[1]唐华辉.高地应力中硬围岩环境下TBM卡机机理与对策研究[D].成都:成都理工大学,2018.
[2]XU Z H,WANG W Y,LIN P,et al.Hard-rock TBM jamming subject to adverse geological conditions:Influencing factor,hazard mode and a case study of Gaoligongshan Tunnel[J].Tunnelling and Underground Space Technology,2021,36:108.
[3]杨晓迎,翟建华,谷世发,等.TBM在深埋超长隧洞断层破碎带卡机后脱困施工技术[J].水利水电技术,2010,41(9):68-71.
YANG Xiaoying,ZHAI Jianhua,GU Shifa,et al.Technology for unblocking TBM blocked in fault zone of superlong and deep buried tunnel[J].Water Resources and Hydropower Engineering,2010,41(9):68-71.
[4]王焕明,陈方明.复杂地质区TBM卡机成因分析及脱困技术[J].人民长江,2014,45(3):66-69.
WANG Huanming,CHEN Fangming.Cause analysis on TBM jam accident in adverse geological strata and jam-removing techniques[J].Yangze River,2014,45(3):66-69.
[5]陈兴龙,朱发昇,黄旭斌.引洮7~#隧洞TBM卡机脱困冻结施工热固耦合分析[J].水利水电技术,2015,46(4):78-82.
CHEN Xinglong,ZHU Fasheng,HUANG Xubin.Thermo-solid coupling analysis on freezing construction for de-blocking TBM blocked in No.7 Tunnel of Taohe River Water Diversion Project[J].Water Resources and Hydropower Engineering,2015,46(4):78-82.
[6]刘宁,张春生,褚卫江,等.深埋破碎岩体TBM掘进风险评估与应对[J].岩石力学与工程学报,2015,34(S1):3348-3355.
LIU Ning,ZHANG Chunsheng,CHU Weijing,et al.Risk assessment and response of TBM excavation in deep buried fractured rock mass[J].Chinese Journal of Rock Mechanics and Engineering,2015,34(S1):3348-3355.
[7]董泗龙.敞开式TBM断层破碎带脱困技术[J].隧道建设,2016,36(3):326-330.
DONG Silong.Jam releasing technologies for open-type TBM bored in fault and fracture zones.[J].Tunnel Construction,2016,36(3):326-330.
[8]杨继华,杨风威,姚阳,等.CCS水电站引水隧洞TBM断层带卡机脱困技术[J].水利水电科技进展,2017,37(5):89-94.
YANG Jihua,YANG Fengwei,YAO Yang,et al.Technology for TBM unblocking in a fault zone at CCS Hydropower Station headrace tunnel[J].Advances in Science and Technology of Water Resources,2017,37(5):89-94.
[9]黄兴,刘泉声,彭星新,等.引大济湟工程TBM挤压大变形卡机计算分析与综合防控[J].岩土力学,2017,38(10):2962-2972.
HUANG Xing,LIU Quansheng,PENG Xingxin,et al.Analysis and comprehensive prevention-control for TBM jamming induced by squeezing deformation of surrounding rock around water diversion tunnel from Datong river into Huangshui river[J].Rock and Soil Mechanics,2017,38(10):2962-2972.
[10]程建龙,杨圣奇,杜立坤,等.复合地层中双护盾TBM与围岩相互作用机制三维数值模拟研究[J].岩石力学与工程学报,2016,35(3):511-523.
CHENG Jianlong,YANG Shengqi,DU Likun,et al.Three-dimensional numerical simulation on interaction between double-shield TBM and surrounding rock mass in composite ground[J].Chinese Journal of Rock Mechanics and Engineering,2016,35(3):511-523.
[11]HUANG X,LIU Q,PENG X,et al.Mechanism and forecasting model for shield jamming during TBM tunnelling through deep soft ground[J].European Journalof Environmental and Civil Engineering,2019,23(9):1035-1068.
[12]谢海波,洪啸,赵阳,等.液体黏性离合器在全断面硬岩掘进机刀盘驱动中的运用[J].机械工程学报,2014,50(21):69-75.
XIE Haibo,HONG Xiao,ZHAO Yang,et al.Application of hydro-viscous driver in TBM cutter-head driving technology[J].Journal of Mechanical Engineering,2014,50(21):69-75.
[13]刘统.硬岩隧道掘进机位姿调控及刀盘驱动技术研究[D].杭州:浙江大学,2018.
[14]WEN S,LIU H,ZHAO L.Risk analysis on the accident of TBM’s Cutterhead jamming caused by collapse of tunnel[C]//The Second International Conferene on Structures and Building Materials,2012:446-449,2246-2250.
[15]刘泉声,彭星新,黄兴,等.全断面隧道掘进机护盾受力监测及卡机预警[J].岩土力学,2018,39(9):3406-3414.
LIU Quansheng,PENG Xingxin,HUANG Xing,et al.Monitoring shield stress of tunnel boring machine and jamming warning[J].Rock and Soil Mechanics,2018,39(9):3406-3414.