[1]张红武, 刘磊, 卜海磊,等. 尾矿库溃坝模型设计及试验方法[J]. 人民黄河,
2011, 33(12): 1-5.
ZHANG Hongwu, LIU Lei, BU Hailei, et al. Test and design of tailings dam
model[J]. Yellow River, 2011,33(12):1-5.
[2]赵天龙, 陈生水, 钟启明. 尾矿坝溃决机理与溃坝过程研究进展[J]. 水利水运
工程学报, 2015(1): 105-111.
ZHAO Tianlong, CHEN Shengshui, ZHONG Qiming. Advances in studies of tailing
dam break mechanism and process[J]. Hydro-Science and Engineering, 2015
(1): 105-111.
[3]张兴凯, 王启明. 相桂生. 金属非金属尾矿库安全现状及分析[J]. 中国安全生
产科学技术, 2006, 2(2): 60-62.
ZHANG Xingkai, WANG Qiming, XIANG Guisheng. Analysis of current safety
situation of metal and non-metal tailing pond[J]. Journal of Safety
Science and Technology, 2006,2(2): 60-62.
[4]张兴凯, 王云海, 廖国礼,等. 我国非煤矿山安全生产科技进展与科技需求分析[
J]. 中国安全生产科学技术, 2009, 5(3): 100-104.
ZHANG Xingkai, WANG Yunhai, LIAO Guoli, et al. Analysis on safety science
and technology development and requirement for Chinese non-coalmines[J].
Journal of Safety Science and Technology, 2009, 5(3): 139-143.
[5]刘洋, 齐清兰, 张力霆. 尾矿库溃决泥石流的演进过程及防护措施研究[J]. 金
属矿山, 2015, (12): 139-143.
LIU Yang, QI Qinglan, ZHANG Liting. Study on evolution of debris flow from
dam break and protection measures[J]. Metal Mine, 2015, (12): 139-143.
[6]楚金旺, 宋会彬, 张红武. 尾矿库漫顶溃坝模型试验研究[J]. 中国矿山工程,
2015, 44(3): 73-77.
CHU Jinwang, SONG Huibin, ZHANG Hongwu. Experimental study on tailing dam
break due to overtopping[J]. China Mine Engineering, 2015, 44(3): 73-77.
[7]张力霆, 齐清兰, 李强,等. 尾矿库坝体溃决演进规律的模型试验研究[J]. 水
利学报, 2016, 47(2): 229-235.
ZHANG Liting, QI Qinglan, LI Qiang, et al. Experimental model study on dam
break and evolution law of tailings pond[J].Journal of Hydraulic
Engineering, 2016, 47(2): 229-235.
[8]Fourie A B, Bouazza A, Lupo J, et al. Improving the performance of
mining infrastructure through the judicious use of geosynthetics
[C].Proceedings of the 9th International Conference on Geosynthetics.
Guaruja, 2010: 193-219.
[9]侯娟, 张孟喜, 张陶陶,等. 横-竖筋带布置对地基影响的试验研究[J]. 岩土力
学, 2011, 32(8): 2365-2370.
HOU Juan, ZHANG Mengxi, ZHANG Taotao, et al. Experimental research on effect
of horizontal-vertical reinforcement configurations on foundations[J].
Rock and Soil Mechanics, 2011, 32(8): 2365-2370.
[10]马庆宏, 朱大勇, 雷先顺,等. 加筋无黏性土斜坡地基承载力模型试验研究[J]
.岩石力学与工程学报, 2015, 34(5): 1049-1058.
MA Qinghong, ZHU Dayong, LEI Xianshun, et al. Laboratory modeling test on
bearing capacity of reinforced sand slopes[J]. Chinese Journal of Rock
Mechanics and Engineering,2015, 34(5): 1049-1058.
[11]胡耘, 张嘎, 刘文星,等. 土工织物加筋黏性土坡坡顶加载的离心模型试验研究
[J]. 岩土力学, 2011, 32(5): 1327-1332.
HU Yun, ZHANG Ga, LIU Wenxing, et al. Centrifuge modeling of geotextile-
reinforced cohesive soil slopes under surface loading[J]. Rock and Soil
Mechanics, 2011, 32(5): 1327-1332.
[12]张波, 石名磊. 粘土与筋带直剪试验与拉拔试验对比分析[J].岩土力
学,2005,26(增):61-64.
ZHANG Bo, SHI Ming-lei. Research on direct shear test and pullout test
between clay and geotextile[J]. Rock and Soil Mechanics, 2005, 26(S): 61-
64.
[13]唐建新, 尹光志, 魏作安,等. 龙都尾矿库细粒尾矿堆积坝模型试验研究[J].
中国矿业, 2004, 13(1): 54-56.
TANG Jianxin, YIN Guangzhi, WEI Zuoan, et al. Model test study about fine
grained tailings dam of Longdu tailings pone[J]. China Mining Magazine,
2004, 13(1): 54-56.
[14]尹光志, 魏作安, 万玲,等. 细粒尾矿堆积坝加筋加固模型试验研究[J]. 岩石
力学与工程学报, 2005, 24(6): 1030-1034.
YIN Guangzhi, WEI Zuoan, WAN Ling, et al. Test study on stability of fine
grained tailings dam in geo-grid reinforcement situation[J]. Chinese
Journal of Rock Mechanics and Engineering, 2005, 24(6): 1030-1034.
[15]孔宪京, 潘建平, 邹德高. 尾矿坝液化流动变形分析[J]. 大连理工大学学报,
2008, 48(4): 541-545.
KONG Xianjing, PAN Jianping, ZOU Degao. Analysis of liquefaction induced
flow deformation of tai lings dam[J]. Journal of Dalian University of
Technology, 2008, 48(4): 541-545.
[16]周燕锋. 土工格栅在尾矿坝工程的应用[J]. 福建建设科技, 2015(4):13-15.
ZHOU Yanfeng. The application of geogrid in tailings dam project[J].
Fujian Construction Science & Technology, 2015(4): 13-15.
[17]敬小非, 尹光志, 魏作安,等. 尾矿坝垮塌机制与溃决模式试验研究[J]. 岩石
力学与工程学报, 2011, 32(5): 1377-1404.
JING Xiaofei, YIN Guangzhi, WEI Zuoan, et al. Model experimental study of
collapse mechanism and broken mode of tailings dam[J]. Chinese Journal of
Rock and Soil Mechanics, 2011, 32(5): 1377-1404.
[18]朱湘, 黄晓明. 加筋路堤的室内模拟试验和现场沉降观测[J]. 岩土工程学报,
2002, 24(3): 386-388.
ZHU Xiang, HUANG Xiaoming. Laboratory simulating test and field settlement
observation of reinforced emban kment[J]. Chinese Journal of Geotechnical
Engineering, 2002, 24(3): 386-388.
[19]Wang Z Y, Melching C S, Duan X H, et al. Ecological and hydraulic
studies of step-pool systems[J]. Journal of hydraulic engineering-
ASCE,2009,134(9):705-717.
[1]李亮,孟浩,全超,等.上游式筑坝法尾矿坝的安全系数随堆筑坝高变化分析[J].中国安全生产科学技术,2011,7(7):31.
Li Liang,Meng Hao,Quan Chao,et al.Study on the variation of factor of safety with the dam height for the tailing dam from upstream embankment method[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2011,7(8):31.
[2]胡文志,马海涛,谢振华,等.三维高密度电法在尾矿库隐患检测中的应用[J].中国安全生产科学技术,2011,7(9):64.
HU Wen-zhi,MA Hai-tao,XIE Zhen-hua,et al.Application of three dimensional high-density resistivity method in hidden danger detection of Tailings[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2011,7(8):64.
[3]李明,梁力,王伟,等.用有限元强度折减法求解坝坡抗滑稳定安全系数[J].中国安全生产科学技术,2012,8(2):83.
LI Ming,LIANG Li,WANG Wei,et al.Study on antiskiding stability safety factor of dam slope by shear strength reduction finite element methods[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2012,8(8):83.
[4]李亮,褚雪松.浸润线深度对尾矿坝稳定性分析的影响研究[J].中国安全生产科学技术,2011,7(11):20.
LI Liang,CHU Xue-song.Study on the effect of phreatic line depth on the evaluation of slope stability for tailing dam[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2011,7(8):20.
[5]魏〓勇,许开立.集对分析法在尾矿坝稳定性安全评价中的应用[J].中国安全生产科学技术,2012,8(9):101.
WEI Yong,XU Kai li.Application of set pair analysis on safety evaluation of tailing dam stability[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2012,8(8):101.
[6]赵小稚.尾矿坝变形规律的灰色Verhulst预测[J].中国安全生产科学技术,2012,8(11):90.
ZHAO Xiao zhi.Grey verhulst prediction on the deformation law of tailing dam[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2012,8(8):90.
[7]胡平安,韩森.基于JC法尾矿坝稳定性可靠度研究[J].中国安全生产科学技术,2010,6(4):56.
HU Ping-an,HAN Sen.Reach on reliability of Tailing dam stability based on JC methed[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2010,6(8):56.
[8]马海涛,吴永锋,王云海,等.尾矿坝浸润线的坝面快速观测方法研究[J].中国安全生产科学技术,2010,6(1):31.
MA Hai-tao,WU Yong-feng,WANG Yun-hai,et al.Study on surface exploration meth of phreatic line of tailing dam[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2010,6(8):31.
[9]詹京晶,肖田元.基于GPS数据的尾矿坝监测系统的研究与应用[J].中国安全生产科学技术,2013,9(4):5.[doi:10.11731/j.issn.1673-193x.2013.04.001]
ZHAN Jing jing,XIAO Tian yuan.Research and application of monitoring system for tailings dam based on GPS data[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2013,9(8):5.[doi:10.11731/j.issn.1673-193x.2013.04.001]
[10]秦晓鹏,陈立宏,孙洪月,等.基于拟静力法和有限差分法的细砂尾矿坝动力稳定性分析与评价[J].中国安全生产科学技术,2013,9(12):46.[doi:10.11731/j.issn.1673-193x.2013.12.007]
QIN Xiao peng,CHEN Li hong,SUN Hong yue,et al.Analysis and evaluation on dynamic stability of sand tailings dam based on pseudostatic method and finite difference method[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2013,9(8):46.[doi:10.11731/j.issn.1673-193x.2013.12.007]