|本期目录/Table of Contents|

[1]宫博,许开立,李德顺.基于可拓层次分析法的铁矿危险性评价研究[J].中国安全生产科学技术,2012,8(7):83.
 GONG Bo,XU Kai li,LI De shun.Risk assessment of iron mine based on extension AHP[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2012,8(7):83.
点击复制

基于可拓层次分析法的铁矿危险性评价研究
分享到:

《中国安全生产科学技术》[ISSN:1673-193X/CN:11-5335/TB]

卷:
8
期数:
2012年7期
页码:
83
栏目:
出版日期:
2012-07-31

文章信息/Info

Title:
Risk assessment of iron mine based on extension AHP
作者:
宫博12许开立2李德顺3
(1沈阳化工大学 化学工程学院安全工程教研室,沈阳 110142) (2东北大学 资源与土木工程学院安全工程研究所,沈阳110004) (3沈阳理工大学 环境与化学工程学院安全工程教研室,沈阳 110168)
Author(s):
GONG Bo12XU Kaili2LI Deshun3
(1School of Chemical Engineering,Shenyang University of Chemical Technology,Shenyang 110142, China) ( 2 School of Resources & Civil Engineering,Northeastern University,Shenyang 110004, China) (3 School of Environmental & Chemical Engineering, Shenyan
关键词:
可拓学层次分析法物元模型铁矿危险性
Keywords:
extenicsanalytic hierarchy processmatter element modeliron minehazard
分类号:
X932
DOI:
-
文献标志码:
A
摘要:
我国铁矿伤亡事故后果比较严重,重特大事故时有发生。基于可拓层次分析法(EAHP),结合可拓工程方法,在物元模型理论的基础上建立了铁矿危险性评价的物元模型,聘请5位专家对铁矿危险性的评价指标体系的10项指标进行评价,利用层次分析法确定各评价指标的权重,并对大红山铁矿的危险性进行评价,得出危险性等级为危险性较小、安全性较好,也说明了该铁矿需要进一步采取安全措施,加强安全管理,提高其安全程度,从而避免事故的发生,该方法为铁矿危险性评价提供了一条新的方法和手段。
Abstract:
Iron mine accident consequence is very serious in our country, serious accidents have occurred from time to time. For decisionmakers, it is often the case that the assessment of iron mine involves unexpected factors of different nature, which makes the assessment a multiindex complicated one. The assessment method has now turned to be a key problem to the sustainable control of iron mine. By applying matterelement theory,extension engineering method and analytic hierarchy process, the matter element model on the risk assessment of iron mine was established in this paper. The index system of iron mine was evaluated by five specialists, the weight of each evaluation index was calculated by the analytic hierarchy process. To test the effectiveness of the method, Da hong shan iron mine was selected as a case study, which indicated that the hazard of Da hong shan iron mine was less, the safety performance of Da hong shan iron mine was better, also indicated that the iron mine need to take further measures or strengthen safety management to improve the safety degree, thus to avoid accident. The results showed that the model could provide a new way and means for risk assessment of iron mine.

参考文献/References:

-

相似文献/References:

[1]段礼祥,张来斌,钱永梅.AHP—模糊综合评价法在离心泵安全评价中的应用[J].中国安全生产科学技术,2011,7(2):127.
 DUAN Li xiang,ZHANG Lai bin,QIAN Yong mei.Application of fuzzy comprehensive evaluation in safety assessme of centrifuge pumpnt[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2011,7(7):127.
[2]施式亮,刘勇,李润求,等.基于AHPFuzzy的高处坠落危险性评价研究[J].中国安全生产科学技术,2011,7(2):132.
 SHI Shi liang,LIU Yong,LI Run qiu,et al.Research and application on risk assessment of high falling based on AHPFuzzy[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2011,7(7):132.
[3]王秀香,施红勋,牟善军,等.基于层次分析法的企业HSE管理绩效评估[J].中国安全生产科学技术,2011,7(3):98.
 WANG Xiu-xiang,SHI Hong-xun,MU Shan-jun,et al.Study on performance evaluation of enterprise HSE management based on AHP[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2011,7(7):98.
[4]郭金玉,黄轶,廖海江,等.多层次模糊综合评估汽车制造企业职业危害风险[J].中国安全生产科学技术,2011,7(5):81.
 GUO Jin-yu,HUANG Yi,LIAO Hai-jiang,et al.Comprehensive evaluation on the occupational hazard risk in automobile industry based on multi-stage fuzzy-AHP comprehensive assessment[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2011,7(7):81.
[5]何沙,吉安民,陈东升.模糊综合评价在钻井队安全管理评价中的应用[J].中国安全生产科学技术,2011,7(6):156.
 HE Sha,JI An-min,CHEN Dong-sheng.Application of fuzzy comprehensive evaluation in security management assessment Oil-drilling group[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2011,7(7):156.
[6]赵秀雯,柴建设.城市埋地天然气管道系统脆弱性评估指标研究[J].中国安全生产科学技术,2011,7(7):92.
 ZHAO- XiuwenCHAI- Jianshe,Prof..The indicators of vulnerability assessment about city buried gas pipeline system[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2011,7(7):92.
[7]程爱宝,古德生,刘洪强.基于AHP与粗糙集理论的采空区稳定性影响因素权重分析[J].中国安全生产科学技术,2011,7(9):50.
 CHENG Ai-bao,GU De-sheng,LIU Hong-qiang.Weights analysis of factors affecting the stability of Mined-out areas based on analytic hierarchy process and rough sets theory[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2011,7(7):50.
[8]杨晓强,周长春,颜影.基于层次分析和模糊评价的民航客机雷击风险管理[J].中国安全生产科学技术,2011,7(10):60.
 YANG Xiao-qiang,ZHOU Chang-chun,YAN Ying.Risk management of aircraft thunderstroke? based AHP and fuzzy evaluation[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2011,7(7):60.
[9]张村峰,卞奇侃,蒋军成.基于“事故树—层次分析法”的高校学生宿舍火灾风险分析[J].中国安全生产科学技术,2011,7(10):100.
 ZHANG Cun-feng,BIAN Qi-kan,JIANG Jun-cheng.Fire risk analysis on university dormitory based on accident tree analysis and analytic hierarchy process[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2011,7(7):100.
[10]葛秀坤,邵辉,赵庆贤,等.大型超市安全管理的定量评价研究[J].中国安全生产科学技术,2011,7(10):119.
 GE Xiu-kun,SHAO Hui,ZHAO Qing-xian,et al.Research on quantitative assessment of safety management in large supermarket[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2011,7(7):119.

备注/Memo

备注/Memo:
-
更新日期/Last Update: 2012-08-06