[1] 王爽英,吴超,左红艳,等.中小型煤矿生产安全模糊层次分析评价模型及其应用[J].中南大学学报(自然科学 版),2010,41(5):19181922
WANG Shuangying,WU Chao,ZUO Hongyan,et al.Fuzzy analytic hierarchy process assessment model of safety production for small and medium coal mines and its application[J].Journal of Central South University(Natural Science Edition),2010,41(5):19181922
[2] 田荣.瓦斯隧道施工的关键要素及其对策[J].铁道建筑技术,2002,(6):4143,55
TIAN Rong.Key elements for gas tunnel construction[J].Railway Construction Technology,2002,(6): 4143, 55
[3] 姜德义,刘春,张广洋,等.公路隧道全断面揭煤防突技术[J].岩土力学,2005,26(6):906909
JIANG Deyi,LIU Chun,ZHANG Guangyang,et al.Technologies of whole cutting through coal seam and preventing collapse in highway tunnels[J].Rock and Soil Mechanics,2005,26(6):906909
[4] 中华人民共和国铁道部.铁路瓦斯隧道技术规范[S].北京:中国铁道出版社,2003
[5] 邓加亮.公路瓦斯隧道施工风险分析[D].长沙理工大学,2010
[6 ] 安永林,黄戡,彭立敏,等. 隧道施工风险人机环境系统综合评估[J]. 中南大学学报(自然科学版),2012,43(1): 301307
AN Yonglin, HUANG Kan, PENG LImin,et al. Risk assessment on manmachineenvironment system of tunnel construction[J].Journal of Central South University(Natural Science Edition),2012, 43(1): 301307
[7] 吕跃进,张维.指数标度在AHP标度系统中的重要作用[J].系统工程学报,2003,18(5):452456
LU Yuejin,WANG Wei.Kernel function of index scale in AHP scale system[J].
Journal of Systems Engineering, 2003,18(5):452456
[8] 覃菊莹.灰色层次分析法—GAHP[D].广西大学,2002
TAN Juying.Gray hiera rchy analysisGAHP[D].Guang Xi University,2002
[9] 刘奇志.基于Markov链的网络决策分析方法[M].合肥:中国科学技术大学出版社,2011
[10] Harun Resit Yazgan,Semra Boran,Kerim Goztepe et al.Selection of dispatching rules in FMS: ANP model based on BOCR with choquet integral[J].The International Journal of Advanced Manufacturing Technology, 2010,49(5/8):785801
〖FL)〗〖HJ〗〖HT〗〖ST〗〖WT〗〖LM〗