[1]汪张棠, 赵建亭. 我国自升式钻井平台的发展与前景[J]. 中国海洋平台, 2008, 23(4):813
WANG Zhangtang, ZHAO Jianting. The development and foreground of the selfelevation drilling platform in our country[J]. China Offshore Platform , 2008, 23(4):813
[2]李红涛, 汪震宇. 拖航状态下自升式钻井平台桩腿结构强度分析[J]. 中国海洋平台, 2012, 27(4):1014
LI Hongtao, WANG Zhenyu. Research on leg structure analysis for selfelevating drilling units under transit condition[J]. China Offshore Platform, 2012, 27(4):1014
[3]Ophir Rozenfeld. Construction Job Safety Analysis[J]. Safety Science, 2010, (48):491498
[4]刘杰. 工作安全分析JSA模式在施工现场实践研究[J]. 中国安全生产科学技术, 2011, 7(9):190194
LIU Jie. Practicable research on job safety analysis format in construction project area[J]. Journal of Safety Science and Technology, 2011, 7(9):190194
[5]都书海. 工作安全分析在管理实践中的应用[J]. 中国安全生产科学技术, 2011, 7(7):204208
DOU Shuhai. Theory and application of JSA management in practice[J]. Journal of Safety Science and Technology, 2011, 7 (7):204208
[6]李凯, 张贤波. 工作安全分析法在游梁抽油机安装中的应用[J]. 职业安全, 2012,(1):98100
LI Kai, ZHANG Xianbo. The application of Job safety analysis in the installation of beam pumping unit[J]. Occupational Safety , 2012,(1):98100
[7]朱启超, 匡兴华, 沈永平. 风险矩阵方法与应用述评[J]. 中国工程科学, 2003, 5(1):8994
ZHU Qichao, KUANG Xinghua, SHEN Yongping. Risk matrix method and application of editorials[J]. Engineering Science, 2003, 5(1):8994
[8]Paul R, GarveyPR, Lansdowne ZF. Risk matrix: an approach for identifying, assessing, and ranking program risks [J]. Air Force Journal of Logistics, 1998, 25:1619
[9]Lansdowne Z F. Risk matrix: an approach for prioritizing risks and tracking risk mitigation progress [A]. Proceedings of the 30th Annual Project Management Institute 1999 Seminars & Symposium [C]. Philadelphia, USA, 1999
[10]James E. Roughton. Understanding Job Hazard Analysis[J]. Developing an Effective Safety Culture, 2002, Pages 294309
[11]罗多. 基于风险矩阵的PHA在矿山排土场安全评价中的应用[J]. 矿山机械, 2010, 38(4):3033
LUO Duo. Application of PHA based on risk matrix to the mine dump safety assessment[J]. Mining & Processing Equipment, 2010, 38(4):3033
[12]李凯宝. 近海石油自升式钻井平台拖航作业操作浅析[J]. 天津航海, 2009,(2):910
LI Kaibao. The analysis of offshore oil selfelevating drilling platform towing operations[J]. Tianjin Navigation, 2009,(2):910
〖FL)〖HJ〖HT〖ST〖WT
[1]张艳辉,陈晓春.改进的HAZOP风险评价方法[J].中国安全生产科学技术,2011,7(7):174.
ZHANG Yan-hui,CHEN Xiao-chun.Improved HAZOP Risk Assessment Method[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2011,7(10):174.
[2]刘杰.工作安全分析(JSA)模式在施工现场实践研究[J].中国安全生产科学技术,2011,7(9):190.
LIU Jie.The Practicable Research on Job Safety Analysis Format in Construction Project Area[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2011,7(10):190.
[3]曹涛,张华兵,周利剑,等.HAZOP在油气管道站场风险分析中的应用实践[J].中国安全生产科学技术,2011,7(10):129.
CAO Tao,ZHANG Hua-bing,ZHOU Li-jian,et al.Application of HAZOP study in risk analysis of pipeline station[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2011,7(10):129.
[4]白永忠,蒋军成.HAZOP与风险矩阵组合技术应用研究[J].中国安全生产科学技术,2012,8(8):121.
BAI Yong zhong,JIANG Jun cheng.Study on the application of combination technique by HAZOP and risk matrix[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2012,8(10):121.
[5]郑登锋,蒋金生,王明勇.基于风险矩阵和LOPA的风险评价系统在油气管道
的应用研究[J].中国安全生产科学技术,2012,8(10):76.
ZHENG Deng feng,JIANG Jin sheng,WANG Ming yong.Study on application of risk evaluation system based on risk matrix and LOPA
in oil and gas pipeline system[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2012,8(10):76.
[6]王文和,易俊,沈士明.基于风险的城市埋地燃气管道安全评价模型及应用[J].中国安全生产科学技术,2010,6(3):163.
WANG Wen-he,YI Jun,SHEN Shi-ming.Safety evaluation model and application for the urban buried gas pipeline based on risk[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2010,6(10):163.
[7]黄会伟,葛晓强,袁印实,等.HAZOP分析在酸性水汽提装置上的应用与研究[J].中国安全生产科学技术,2013,9(11):147.[doi:10.11731/j.issn.1673-193x.2013.11.025]
HUANG Hui wei,GE Xiao qiang,YUAN Yin shi,et al.Application and research of HAZOP in sour water stripping unit[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2013,9(10):147.[doi:10.11731/j.issn.1673-193x.2013.11.025]
[8]孙思衡,谢婷,谢志利,等.基于模糊综合评估理论的磁铁类玩具风险评估方法研究[J].中国安全生产科学技术,2016,12(9):152.[doi:10.11731/j.issn.1673-193x.2016.09.027]
SUN Siheng,XIE Ting,XIE Zhili,et al.Research on risk assessment method of magnet toys based on fuzzy comprehen-sive evaluation theory[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2016,12(10):152.[doi:10.11731/j.issn.1673-193x.2016.09.027]
[9]付明福,张明星,朱晓曼,等.油气长输管道作业分级定量风险评价方法研究及应用[J].中国安全生产科学技术,2019,15(7):137.[doi:10.11731/j.issn.1673-193x.2019.07.022]
FU Mingfu,ZHANG Mingxing,ZHU Xiaoman,et al.Research and application of quantitative risk assessment method for operation classification of oil and gas longdistance pipeline[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2019,15(10):137.[doi:10.11731/j.issn.1673-193x.2019.07.022]
[10]李玉峰,刘袁春,胡大山,等.基于风险矩阵的水电站项目风险分级评估方法研究——以乌东德水电站为例[J].中国安全生产科学技术,2020,16(1):130.[doi:10.11731/j.issn.1673-193x.2020.01.021]
LI Yufeng,LIU Yuanchun,HU Dashan,et al.Study on risk classification assessment method of hydropower station project based on risk matrixTaking Wudongde hydropower station as example[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2020,16(10):130.[doi:10.11731/j.issn.1673-193x.2020.01.021]