[1] 杨寿海,陈义学,王伟金,等. 多目标辐射屏蔽优化设计方法[J]. 原子能科学技术,2012,46(1):79-83
YANG Shou-hai, CHEN Yi-xue, WANG Wei-jin, et al. Multi-objective optimization design method of radiation shielding [J]. Atomic Energy Science and Technology, 2012,46(1):79-83
[2] 贾小波,石秀安. 屏蔽设计组合优化研究[J]. 核科学与工程,2010,30(4):338-343
JIA Xiao-bo, SHI Xiu-an. Combinatorial optimization study on shielding design [J]. Chinese Journal of Nuclear Science and Engineering , 2010,30(4):338-343
[3] 隋鹏程,陈宝智,随旭. 安全原理[M]. 北京:化学工业出版社,2005
[4] 何仲秋. 钻探工程施工中危险源辨识、风险评价及其控制[J]. 中国安全生产科学技术,2010,6(6):178-181
HE Zhong-qiu. Identification, evaluation and control of hazard source in drilling engineering construction [J]. Journal of Safety Science and Technology, 2010,6(6):178-181
[5] M. Rausand. Preliminary Hazard Analysis [N]. 2004
[6] 王厚军,李治灵,张玉明. 浅析低瓦斯煤矿瓦斯防治安全评价[J]. 中国安全生产科学技术,2009,5(5):130-133
WANG Hou-jun, LI Zhi-ling, ZHANG Yu-ming. Analysis of safety assessment in the gas control of low-gas coal mine [J]. Journal of Safety Science and Technology, 2009,5(5):130-133
[7] GB 18871-2002 电离辐射防护与辐射源安全基本标准[S].2002
[8] Radiation protection and radioactive waste management in the design and operation of research reactors[S]. IAEA Safety Standards, Safety Guide: No. NS-G-46
[9] 周星火. 铀矿通风与辐射安全[M]. 哈尔滨:哈尔滨工程大学出版社,2009
[10] 牛天勇. 基于PHA-LEC法的建筑工程项目安全评价问题研究[J]. 中国安全生产科学技术,2012,8(7):94-98
NIU Tian-yong. Study on construction project safety evaluation based on PHA-LEC method [J]. Journal of Safety Science and Technology,2012,8(7):94-98
[11] 杨达才,国强,易建华. 职业健康监督管理指南[M]. 西安:西安交通大学出版社,2012
[12] 石岩,李永刚. 液压挖掘机发动机噪声分析与降噪设计[J]. 工程机械,2010,41(1):38-41
SHI Yan, LI Yong-gang. Noise analysis of a hydraulic excavator engine and its noise reducyion design [J]. Construction Machinery and Equipment, 2010,41(1):38-41