|本期目录/Table of Contents|

[1]程爱宝,古德生,刘洪强.基于AHP与粗糙集理论的采空区稳定性影响因素权重分析[J].中国安全生产科学技术,2011,7(9):50-55.
 CHENG Ai-bao,GU De-sheng,LIU Hong-qiang.Weights analysis of factors affecting the stability of Mined-out areas based on analytic hierarchy process and rough sets theory[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2011,7(9):50-55.
点击复制

基于AHP与粗糙集理论的采空区稳定性影响因素权重分析()
分享到:

《中国安全生产科学技术》[ISSN:1673-193X/CN:11-5335/TB]

卷:
7
期数:
2011年9期
页码:
50-55
栏目:
学术论著
出版日期:
2011-09-30

文章信息/Info

Title:
Weights analysis of factors affecting the stability of Mined-out areas based on analytic hierarchy process and rough sets theory
文章编号:
1673-193X(2011)-09-0050-06
作者:
程爱宝1古德生1刘洪强2
1.中南大学资源与安全工程学院,长沙? 410083
2.山东乾舜矿冶科技股份有限公司,济南 250014
Author(s):
CHENG Ai-bao1 GU De-sheng1 LIU Hong-qiang2
1.School of Resources and Safety Engineering, Central South University, Changsha? 410083, China
2.Shandong Qianshun Mine and Metallurgy technology Co., Ltd, Jinan? 250014, China
关键词:
层次分析法粗糙集采空区稳定性影响因素组合权重
Keywords:
analytic hierarchy process rough sets the stability of Mined-out areas influence factors combinational weight
分类号:
TD325
DOI:
-
文献标志码:
A
摘要:
为充分吸收层次分析法和粗糙集理论两类评价方法的优点,同时又能克服各自的缺陷,实现二者的优势互补,通过建立采空区稳定性影响因素综合评价指标体系,以层次分析法确定主观权重、粗糙集理论确定客观权重,然后将主、客观权重进行有机集成得到组合权重,使得采空区稳定性影响因素的评价更具客观性,从而提高采空区稳定性影响因素评价的精度。以老鸦巢矿区为例,构建了13个指标的综合评价指标体系,通过计算组合权重得到影响采空区稳定性的主要因素为高跨比、地质构造、最大暴露面积,这与矿山实际情况基本符合。
Abstract:
In order to totally absorb the advantages of analytic hierarchy process(AHP) and rough sets theory evaluation methods ,overcome the weaknesses and realize the complementary advantages, the synthetic assessment index system of factors affecting the stability of Mined-out areas is setted up, AHP is used to determine subjective weight ;rough set method is used to determine objective weigh. The subjective and objective weights will be organically integrated, from which we get the combination weight of factors affecting the stability of Mined-out areas. The proposed approach makes the risk assessment for factors affecting the stability of Mined-out areas more objective and improves the precision of risk assessment for factors affecting the stability of Mined-out areas. The comprehensive evaluation system was build up in Laoyachao mine, which consisted of 13indexes .The main factors affecting the stability of Mined-out areas were High-Span Ratio, geological structure, the maximum horizontal exposed area, which is accord with Mine’s actual situation.

参考文献/References:

[1]陈勇刚,杨晓强.基于模糊灰色关联的航空公司机队可靠性指标的优选[J].中国安全生产科学技术,2010,6(3):101-105CHEN Yong-gang,YANG Xiao-qiang.Optimization for index of airline fleet reliability based on fuzzy grey association[J].Journal of Sadety Science and Technology,2010,6(3):101-105[2]徐佳,张勤,吴继敏.功效系数法在确定岩体优势结构面中应用[J].岩土工程学报,2008,30(4):617-620XU Jia,ZHANG Qin,WU Ji-min.Application of efficacy coefficient method to determination of rock preferred structrual plane[J].Chinese Journal of Geotechnical Engineering, 2008,30(4):617-620[3]张绪美,董元华,石浚哲,等.聚类-因子分析在太湖水质参数评价中的应用[J].安全与环境学报,2006,6(6):58-62ZHANG Xu-hua,DONG Yuan-hua,SHI Jun-zhe,etc.Water quality evalution in Taihu Lake with the cluster-factor analysis method[J].Journal of Safety and Environment. 2006,6(6):58-62[4]余福茂,肖亮,袁飞.主成分分析在重大危险源风险评价中的应用研究[J].中国安全生产科学技术,2008,4(5):42-45YU Fu-mao,XIAO Liang,YUAN Fei.Application and research of PCA on risk assessment of major hazard installation[J].Journal of Sadety Science and Technology,2008,4(5):42-45[5]雷学文,葛书明.矿岩稳定性分级的灰色聚类方法及其应用[J].金属矿山,1994,220(10):22-25LEI Xue-wen,GE Shu-ming.Grey cluster method of ore-rock stability classification and its application[J].METAL MINE, 1994,220(10):22-25[6]王新民,段瑜,彭欣.采空区灾害危险度的模糊综合评价[J].矿业研究与开发,2005,25(2):83-85WANG Xin-min,DUAN Yu,PENG Xin.Fuzzy synthetic assessment of the danger degree of mined –out area disaster[J].Mining R&D,2005, 25(2):83-85[7]钟嘉明,李订芳.粗糙集与层次分析法集成的综合评价模型[J].武汉大学学报(工学版),2008,41(4):126-130ZHONG Jia-ming,LI Ding-fang.Comprehensive evaluation model intergrated based on rough set and analytic hierarchy process[J].Engineering Journal of Wuhan University, 2008,41(4):126-130[8]李成林,何谐.基于Rough Set和层次分析法的煤矿安全评价方法[J].河南理工大学学报(自然科学版),2008,27(1):6-11LI Cheng-lin,HE Xie.Coal mine safety assessment based on rough set theory and analytical hierarchy process[J].Journal of HENAN Pilytechnic University(Natural Science),2008,27(1):6-11[9]征峥,束金龙.基于粗糙集与层次分析法的组合预测方法[J].经济数学,2003,20(4):70-76ZHENG Zheng.SHU Jin-long.A new method of combination forecast based on rough sets theory and analytic hierarchy process[J].Mathematics Ineconomics, 2003,20(4):70-76[10]于志鹏,陆愈实.模糊层次综合评价法在企业安全评价中的应用[J].中国安全生产科学技术,2006,2(3):119-121YU Zhi-peng,LU Yu-shi.Application of fuzzy analytical hierarchy process in enterprise safety assessment[J].Journal of Sadety Science and Technology,2006,2(3):1119-121[11]Pawlak Z.Rough sets[J].International Journal of Computer Information Science,1982,11(5):342-356[12]Nguyen J.Classification based on optimal feature extraction and the theory of rough sets[D].SDSU,1995[13]Pawlak Z.Rough set theory and its applications to data analysis[J].Cybernetics and Systems:An International Joernal,1998,29(1):661-688[14]张文修,吴伟志,梁吉业,等.粗糙集理论与方法[M].北京:科学出版社,2001ZHANG Wen-xiu,XU Wei-zhi,LIANG Ji-ye,etc.Rough set theoty and method[M].beijing:Science Press,2001[15]朱建平,曾玉钰.基于属性重要性的定性数据聚类分析及应用[J].计算机技术与发展,2007,17(12):89-95ZHU Jian-ping,ZENG Yu-yu,Analysis and application of qualitative data clustering apprach based on attribute importance[J].Computer technology and development,2007,17(12):89-95[16]王汉斌,杨鑫.一种基于AHP-RS的组合权重确定方法[J].中国安全生产科学技术,2010,6(6):155-160WANG Han-bin,YANG Xin.A new method of ascertaining weight based on analytic hierarchy process and rough set theory[J].Journal of Sadety Science and Technology,2010,6(6):155-166[17]匡乐红,徐林荣,刘宝琛.组合赋权法确定地质灾害危险性评价指标权重[J].地下空间与工程学报.2006,2(6):1063-1075KUANG Le-hong,XU Lin-rong,LIU Bao-chen.A combination weighting method for determining the index weight in geological hazard risk assessment[J].Chinese Journal of Underground Space and Eengineering. 2006,2(6):1063-1075

相似文献/References:

[1]段礼祥,张来斌,钱永梅.AHP—模糊综合评价法在离心泵安全评价中的应用[J].中国安全生产科学技术,2011,7(2):127.
 DUAN Li xiang,ZHANG Lai bin,QIAN Yong mei.Application of fuzzy comprehensive evaluation in safety assessme of centrifuge pumpnt[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2011,7(9):127.
[2]施式亮,刘勇,李润求,等.基于AHPFuzzy的高处坠落危险性评价研究[J].中国安全生产科学技术,2011,7(2):132.
 SHI Shi liang,LIU Yong,LI Run qiu,et al.Research and application on risk assessment of high falling based on AHPFuzzy[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2011,7(9):132.
[3]王秀香,施红勋,牟善军,等.基于层次分析法的企业HSE管理绩效评估[J].中国安全生产科学技术,2011,7(3):98.
 WANG Xiu-xiang,SHI Hong-xun,MU Shan-jun,et al.Study on performance evaluation of enterprise HSE management based on AHP[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2011,7(9):98.
[4]郭金玉,黄轶,廖海江,等.多层次模糊综合评估汽车制造企业职业危害风险[J].中国安全生产科学技术,2011,7(5):81.
 GUO Jin-yu,HUANG Yi,LIAO Hai-jiang,et al.Comprehensive evaluation on the occupational hazard risk in automobile industry based on multi-stage fuzzy-AHP comprehensive assessment[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2011,7(9):81.
[5]何沙,吉安民,陈东升.模糊综合评价在钻井队安全管理评价中的应用[J].中国安全生产科学技术,2011,7(6):156.
 HE Sha,JI An-min,CHEN Dong-sheng.Application of fuzzy comprehensive evaluation in security management assessment Oil-drilling group[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2011,7(9):156.
[6]赵秀雯,柴建设.城市埋地天然气管道系统脆弱性评估指标研究[J].中国安全生产科学技术,2011,7(7):92.
 ZHAO- XiuwenCHAI- Jianshe,Prof..The indicators of vulnerability assessment about city buried gas pipeline system[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2011,7(9):92.
[7]杨晓强,周长春,颜影.基于层次分析和模糊评价的民航客机雷击风险管理[J].中国安全生产科学技术,2011,7(10):60.
 YANG Xiao-qiang,ZHOU Chang-chun,YAN Ying.Risk management of aircraft thunderstroke? based AHP and fuzzy evaluation[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2011,7(9):60.
[8]张村峰,卞奇侃,蒋军成.基于“事故树—层次分析法”的高校学生宿舍火灾风险分析[J].中国安全生产科学技术,2011,7(10):100.
 ZHANG Cun-feng,BIAN Qi-kan,JIANG Jun-cheng.Fire risk analysis on university dormitory based on accident tree analysis and analytic hierarchy process[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2011,7(9):100.
[9]葛秀坤,邵辉,赵庆贤,等.大型超市安全管理的定量评价研究[J].中国安全生产科学技术,2011,7(10):119.
 GE Xiu-kun,SHAO Hui,ZHAO Qing-xian,et al.Research on quantitative assessment of safety management in large supermarket[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2011,7(9):119.
[10]郭恒,陈国明.海洋钻井平台事故致因分析与评价指标研究[J].中国安全生产科学技术,2012,8(3):108.
 GUO Heng,CHEN Guo ming.The accidentcausing analysis and evaluation indexes for offshore drilling platforms[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2012,8(9):108.

备注/Memo

备注/Memo:
收稿日期:2011-04-03
作者简介:程爱宝,博士研究生。
基金项目:“十一五”国家科技支撑计划课题(编号:2008BAB32B03)
更新日期/Last Update: