[1]ATTEWELL P E.Soil movements induced by tunneling and their effects on pipelines and structures[M].New Delhi:Thomson Press(India) Limited,1986.
[2]李大勇,龚晓南,张土乔.软土地基深基坑周围地下管线保护措施的数值模拟[J].岩土工程学报,2001,23(6):736-740.LI Dayong,GONG Xiaonan,ZHANG Tuqiao.Numerical simulation of the buried pipelines protection adjacent to deep excavation[J].Chinese Journal of Geotechuleal Engineering,2001,23(6):736-740.
[3]吴波,高波,索晓明,等.城市地铁隧道施工对管线的影响研究[J].岩土力学,2004,25(4):657-662.WU Bo,GAO Bo,SUO Xiaoming,et al.Study on influence of metro tunnel excavation on buried pipe-lines[J].Chinese Journal of Rock Mechanics and Engineering,2004,25(4):657-662.
[4]王霆,刘维宁,李兴高,等.地铁施工影响邻近管线的研究现状与展望[J].中国铁道科学,2006,27(6):117-123.WANG Ting,LIU Weining,LI Xinggao,et al.Current situation and prospect of studies on tunneling-induced effect of adjacent pipelines[J].China Railway Science,2006,27(6):117-123.
[5]VORSTER T,KLAR A,SOGA K,et al.Estimating the effects of tunneling on existed pipeline[J].Journal of Geotechnical and Geoenvironmental Engineering,2005,131(11):1399-1410.
[6]李大勇,张土乔,龚晓南.深基坑开挖引起临近地下管线的位移分析[J].工业建筑,1999,29 (11):36-41.LI Dayong,ZHANG Tuqiao,GONG Xiaonan.Analysis of the displacements of buried pipelines caused by deep excavations[J].Industrial Construction,1999,29(11):36-41.
[7]ASSAF K,VORSTER T E B,KENICHI S,et al.Soil pipe-tunnel interaction:Comparison between winker and elastic continuum solution[R].Cambridge:Technical Report of the University of Cambridge,2004.
[8]VORSTER T E B,MAIR R J,SOGA K,et al.Centrifuge modeling of the effect of tunneling on buried pipe-lines:Mechanisms observed[C]//Proceeding of the 5thInternational Symposium on Geotechnical Aspects of Underground Construction in Soft Ground.Amsterdam,The Netherlands:[s.n.],2005:131-136.
[9]吴健,马永峰,钱明,等.邻近双线盾构隧道的深基坑施工分析[J].交通科学与工程,2010,26(3):36-40,45.WU Jian,MA Yongfeng,QIAN Ming,et al.Analysis of deep pit construction adjacent to shield tunnel[J].Journal of Transport Science and Engineering,2010,26(3):36-40,45.
[10]CELESTINO T B,GOMES R A M,BORTOLUCCI A A.Errors in ground distortions due to settlement trough adjustment[J].Tunneling and Underground Space Technology,2000,15(1):97-100.
[11]LEE S W.The effects of compensation injections on tunnels[D].Cambridge,UK:Cambridge University,1974.
[12]侯公羽.岩土加固理论的数值实现及地下工程应用[M].北京:煤炭工业出版社,2006.
[13]任强,杨春英,徐薇.地表沉降的双洞体叠加Peck公式及数值分析[J].安徽理工大学学报,2013,33(4):78-33.REN Qiang,YANG Chunying,XU Wei.The Peck formula and numerical analysis of surface subsidence caused by tunnel excavation [J].Journal of Anhui University of Science and Technology( Natural Science),2013,33(4):78-33.
[14]贾晓云,林宝龙.隧道开挖引起的路面沉降预测及数值分析[J].路基工程,2010(3):108-110.JIA Xiaoyun,LIN Baolong.Prediction and numerical analysis of pavement settlement due to tunnel excavation[J].Subgrade Engineering,2010(3):108-110.
[15]何川,李永林,林刚.连拱隧道施工全过程三维有限元分析[J].中国铁道科学,2005,26 (2):34-38.HE Chuan,LI Yonglin,LIN Gang.3D fem numerical analysis for the whole construction process of twin-bore tunnel[J].China Railway Science,2005,26 (2):34-38.
[16]王绍君,刘宗仁,陶夏新.浅埋暗挖隧道施工性态的数值模拟与分析[J].土木工程学报,2007,40 (6):75-79.WANG Shaojun,LIU Zongren,TAO Xiaxin.Numerical simulation and analysis of construction behavior of shallow tunneling by excavation[J].China Civil Engineering,2007,40 (6):75-79.
[17]唐剑,付淘,莫阳春.明月山隧道施工力学响应FLAC-3D数值模拟[J].路基工程,2008 (2):86-89.
[18]PECK R B.Deep excavations and tunneling in soft ground[C]// Proceedings of the 7th International Conference on Soil Mechanics and Foundation Engineering,Mexico:State of the Art Report,1969:225-290.