[1]邓磊.程潮铁矿西区崩落法转充填法过渡段开采方法研究[D].武汉:武汉科技大学,2015:9.
[2]江兵,吴姗.大冶铁矿崩落法转充填法过渡区开采技术研究[J].有色金属(矿山部分),2014,66(3):23-25.
JIANG Bing,WU Shan. Study on mining technology of transition zone from sublevel caving to backfilling method in Daye Iron Mine[J]. Nonferrous Metals(Mining Section),2014,66(3):23-25.
[3]贾太保. 露天转地下开采诱发环境破坏的动态预测[J]. 中国安全生产科学技术,2015,11(3):99-104.
JIA Taibao. The dynamic prediction of environment damage induced by the excavation from open-pit into underground mine[J]. Jouranl of Safety Science and Technology, 2015,11(3):99-104.
[4]何治良,王大国,李斌,等. 复杂应力条件下不同回采与充填阶段采场稳定性分析[J].金属矿山,2016(6):24-31.
HE Zhiliang,WANG Daguo,LI Bin,et al. Analysis of the stopes stability in different stages of stoping and filling under complicated stress condition[J]. Metal Mine,2016(6):24-31.
[5]张弛,范德强,陈昱,等. 香炉山钨矿高大采空区充填回采方法优化研究[J].有色金属工程,2014,4(3):59-61.
ZHANG Chi, FAN Deqiang,CHEN Yu,et al. Xianglushan tungsten large mined-out area filling stoping method optimization research [J].Nonferrous Metal Engineering,2014,4(3):59-61.
[6]安龙,徐帅,任少峰,等. 深部厚大矿体回采顺序设计及优化研究[J].东北大学学报(自然科学版),2013,34(11):1642-1646.
AN Long,XU Shuai,REN Shaofeng,et al. Study on design and optimization of miIling sequence for deep and large ore body[J].Journal of northeastern University(Natural Science),2013,34(11):1642-1646.
[7]周亮亮. 金山店铁矿深部充填采场结构参数和采场回采顺序研究[D].武汉:武汉科技大学,2014:46-53.
[8]许梦国,王明旭,王平,等. 基于安全系数评价的某矿回采顺序优化分析及高应力控制[J].化工矿物与加工,2013(13):24-29.
XU Mengguo,WANG Mingxu,WANG Ping,et al. Stoping sequence optimization analysis and high stress control based on evaluation of safety factors[J]. IM&P,2013(13):24-29.
[9]叶义成,施耀斌,王其虎,等. 缓倾斜多层矿床充填法开采围岩变形及回采顺序试验研究[J]. 采矿与安全工程学报,2015,32(3):407-413.
YE Yicheng,SHI Yaobin,WANG Qihu,et al. Experimental study of deformation of wall rock and stoping sequence in mining gently inclined and multilayer deposits by backfill mining[J]. Journal of Mining & Safety Engineering,2015,32(3):407-413.
[10]宋世生,郭明春,严鹏,等. 无底柱分段崩落采矿法在那林金矿的试验研究[J].黄金,2010,31(10):33-37.
SONG Shisheng,GUO Mingchunl,YAN Peng,et al. Experimental study on non-pillar sublevel caving mining method in Nalin gold mine[J].GOLD, 2010,31(10):33-37.
[11]王李管,任助理,潘传鹏,等.基于混合整数规划法的采场回采顺序优化分析[J].中国有色金属学报,2016,26(1):173-179.
WANG Liguan,REN Zhuli,PAN Chuanpeng,et al. Optimization analysis of stope mining sequence based on mixed integer programming[J].The Chinese Journal of Nonferrous Metals, 2016,26(1):173-179.
[12]杨桂通. 弹性力学[M].北京 :高等教育出版社,1998:148.
[13]裴明松. 程潮铁矿充填法和崩落法联合开采方案及地表稳定性研究[D].武汉:武汉科技大学,2016:38.