走向工作面贯通上山与支架快速回撤技术
分享到:

《中国安全生产科学技术》[ISSN:1673-193X/CN:11-5335/TB]

卷:
16
期数:
2020年1期
页码:
18-24
栏目:
学术论著
出版日期:
2020-01-30

文章信息/Info

Title:
Technologies of uphill transfixion and rapid retracing of brackets in along strike working face
文章编号:
1673-193X(2020)-01-0018-07
作者:
王志强王树帅苏泽华黄鑫
(1.中国矿业大学(北京) 能源与矿业学院,北京 100083;
2.中国矿业大学(北京)共伴生能源精准开采北京市重点实验室,北京 100083;
3.中国矿业大学(北京)煤炭安全开采与地质保障国家级实验教学示范中心,北京 100083)
Author(s):
WANG Zhiqiang WANG Shushuai SU Zehua HUANG Xin
(1.School of Energy and Mining Engineering,China University of Mining and Technology (Beijing),Beijing 100083,China;
2.Beijing Key Laboratory for Precise Mining of Intergrown Energy and Resources,China University of Mining and Technology (Beijing),Beijing 100083,China;
3.National Demonstration Center for Experimental Safe Coal Mining and Geological Guarantee Education,China University of Mining and Technology (Beijing),Beijing 100083,China)
关键词:
贯通上山支架回撤末采工艺煤柱应力支架留巷
Keywords:
uphill transfixion bracket retracing final mining process stress of coal pillar bracket entry retaining
分类号:
X936;TD322
DOI:
10.11731/j.issn.1673-193x.2020.01.003
文献标志码:
A
摘要:
针对走向工作面停采线与上山之间的护巷煤柱造成煤炭损失,支架回撤工艺复杂、巷道掘进量大等问题,提出走向工作面贯通上山与支架快速回撤技术。工作面贯通采区上山,利用上山回撤支架。在贯通前,利用压力拱模型分析剩余煤柱应力变化规律,并结合极限平衡区公式,确定让压煤柱为8 m;对贯通前基本顶合理断裂位置、让压调节机制、末采阶段采高进行了分析确定,并采取上山巷内补强支护及挂绳铺网措施。贯通上山后,首先利用支架对上山留巷,完成留巷后,利用上山回撤支架,先将上部端头3架逆时针旋转90°作为掩护架,在对剩余支架逐架回撤时,3个掩护架呈现台阶型。提出的技术取消了护巷煤柱及回撤通道,提高了煤炭采出率,减少了巷道掘进量,简化了回撤工艺。
Abstract:
Aiming at the problems that the entry protection coal pillars between the stopping line and uphill in the along strike working face will cause the coal loss,the retracing process of brackets is complex and the excavation amount is large,the technologies of uphill transfixion and rapid retracing of brackets in the along strike working face were put forward.The working face transfixed the uphill,and the brackets were retracted by using the uphill.Before the transfixion,the change laws of residual coal pillar stress were analyzed by using the pressure arch model,and the yielding coal pillar was determined as 8 m with the formula of limit equilibrium area.The reasonable fracture position of basic roof,yielding adjustment mechanism and mining height at final mining stage before the transfixion were analyzed and determined,and the measures of reinforced support and lanyard and paving were adopted in the uphill roadway.After the uphill transfixion,the uphill entry retaining was conducted by using the brackets,and the brackets were retracted by using the uphill after completing the entry retaining.Three brackets at upper end were anticlockwise rotated 90° as the shield brackets,and they presented the step type when retracting the remaining brackets one by one.The technology canceled the entry protection coal pillars and retracement channel,improved the coal mining rate,reduced the roadway excavation amount and simplified the retracement process.

参考文献/References:

[1]王家臣,刘峰,王蕾.煤炭科学开采与开采科学[J].煤炭学报,2016,41(11):2651-2660. WANG Jiachen,LIU Feng,WANG Lei.Sustainable coal mining andmining sciences[J].Journal of China Coal Society,2016,41(11):2651-2660.
[2]钱鸣高,许家林,王家臣.再论煤炭的科学开采[J].煤炭学报,2018,43(1):1-13. QIAN Minggao,XU Jialin,WANG Jiachen.Further on the sustainable mining of coal[J].Journal of China Coal Society,2018,43(1):1-13.
[3]吴吉南,冯学武,刘保宽.重型综放工作面无预回撤通道快速撤出技术[J].煤炭科学技术,2008,36(5):14-17. WU Jinan,FENG Xuewu,LIU Baokuan.Rapid removing technologyof heavy fully mechanized top coal caving mining face without pre-set removing gateway[J].Coal Science and Technology,2008,36(5):14-17.
[4]马万祥,邓新东.预掘双回撤通道工艺在枣泉煤矿大采高综采工作面的应用[J].神华科技,2013,11(1):23-27. MA Wanxiang,DENG Xindong.Pre-driven double retracement channel technology in Zaoquan coal mine large mining height fully mechanized coal mining face[J].Shenhua Science and Technology,2013,11(1):23-27.
[5]翁海龙.预掘单回撤通道在保德煤矿综放工作面的应用[J].陕西煤炭,2017,36(1):130-132. WENG Hailong.Application of pre-driven single retracement channel in the fully-mechanized caving face of Baode coal mine[J].Shaanxi Coal,2017,36(1):130-132.
[6]王博楠.回撤通道围岩变形破坏机理及其控制技术研究[D].西安:西安科技大学,2017.
[7]王志军.综采工作面末采及回撤矿压控制技术[J].煤矿现代化,2017(6):60-62. WANG Zhijun.Control technology of mining and retaining of fully mechanized coal mining face[J].Coal Mine Modernization,2017(6):60-62.
[8]钱鸣高,石平五.矿山压力与岩层控制[M].徐州:中国矿业大学出版社,2003.
[9]杜晓丽.采矿岩石压力拱演化规律及其应用的研究[D].徐州:中国矿业大学,2011.
[10]李宁.采场压力拱演化特征及失稳机理分析[D].秦皇岛:燕山大学,2014.
[11]谷拴成,王博楠,黄荣宾,等.综采面末采段回撤通道煤柱荷载与宽度确定方法[J].中国矿业大学学报,2015,44(6):990-995. GU Shuancheng,WANG Bonan,HUANG Rongbin,et al.Method for determining the load on and width of coal pillar at the recovery room end of fully-mechanized longwall minig[J].Journal of China University of Mining and Technology,2015,44(6):990-995.
[12]MARK C.The state-of-the art in coal pillar design[J].Transactions-Society for Mining Metallurgy and Exploration Incorporated,1999(1):1-8.
[13]王晓振,许家林,朱卫兵,等.浅埋综采面高速推进对周期来压特征的影响[J].中国矿业大学学报,2012,41(3):349-354. WANG Xiaozhen,XU Jalin,ZHU Weibing,et al.Influence of high mining velocity on periodic weighting during fully-mechanized mining in a shallow seam[J] Journal of China University of Mining and Technology,2012,41(3):349-354.
[14]谷拴成,黄荣宾,李金华,等.工作面贯通前矿压调整时剩余煤柱稳定性分析[J].采矿与安全工程学报,2017,34(1):60-66. GU Shuancheng,HUANG Rongbin,LI Jinhua,et al.Mined coal pillars during the pressure adjustment prior to working face transfixion[J].Journal of Mining and Safety Engineering,2017,34(1):60-66.
[15]张炜,张东升,王旭锋,等.大采高工作面大断面回撤通道联合支护效果模拟分析[J].煤炭工程,2009,41(3):64-66. ZHANG Wei,ZHANG Dongsheng,WANG Xufeng,et al.Simulation analysison results of combined support applied to large crosssection with drawal roadway in large mining height coal face[J].Coal Engineering,2009,41(3):64-66.
[16]侯凤才.不同采高采场受力特征的数值模拟[J].黑龙江科技大学学报,2017,27(1):31-34. HOU Fengcai.Numerical simulation on stress characteristics behind mining height stope[J].Journal of Heilongjiang University of Science & Technology,2017,27(1):31-34.
[17]刘万荣,马海峰,彭超.浅埋薄基岩煤层合理采高的选择[J].煤矿安全,2014,45(5):194-196,200. LIU Wanrong,MA Haifeng,PENG Chao.Selection of rational mining height in shallow coal seam with thin bedrock[J].Safety in Coal Mine,2014,45(5):194-196,200.

相似文献/References:

备注/Memo

备注/Memo:
收稿日期: 2019-08-14
* 基金项目: 国家自然科学基金青年基金项目(51404270);国家自然科学基金面上项目(51774289);中央高校基本科研业务费专项资金项目(2011QZ06);西部煤炭绿色安全开发国家重点实验室开放基金项目(SKLCRKF1903)
作者简介: 王志强,博士,副教授,主要研究方向为采矿方法与工艺、矿山压力及岩层控制。
更新日期/Last Update: 2020-03-02