[1]Zhou Hougui ,HaoYongmei, Dai Xihui. Study on construction characteristics and early warning management of hydropower engineering [J].Safety management, 2007,9(7):2[2]Yang Fang,Chu Shengli. A study on difficulties and countermeasures of Enterprise emergency preplan programming[J]. Journal of Safety Science and Technology, 2010,7(1):129[3]Xie Yinjun,Zhu Chaoyang,Zhou Gang,Wang Lijin.Research on the emergency plan system[J].Journal of Safety Science and Technology, 2010,6(3):214[4]Rao weifu, Liang Ning. Study on executive force of emergency management [J].Journal of railway engineering, 2007(05):110~112.[5]MoYongbo.The government execution: a new research topic in the current public administration [J].Journal of Sun Yat-sen University, 2005,45(1):68~69.[6]Paul Thomas, David, bowen. Execution [M].Beijing: Mechanical industry press, 2003,19[7]Huang Wei.Perfect emergency mechanism ,enhance the government’s emergency execution [J].Journal of heilongjiang foreign trade, 2007 (05),74[8]Shu Donghua.The research on Enhancing Government’s Emergency Executive Ability [D]. Hunan: Hunan University 04, 2008,7-8[9]Qian Gangyi,SheLian,Ji Fengwei. A study on the government’s emergency execution____a conceptual analysis framework[J].Management world,2010 (07),169[10]Wu Dongping,Chen Wanzhou. Emergency management situation of public emergencies[J].Journal of Safety Science and Technology, 2009,5(5):173~174[11]Yin Honglian, Xu Guangyu, Zong Chuanhe. A study on mechanism of Large project emergency[J].Journal of shandong water conservancy vocational college ,2008 (6),6[12]ZhaoHuaLi. A study on enterprises’ executive culture[D].Sichuan:Sichuan University,2005
[1]江田汉,邓云峰,李湖生,等.基于秩和比法的突发事件固有风险水平评估[J].中国安全生产科学技术,2010,6(5):34.
JIANG Tian-han,DENG Yun-feng,LI Hu-sheng,et al.Inherent risk assessment of emergency incidents based on the rank sum ratio method in China[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2010,6(10):34.
[2]吴发旺.电力突发事件应急管理中的博弈[J].中国安全生产科学技术,2011,7(3):73.
WU Fa-wang.Game on emergency management of power incident[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2011,7(10):73.
[3]江田汉,邓云峰,李湖生,等.基于风险的突发事件应急准备能力评估方法[J].中国安全生产科学技术,2011,7(7):35.
JIANG Tianhan DENG Yunfeng LI Husheng LIU Tiemin JIANG Chuansheng WANG Jianguang WANG Jingjing.Risk-based assessment model for emergency preparedness capability of emergency incidents in China[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2011,7(10):35.
[4]刘铁民.突发事件应急预案体系概念设计研究[J].中国安全生产科学技术,2011,7(8):5.
LIU Tie-min.Design of the emergency plan system’s concept[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2011,7(10):5.
[5]杨力.突发事件应急意识和能力建设探讨[J].中国安全生产科学技术,2011,7(8):154.
YANG Li.Study on ascension of emergency consciousness and ability construction[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2011,7(10):154.
[6]杨文涛,朱渊岳,王志鸿.水电工程地下洞室施工作业职业危害及控制[J].中国安全生产科学技术,2011,7(9):126.
YANG Wen-tao,ZHUYuan-yue,WANG Zhi-hong.Occupational hazards analysis and control on hydropower engineering underground construction[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2011,7(10):126.
[7]朱渊岳,杨文涛,万志鸿,等.水电站地下厂房机电安装阶段职业病危害检测及分析[J].中国安全生产科学技术,2011,7(11):160.
ZHU Yuan-yue,YANG Wen-tao,WANG Zhi-hong.Occupational hazards test and analysis on mechanical-electrical equipment installation in hydropower underground construction[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2011,7(10):160.
[8]李群.突发事件应急推演系统平台分析与设计[J].中国安全生产科学技术,2012,8(3):120.
LI Qun.Analysis and design of simulated emergency exercise system platform[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2012,8(10):120.
[9]刘铁民.应急预案重大突发事件情景构建*
——基于“情景-任务-能力”应急预案编制技术研究之一[J].中国安全生产科学技术,2012,8(4):5.
LIU Tie min.Studies on scenes’ construction of emergency planning
——part I of emergency planning technology based on “scenetaskability”[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2012,8(10):5.
[10]王爱莎,彭〓伟.突发事件下某教室的人员疏散研究[J].中国安全生产科学技术,2012,8(8):163.
WANG Ai sha,PENG Wei.Study on emergency evacuation of a classroom[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2012,8(10):163.