|本期目录/Table of Contents|

[1]李玉峰,刘袁春,胡大山,等.基于风险矩阵的水电站项目风险分级评估方法研究——以乌东德水电站为例[J].中国安全生产科学技术,2020,16(1):130-134.[doi:10.11731/j.issn.1673-193x.2020.01.021]
 LI Yufeng,LIU Yuanchun,HU Dashan,et al.Study on risk classification assessment method of hydropower station project based on risk matrixTaking Wudongde hydropower station as example[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2020,16(1):130-134.[doi:10.11731/j.issn.1673-193x.2020.01.021]
点击复制

基于风险矩阵的水电站项目风险分级评估方法研究——以乌东德水电站为例
分享到:

《中国安全生产科学技术》[ISSN:1673-193X/CN:11-5335/TB]

卷:
16
期数:
2020年1期
页码:
130-134
栏目:
职业安全卫生管理与技术
出版日期:
2020-01-30

文章信息/Info

Title:
Study on risk classification assessment method of hydropower station project based on risk matrixTaking Wudongde hydropower station as example
文章编号:
1673-193X(2020)-01-0130-05
作者:
李玉峰刘袁春胡大山郭进扬王学强
(1.中国三峡建设管理有限公司,云南 禄劝 651500;
2.中国能源研究会,北京 100045)
Author(s):
LI Yufeng1 LIU Yuanchun1 HU Dashan1 GUO Jinyang1 WANG Xueqiang
(1.China Three Gorges Projects Development Co.,Ltd.,Luquan Yunnan 651500,China;
2.China Energy Research Society,Beijing 100045,China)
关键词:
乌东德水电站水电站建设项目风险分级风险管理风险矩阵
Keywords:
Wudongde hydropower station hydropower station construction project risk classification risk management risk matrix
分类号:
X947
DOI:
10.11731/j.issn.1673-193x.2020.01.021
文献标志码:
A
摘要:
为了解决千万千瓦级巨型水电站项目建设过程的风险分析问题,以我国目前在建的千万千瓦级水电站重要项目—乌东德水电站为例,对水电站项目存在的隐患进行排查和梳理,找出影响安全施工的危险源,并采用风险矩阵法对其进行风险评估,将存在的风险按照其造成的影响后果不同分成可忽略(Ⅰ级)、可接受(Ⅱ级)、有条件可接受(Ⅲ级)和不可接受(Ⅳ)4个等级。研究结果不仅可用于查找、分析整个水电站项目建设过程中存在的重大风险,对风险进行有效、科学、简捷地评估,还可将各个风险点进行明确划分,对同类千万千瓦级巨型水电站的风险分析和安全管理工作具有参考和借鉴作用。
Abstract:
In order to solve the problem of risk analysis during the construction process of giant hydropower station projects with 10 million kilowatts level,taking the Wudongde hydropower station being an important project of hydropower station with 10 million kilowatts level under construction in China as an example,the existing hidden trouble of hydropower station projects were investigated and sorted out to find out the hazard sources influencing the safe construction.Then the risk matrix method was applied to carry out the risk assessment,and the existing risk were divided into four levels as negligible (level Ⅰ),acceptable (level Ⅱ),conditional acceptable (level Ⅲ) and unacceptable (Ⅳ) according to the different influence consequences.The results can not only be used to investigate and analyze the major risk in the whole construction process of hydropower station project and assess the risk effectively,scientifically and simply,but also divide each risk point clearly,which have certain reference significance for the risk analysis and safety management work of similar giant hydropower station projects with 10 million kilowatts level.

参考文献/References:

[1]彭才德.“十三五”水电发展及展望[J].中国电力企业管理,2019(4):34-36. PENG Caide.Development and prospect of hydropower in the 13th five-year plan [J].China Power Enterprise Management,2019(4):34-36.
[2]莫训华.水电站建设过程中业主方安全控制分析——基于一起较大安全事故[J].科技广场,2016(2):102-104. MO Xunhua.Analysis of safety control in hydropower station construction on the owner’s part:based on safety accident [J].Science Mosaic,2016(2):102-104.
[3]韦祥.桥巩水电站工程项目的安全管理研究[D].武汉:武汉工程大学,2017.
[4]王誉陶.凉风壳水电站项目运营安全风险因素分析[D].西安:西安工程大学,2017.
[5]张秋红.试论水电站工程建设施工安全管理[J].江西建材,2016(2):110,107. ZHANG Qiuhong.Discussion on safety management of construction of hydropower station [J].Jiangxi Building Materials,2016(2):110,107.
[6]王力,胡华东.水电站工程建设安全生产的标准化探讨[J].四川建材,2015,41(4):208,210. WANG Li,HU Huadong.Discussion on standardization of safety production in hydropower project construction [J].Sichuan Building Materials,2015,41(4):208,210.
[7]MASSE P.Les reserves et la régulation de l’avenirdans la vie economique.Ⅱ.Aveniraléatoire[J].Hermann Et Cie Paris,1946.
[8]LITTLE J D C.Theuse of storage water in a hydroelectric system [J].Journal of the Operations Research Society of America,1955,3(2):187-197.
[9]SILVERIA A,PEDRO F.Quantitative interpretation of results obtained in the observation of concrete dams [C]// 8th ICOLD Congress,1964.
[10]中华人民共和国住房与城乡建设部.大中型水电工程建设风险管理规范:GB/T 50927—2013 [S].北京:中国计划出版社,2014.
[11]李梁玉.基于风险矩阵法的化工厂突发人员伤亡评估研究[J].现代商贸工业,2019,40(12):96-97. LI Liangyu.Study on casualty assessment of sudden casualties in chemical plants based on risk matrix method [J].Modern Business Trade Industry,2019,40(12):96-97.
[12]王刚,徐长航,陈国明.基于工作安全分析和风险矩阵法的自升式平台拖航作业风险评估[J].中国安全生产科学技术,2013,9(10):109-114. WANG Gang,XU Changhang,CHEN Guoming.Risk assessment on towing operation of jack-up platform based on job safety analysis and risk matrix method [J].Journal of Safety Science and Technology,2013,9(10):109-114.
[13]郑登锋,蒋金生,王明勇.基于风险矩阵和LOPA的风险评价系统在油气管道的应用研究[J].中国安全生产科学技术,2012,8(10):76-81. ZHENG Dengfeng,JIANG Jinsheng,WANG Mingyong.Study on application of risk evaluation system based on risk matrix and LOPA in oil and gas pipeline system [J].Journal of Safety Science and Technology,2012,8(10):76-81.
[14]梁复.建筑施工企业安全风险分级管控机制的研究[J].建筑安全,2019,34(8):39-41. LIANG Fu.Research on grading management and control mechanism of safety risk in construction enterprises [J].Construction Safety,2019,34(8):39-41.

相似文献/References:

备注/Memo

备注/Memo:
收稿日期: 2019-10-15
作者简介: 李玉峰,硕士研究生,工程师,主要研究方向为水电工程建设安全管理、防汛减灾及应急管理。
更新日期/Last Update: 2020-03-02