi:10.11731/j.issn.1673-193x.2020.10.018]
[3]崔光耀,田宇航,麻建飞,等.高烈度地震区隧道软硬围岩交接段刚柔并济抗减震技术研究*[J].中国安全生产科学技术,2021,17(4):135.[doi:10.11731/j.issn.1673-193x.2021.04.022]
 CUI Guangyao,TIAN Yuhang,MA Jianfei,et al.Research on rigid-flexible combination anti-seismic technology on soft-hard surrounding rock intersection of tunnel in high intensity seismic area[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2021,17(4):135.[doi:10.11731/j.issn.1673-193x.2021.04.022]
[4]王兵.新建草莓沟2号隧道近接下穿既有隧道施工安全影响分析*[J].中国安全生产科学技术,2021,17(5):106.[doi:10.11731/j.issn.1673-193x.2021.05.016]
 WANG Bing.Analysis on construction safety influence of newly-built Caomeigou No.2 tunnel close undercrossing existing tunnel[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2021,17(4):106.[doi:10.11731/j.issn.1673-193x.2021.05.016]
[5]安栋,刘天旺,郭艳军.强震区跨断层隧道纤维混凝土衬砌抗震效果分析*[J].中国安全生产科学技术,2021,17(6):98.[doi:10.11731/j.issn.1673-193x.2021.06.016]
 AN Dong,LIU Tianwang,GUO Yanjun.Analysis on seismic effect of fiber concrete lining in cross-fault tunnel at strong earthquake area[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2021,17(4):98.[doi:10.11731/j.issn.1673-193x.2021.06.016]
[6]崔光耀,石文昊,王明胜,等.高烈度地震区跨断层隧道不同厚度减震层减震效果分析*[J].中国安全生产科学技术,2021,17(7):130.[doi:10.11731/j.issn.1673-193x.2021.07.021]
 CUI Guangyao,SHI Wenhao,WANG Mingsheng,et al.Analysis on shock absorption effect of shock-absorbing layer with different thicknesses for fault-crossing tunnels in high seismic intensity zone[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2021,17(4):130.[doi:10.11731/j.issn.1673-193x.2021.07.021]
[7]于阳,孙雅珍,林志军,等.基坑开挖引起邻侧盾构隧道开裂特性研究*[J].中国安全生产科学技术,2021,17(10):99.[doi:10.11731/j.issn.1673-193x.2021.10.015]
 YU Yang,SUN Yazhen,LIN Zhijun,et al.Study on cracking characteristics of adjacent shield tunnel caused by foundation pit excavation[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2021,17(4):99.[doi:10.11731/j.issn.1673-193x.2021.10.015]
[8]曹成威,石钰锋,詹涛,等.考虑动态施工超长管棚预支护力学特性及参数影响分析*[J].中国安全生产科学技术,2022,18(6):98.[doi:10.11731/j.issn.1673-193x.2022.06.015]
 CAO Chengwei,SHI Yufeng,ZHAN Tao,et al.Analysis on mechanical characteristics and parameter influence of pre-support for ultra-long pipe shed considering dynamic construction[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2022,18(4):98.[doi:10.11731/j.issn.1673-193x.2022.06.015]
[9]项琴,朱宏伟,杜义祥,等.隧道突泥涌水情景构建及演化状态预测模型*[J].中国安全生产科学技术,2022,18(8):154.[doi:10.11731/j.issn.1673-193x.2022.08.023]
 XIANG Qin,ZHU Hongwei,DU Yixiang,et al.Scenario construction and evolution state prediction model of water and mud inrush in tunnel[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2022,18(4):154.[doi:10.11731/j.issn.1673-193x.2022.08.023]
[10]曾晓辉,张学民,戴斌,等.考虑自由面数量和抵抗线影响的隧道爆破振速预测*[J].中国安全生产科学技术,2023,19(6):83.[doi:10.11731/j.issn.1673-193x.2023.06.012]
 ZENG Xiaohui,ZHANG Xuemin,DAI Bin,et al.Prediction of tunnel blasting vibration velocity considering influence of number of free surfaces and resistance line[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2023,19(4):83.[doi:10.11731/j.issn.1673-193x.2023.06.012]

备注/Memo

备注/Memo:
湖南省自然科学基金资助项目(14JJ4046,10JJ3006);国家自然科学基金资助项目(51408216,41272324,41302226,51308209)
更新日期/Last Update: 2015-04-30