|本期目录/Table of Contents|

[1]安亚雄,郑君长,张翾.软岩隧道塌方事故致灾因素耦合分析*[J].中国安全生产科学技术,2021,17(1):122-128.[doi:10.11731/j.issn.1673-193x.2021.01.020]
 AN Yaxiong,ZHENG Junchang,ZHANG Xuan.Coupling analysis on accident-causing factors of collapse accidents in soft rock tunnel[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2021,17(1):122-128.[doi:10.11731/j.issn.1673-193x.2021.01.020]
点击复制

软岩隧道塌方事故致灾因素耦合分析*
分享到:

《中国安全生产科学技术》[ISSN:1673-193X/CN:11-5335/TB]

卷:
17
期数:
2021年1期
页码:
122-128
栏目:
职业安全卫生管理与技术
出版日期:
2021-01-31

文章信息/Info

Title:
Coupling analysis on accident-causing factors of collapse accidents in soft rock tunnel
文章编号:
1673-193X(2021)-01-0122-07
作者:
安亚雄1郑君长1张翾2
(1.中国路桥工程有限责任公司,北京 100008;
2.交通部公路科学研究院,北京 100073)
Author(s):
AN Yaxiong ZHENG Junchang ZHANG Xuan
(1.China Road & Bridge Corporation,Beijing 100008,China;
2.Research Institute of Highway Ministry of Transport,Beijing 100073,China)
关键词:
塌方事故致灾因素耦合分析耦合路径N-K耦合模型
Keywords:
collapse accident accident-causing factor coupling analysis coupling path N-K coupling model
分类号:
X951
DOI:
10.11731/j.issn.1673-193x.2021.01.020
文献标志码:
A
摘要:
为减少专家主观判断对软岩隧道塌方事故评估的影响,提出1种从事故出发逆推分析事故致灾因素耦合机制的方法。基于142个隧道施工塌方事故案例,系统总结隧道塌方事故致灾因素,对塌方事故的致灾因素出现频率进行排序;从致灾因素之间关联耦合关系出发,结合隧道施工塌方事故的多因素耦合致灾机理,研究隧道塌方事故产生过程的多因素耦合路径和耦合过程;采用N-K耦合模型开展隧道塌方事故多因素耦合路径下的耦合关联值评估,并对耦合关联值进行排序从而找到控制塌方事故发生的致灾因素组合。结果表明:除4个主要致灾因素的全耦合外,围岩岩性-降雨-地下水的耦合关联值是洞身段中最大值,为17.79%,围岩岩性-偏压-地下水的耦合关联值是洞口段中最大值,为24.02%;洞身段的围岩岩性-地下水因素和洞口段的围岩岩性-偏压因素分别对耦合关联值大小起决定影响;耦合关联值不具备叠加效应,2因素耦合关联值可能比3因素耦合关联值更大。研究结果可为提高隧道事故分析与安全防控提供科学依据。
Abstract:
In order to reduce the influence of the subjective judgment of experts on the evaluation of collapse accident in the soft rock tunnel,a method for inversely analyzing the coupling mechanism of accident-causing factors from the accident was proposed.Based on 142 cases of tunnel construction collapse accident,the accident-causing factors of tunnel collapse accidents were systematically summarized,and the occurrence frequencies of collapse accident-causing factors were sorted.Starting from the correlation and coupling relationship between the accident-causing factors,combined with the multifactor coupling accident-causing mechanism of tunnel construction collapse accidents,the multifactor coupling path and coupling process of the tunnel collapse accident were studied.The N-K coupling model was used to evaluate the coupling correlation value under the multifactor coupling path of the tunnel collapse accident,and the coupling correlation values were sorted to find the combination of accident-causing factors controlling the occurrence of collapse accidents.The results showed that in addition to the full coupling of four main accident-causing factors,the coupling correlation value of surrounding rock lithologyrainfallgroundwater at the tunnel body section was the largest as 17.79%,and the coupling correlation value of surrounding rock lithologybias pressuregroundwater at the entrance section was the largest as 24.02%.The surrounding rock lithologygroundwater factor of the tunnel body section and the surrounding rock lithologybias pressure factor of the entrance section respectively played the decisive influence on the coupling correlation value.Moreover,the coupling correlation value did not have the superposition effect,and the twofactor coupling correlation value might be greater than the threefactor coupling correlation value.The research results provide important scientific basis for improving the tunnel accident analysis and safety prevention and control.

参考文献/References:

[1]傅贵,索晓,贾清淞,等.10种事故致因模型的对比研究[J].中国安全生产科学技术,2018,14(2):58-63. FU Gui,SUO Xiao,JIA Qingsong,et al.Comparative study on ten accident causation models[J].Journal of Safety Science and Technology,2018,14(2):58-63.
[2]周光裕,骆伟,练民.复杂地形陡峭偏压条件连拱隧道施工技术研究[J].公路工程,2018,43(4):269-273. ZHOU Guangyu,LUO Wei,LIAN Min.Research on construction techniques of dense biased condition double-arch tunnels with complicated terrain[J].Highway Engineering,2018,43(4):269-273.
[3]张志勇.层状软岩隧道塌方原因分析及对策措施研究——以桃树垭隧道为例[D].重庆:重庆交通大学,2009.
[4]姜杰.范家岭1号隧道拱顶塌方的发生机理及技术处理[J].隧道建设,2007,27(3):67-70,87. JIANG Jie.Causes for and treatment of vault collapse of No.1 Fanjialing Tunnel[J].Tunnel Construction,2007,27(3):67-70,87.
[5]罗涛.兰渝铁路木寨岭隧道塌方事故成因与预防措施[J].建筑工程技术与设计,2016(10):2094.
[6]陈龙,黄宏伟.岩石隧道工程风险浅析[J].岩石力学与工程学报,2005(1):110-115. CHEN Long,HUANG Hongwei.Risk analysis of rock tunnel engineering [J].Chinese Journal of Rock Mechanics and Engineering,2005(1):110-115.
[7]李珏池.浅埋软岩隧道失稳机理及塌方处置研究[D].重庆:重庆交通大学,2015.
[8]ZUO Q J,WU L,LIN C Y,et al.Analysis of failure properties and formatting mechanism of soft rock tunnel in meizoseismal areas[J].Chinese Journal of Rock Mechanics and Engineering,2016,35(2):369-377.
[9]WANG B,LI T B,HE C,et al.Analysis of failure properties and formatting mechanism of soft rock tunnel in meizoseismal areas[J].Chinese Journal of Rock Mechanics and Engineering,2012,31(5):928-936.
[10]徐海清,陈亮,王炜,等.软岩隧道围岩塌方的尖点突变预测分析[J].铁道工程学报,2016,33(11):97-101. XU Haiqing,CHEN Liang,WANG Wei,et al.Prediction analysis of surrounding rock collapse in soft rock tunnel by cusp catastrophe[J].Journal of Railway Engineering Society,2016,33(11):97-101.
[11]YANG Z H,YANG X L,ZHANG J H,et al.Study on collapse mechanism at tunnel export and its prevention measure[J].Journal of Central South University (Science and Technology),2015,46(6):2267-2273.
[12]PAN H Z,GOU J,WAN Z H,et al.Research on coupling degree model of safety risk system for tunnel construction in subway shield zone[J].Mathematical Problems in Engineering,2019,2019(5):1-19.
[13]张津嘉,许开立,王延瞳,等.瓦斯爆炸事故风险耦合分析[J].东北大学学报,2017,38(3):414-417,447. ZHANG Jinjia,XU Kaili,WANG Yantong,et al.Analysis of risk coupling of gas explosion accidents [J].Journal of Northeastern University:Natural Science,2017,38(3):414-417,447.
[14]王慧.地铁施工中人-环安全风险因素耦合作用研究[D].西安:西安工业大学,2018.

相似文献/References:

[1]张东,聂百胜,王龙康.我国煤矿安全生产事故的致灾因素分析[J].中国安全生产科学技术,2013,9(5):136.[doi:10.11731/j.issn.1673-193x.2013.05.026]
 ZHANG Dong,NIE Bai sheng,WANG Long kang.Investigation a disastercausing factors of coal mine accidents in China[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2013,9(1):136.[doi:10.11731/j.issn.1673-193x.2013.05.026]

备注/Memo

备注/Memo:
收稿日期: 2020-07-30
* 基金项目: 国家自然科学基金项目(41372295);中国路桥工程有限责任公司科技研发项目(2016-zlkj-08)
作者简介: 安亚雄,硕士,工程师,主要研究方向为隧道施工管理。
通信作者: 张翾,博士,教授级高级工程师,主要研究方向为隧道施工安全评估。