[1]王家臣,刘峰,王蕾.煤炭科学开采与开采科学[J].煤炭学报,2016,41(11):2651-2660.
WANG Jiachen,LIU Feng,WANG Lei.Sustainable coal mining andmining sciences[J].Journal of China Coal Society,2016,41(11):2651-2660.
[2]钱鸣高,许家林,王家臣.再论煤炭的科学开采[J].煤炭学报,2018,43(1):1-13.
QIAN Minggao,XU Jialin,WANG Jiachen.Further on the sustainable mining of coal[J].Journal of China Coal Society,2018,43(1):1-13.
[3]吴吉南,冯学武,刘保宽.重型综放工作面无预回撤通道快速撤出技术[J].煤炭科学技术,2008,36(5):14-17.
WU Jinan,FENG Xuewu,LIU Baokuan.Rapid removing technologyof heavy fully mechanized top coal caving mining face without pre-set removing gateway[J].Coal Science and Technology,2008,36(5):14-17.
[4]马万祥,邓新东.预掘双回撤通道工艺在枣泉煤矿大采高综采工作面的应用[J].神华科技,2013,11(1):23-27.
MA Wanxiang,DENG Xindong.Pre-driven double retracement channel technology in Zaoquan coal mine large mining height fully mechanized coal mining face[J].Shenhua Science and Technology,2013,11(1):23-27.
[5]翁海龙.预掘单回撤通道在保德煤矿综放工作面的应用[J].陕西煤炭,2017,36(1):130-132.
WENG Hailong.Application of pre-driven single retracement channel in the fully-mechanized caving face of Baode coal mine[J].Shaanxi Coal,2017,36(1):130-132.
[6]王博楠.回撤通道围岩变形破坏机理及其控制技术研究[D].西安:西安科技大学,2017.
[7]王志军.综采工作面末采及回撤矿压控制技术[J].煤矿现代化,2017(6):60-62.
WANG Zhijun.Control technology of mining and retaining of fully mechanized coal mining face[J].Coal Mine Modernization,2017(6):60-62.
[8]钱鸣高,石平五.矿山压力与岩层控制[M].徐州:中国矿业大学出版社,2003.
[9]杜晓丽.采矿岩石压力拱演化规律及其应用的研究[D].徐州:中国矿业大学,2011.
[10]李宁.采场压力拱演化特征及失稳机理分析[D].秦皇岛:燕山大学,2014.
[11]谷拴成,王博楠,黄荣宾,等.综采面末采段回撤通道煤柱荷载与宽度确定方法[J].中国矿业大学学报,2015,44(6):990-995.
GU Shuancheng,WANG Bonan,HUANG Rongbin,et al.Method for determining the load on and width of coal pillar at the recovery room end of fully-mechanized longwall minig[J].Journal of China University of Mining and Technology,2015,44(6):990-995.
[12]MARK C.The state-of-the art in coal pillar design[J].Transactions-Society for Mining Metallurgy and Exploration Incorporated,1999(1):1-8.
[13]王晓振,许家林,朱卫兵,等.浅埋综采面高速推进对周期来压特征的影响[J].中国矿业大学学报,2012,41(3):349-354.
WANG Xiaozhen,XU Jalin,ZHU Weibing,et al.Influence of high mining velocity on periodic weighting during fully-mechanized mining in a shallow seam[J] Journal of China University of Mining and Technology,2012,41(3):349-354.
[14]谷拴成,黄荣宾,李金华,等.工作面贯通前矿压调整时剩余煤柱稳定性分析[J].采矿与安全工程学报,2017,34(1):60-66.
GU Shuancheng,HUANG Rongbin,LI Jinhua,et al.Mined coal pillars during the pressure adjustment prior to working face transfixion[J].Journal of Mining and Safety Engineering,2017,34(1):60-66.
[15]张炜,张东升,王旭锋,等.大采高工作面大断面回撤通道联合支护效果模拟分析[J].煤炭工程,2009,41(3):64-66.
ZHANG Wei,ZHANG Dongsheng,WANG Xufeng,et al.Simulation analysison results of combined support applied to large crosssection with drawal roadway in large mining height coal face[J].Coal Engineering,2009,41(3):64-66.
[16]侯凤才.不同采高采场受力特征的数值模拟[J].黑龙江科技大学学报,2017,27(1):31-34.
HOU Fengcai.Numerical simulation on stress characteristics behind mining height stope[J].Journal of Heilongjiang University of Science & Technology,2017,27(1):31-34.
[17]刘万荣,马海峰,彭超.浅埋薄基岩煤层合理采高的选择[J].煤矿安全,2014,45(5):194-196,200.
LIU Wanrong,MA Haifeng,PENG Chao.Selection of rational mining height in shallow coal seam with thin bedrock[J].Safety in Coal Mine,2014,45(5):194-196,200.