[1]刘小勇,沈立,孙明义.桥梁工程规划设计阶段施工安全风险评估的研究[J].中国安全生产科学技术,2012,8(8):79-83.LIU Xiaoyong,SHEN Li,SUN Mingyi.Research on the construction safety risk assessment in the planning and design stages of bridge engineering[J].Journal of Safety Science and Technology,2012,8(8):79-83.
[2]周敉,赵威,温杰,等.基于可靠度的桥梁船撞作用荷载组合分项系数[J].长安大学学报(自然科学版),2018,38(6):155-164.ZHOU Mi, ZHAO Wei,WEN Jie,et al.Combined partial coefficient of ship-bridge collision loads based on reliability[J].Journal of Chang’an University(Natural Science Edition),2018,38(6):155-164.
[3]夏春旭,柳春光.基于HAZUS的预应力混凝土简支梁桥地震风险评价[J].桥梁建设,2016,46(6):61-66.XIA Chunxu,LIU Chunguang.Seismic risk evaluation of PC simply-supported beam bridges based on HAZUS[J].Bridge Construction,2016,46(6):61-66.
[4]刘沐宇,金开明.大跨径悬索桥施工风险评估的集对分析方法[J].土木工程与管理学报,2017,34(5):1-7,14.LIU Muyu,JIN Kaiming.Set pair analysis for construction risk assessment of long span suspension bridge[J].Journal of Civil Engineering and Management,2017,34 (5):1-7,14.
[5]贾继筱,王福敏,李琦.基于层次分析与灰色模糊理论的桥梁施工风险评估[J].西华大学学报(自然科学版),2016,35(5):58-63.JIA Jixiao,WANG Fumin,LI Qi.Bridge construction risk assessment of based on analytic hierarchy process and grey fuzzy theory [J].Bridge Construction,2016,35(5):58-63.
[6]牛宏.大跨度连续刚构桥建设期风险分析研究[D].西安:长安大学,2009.
[7]杨超,高谦,钟海滨.基于ANSYS的可靠度分析方法及应用[J].中国安全生产科学技术,2012,8(7):139-142.YANG Chao,GAO Qian,ZHONG Haibin.Reliability analysis method and the application based on ANSYS [J].Journal of Safety Science and Technology,2012,8 (7):139-142.
[8]石超,多英全,罗艾民,等.基于JC法的RBI通用失效概率修正模型研究[J].中国安全生产科学技术,2011,7(5):108-112.SHI Chao,DUO Yingquan,LUO Aimin,et al.Study on the RBI equipment general failure probability model based on JC method[J].Journal of Safety Science and Technology,2011,7(5):108-112.
[9]朱劲松,肖汝诚,何立志.大跨度斜拉桥智能可靠度评估方法研究[J].土木工程学报,2007(5):41-48.ZHU Jinsong,XIAO Rucheng,HE Lizhi.Reliability assessment of large-span cable-stayed bridge based on artificial intelligence [J].China Civil Engineering Journal,2007 (5):41-48.
[10]VAZIRIZADE S M,NOZHATI S,ZADEH M A.Seismic reliability assessment of structures using artificial neural network[J].Journal of Building Engineering,2017,11:230-235.
[11]PAPADRAKAKIS M,PAPADOPOULOS V,LAGAROS N D.Structural reliability analyis of elastic-plastic structures using neural networks and Monte Carlo simulation[J].Computer Methods in Applied Mechanics and Engineering,1996,136(1-2):145-163.
[12]刘金琨,RBF神经网络自适应控制及MATLAB仿真[M].北京:清华大学出版社,2013.
[13]陈松坤,王德禹.基于神经网络的蒙特卡罗可靠性分析方法[J].上海交通大学学报,2018,52(6):687-692.CHEN Songkun,WANG Deyu.An improved Monte Carlo reliability analysis method based on neural network[J].Journal of Shanghai Jiaotong University,2018,52(6):687-692.
[14]赵国藩,金伟良,贡金鑫.结构可靠度理论[M].北京:中国建筑工业出版社,2000.
[15]王立峰,姜洪伟,崔海龙.波形钢腹板矮塔斜拉桥参数敏感性分析[J].公路工程,2015,40(2):117-121.WANG Lifeng,JIANG Hongwei,CUI Hailong.Analysis of parameters sensitivity of extradosed cable-stayed bridge with corrugated steel webs[J].Highway Engineering,2015,40(2):117-121.
[16]中国铁道科学研究院.铁路工程结构可靠性设计统一标准 (试行)[M].北京:中国铁道出版社,2014.
[17]方开泰.均匀设计与均匀设计表[M].北京:科学出版社,1994.
[1]胡长明,刘一衡,黄华,等.风险因素耦合作用下的整体钢平台施工预警方法研究[J].中国安全生产科学技术,2023,19(9):103.[doi:10.11731/j.issn.1673-193x.2023.09.015]
HU Changming,LIU Yiheng,HUANG Hua,et al.Research on early warning method for construction of integrated steel platform under coupling effect of risk factors[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2023,19(9):103.[doi:10.11731/j.issn.1673-193x.2023.09.015]