[1]赵子萱.高处作业吊篮施工安全监管研究[D].北京:首都经济贸易大学,2018.
[2]中华人民共和国中央人民政府网站.国务院安委会办公室关于实施遏制重特大事故工作指南构建双重预防机制的意见[EB/OL].(2016-10-11)[2019-04-11].http://www.gov.cn/xinwen/2016-10/11/content_5117487.htm.
[3]李蒙,刘苹,余宏亮.基于可穿戴技术的建筑现场施工人员实时安全预警系统研究[J].工业安全与环保,2018,44(11):32-35.
LI Meng,LIU Ping,YU Hongliang.Realtime safety warning system for site construction workers based on wearable technology[J].Industrial Safety and Environmental Protection,2018,44(11):32-35.
[4]马明焕,王新浩,许晓辉,等.基于数据挖掘技术的事故隐患预警方法研究[J].中国安全生产科学技术,2017,13(7):11-17.
MA Minghuan,WANG Xinhao,XU Xiaohui,et al.Research on early-warning method of potential safety hazard based on data mining techniques[J].Journal of Safety Scienceand Technology,2017,13(7):11-17.
[5]朱宗涛,朱攀峰,李亚亚.施工安全防护系统研究[J].铁路计算机应用,2018,27(11):65-68.
ZHU Zongtao,ZHU Panfeng,LI Yaya.Research on construction safety protection system[J].Railway Computer Application,2018,27(11):65-68.
[6] XIA N,ZOU P X W,LIU X,et al.A hybrid BN-HFACS model for predicting safety performance in construction projects[J].Safety Science,2018(101):332-343.
[7]王乾坤,年春光,杨冬,等.基于T-S模糊神经网络的地铁深基坑安全预警[J].中国安全科学学报,2018,28(8):161-167.
WANG Qiankun,NIAN Chunguang,YANG Dong,et al.Early warning of risks in metro deep foundation pit construction based on T-S fuzzy neural network[J].China Safety ScienceJournal,2018,28(8):161-167.
[8]李万庆,安娟.基于RS-SVM的建筑施工项目安全预警模型[J].河北工程大学学报(自然科学版),2010,27(4):30-35.
LI Wanqing,AN Juan.Safety early- warning model of construction project based on rough set and support vector machine[J].Journal of Hebei University of Engineering(Natural Science Edition),2010,27(4):30-35.
[9]汪马成.基于PSO-SVM模型的建筑施工项目安全预警方法研究[D].上海:上海工程技术大学,2016.
[10]吴贤国,黄艳华,马健,等.基于云证据理论的地铁盾构施工临近建筑物变形安全控制预警决策方法研究[J].安全与环境工程,2016,23(5):174-182.
WU Xianguo,HUANG Yanhua,MA Jian,et al.Decision-making method of safety control warning on deformation of adjacent buildings induced by shield construction of metro based on the cloud model and d-s evidence theory[J].Safety and Environmental Engineering,2016,23(5):174-182.
[11]李英攀,史明亮,刘名强,等.基于Cloud-BIM和UWB的施工现场智能安全系统研究[J].中国安全生产科学技术,2018,14(9):151-157.
LI Yingpan,SHI Mingliang,LIU Mingqiang,et al.Research on intelligent safety system of construction site based on Cloud-BIM and UWB[J].Journal of Safety Science and Technology,2018,14(9):151-157.
[12]张泾杰,韩豫,马国鑫,等.基于BIM和RFID的建筑工人高处坠落事故智能预警系统研究[J].工程管理学报,2015,29(6):17-21.
ZHANG Jingjie,HAN Yu,MA Guoxin,et al.Research of intelligent early warning system for falling accidents based on BIM and RFID for construction workers[J].Journal of Engineering Management,2015,29(6):17-21.
[13]刘名强,李英攀,王芳,等.基于RVM的装配式建筑吊装作业安全预警模型[J].中国安全科学学报,2018,28(4):109-114.
LIU Mingqiang,LI Yingpan,WANG Fang,et al.An RVM based safety early warning model for hoisting operation in fabricated building project[J].China Safety Science Journal,2018,28(4):109-114.
[14]杨涛.建筑工程高空作业安全预警与管理研究[D].南京:东南大学,2016.
[15]CHIHCHUNG C,CHIHJEN L.Libsvm:a library for support vector machines[J].ACM Transactions on Intelligent Systems and Technology,2011(2):1-27.
[16]中华人民共和国工业和信息化部.高处作业吊篮安装、拆卸、使用技术规程:JB/T 11699—2013[S].北京:机械工业出版社,2014.
[17]住房和城乡建设部定额研究所.建筑施工安全检查标准:JGJ 59—2011[S].北京:中国建筑工业出版社,2012.
[18]中华人民共和国住房和城乡建设部.建筑施工高处作业安全技术规范:JGJ 80—2016[S].北京:中国建筑工业出版社,2016.
[1]李密,王晓,邱东凤,等.加油加气站雷击静电事故分析及安全防护技术[J].中国安全生产科学技术,2011,7(7):199.
Li Mi Wang Xiao Qiu Dongfeng Hu Shipeng.Analysis and Countermeasure about Lightning Static Accident of Automobile Gasoline and Gas Filling Station[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2011,7(10):199.
[2]成芳,易先中,彭灼,等.页岩气压裂弯管中液固两相流冲蚀磨损的数值模拟[J].中国安全生产科学技术,2019,15(11):29.[doi:10.11731/j.issn.1673-193x.2019.11.005]
CHENG Fang,YI Xianzhong,PENG Zhuo,et al.Numerical simulation on erosion wear in shale gas fracturing bend pipe with liquidsolid twophase flow[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2019,15(10):29.[doi:10.11731/j.issn.1673-193x.2019.11.005]