|本期目录/Table of Contents|

[1]王薇,邹江海,潘文硕,等.不同施工顺序对陡坡偏压小净距隧道围岩稳定性的影响研究[J].中国安全生产科学技术,2016,12(8):28-33.[doi:10.11731/j.issn.1673-193x.2016.08.005]
 WANG Wei,ZOU Jianghai,PAN Wenshuo,et al.Study on influence to stability of surrounding rock by different construction sequence for bias tunnel with small interval and steep slope[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2016,12(8):28-33.[doi:10.11731/j.issn.1673-193x.2016.08.005]
点击复制

不同施工顺序对陡坡偏压小净距隧道围岩稳定性的影响研究
分享到:

《中国安全生产科学技术》[ISSN:1673-193X/CN:11-5335/TB]

卷:
12
期数:
2016年8期
页码:
28-33
栏目:
学术论著
出版日期:
2016-08-30

文章信息/Info

Title:
Study on influence to stability of surrounding rock by different construction sequence for bias tunnel with small interval and steep slope
作者:
王薇邹江海潘文硕李师
(中南大学 土木工程学院,湖南 长沙 410075)
Author(s):
WANG Wei ZOU Jianghai PAN Wenshuo LI Shi
(School of Civil Engineering, Central South University, Changsha Hunan 410075, China)
关键词:
陡坡偏压施工顺序围岩稳定性安全性
Keywords:
steep slope bias construction sequence stability of surrounding rock safety
分类号:
X936
DOI:
10.11731/j.issn.1673-193x.2016.08.005
文献标志码:
A
摘要:
为了研究陡坡偏压条件下不同施工顺序对小净距隧道围岩稳定性的影响,结合工 程实例,考虑“先浅后深”与“先深后浅”两种施工顺序,通过有限元软件ABAQUS建立 三维弹塑性分析模型进行了施工全过程数值模拟,重点分析了不同施工顺序对地表边坡 、拱圈特征点围岩以及中夹岩柱的影响,并计算了不同施工顺序下的隧道开挖安全系数 。结果表明:先施工深埋侧隧道会加剧围岩整体偏压效应,并会对中夹岩柱处围岩产生 往返的扰动,不利于围岩稳定性的控制,且先开挖浅埋侧隧道的安全性高于先开挖深埋 侧隧道。
Abstract:
In order to study the influence of different construction sequence on the stability of surrounding rock for bias tunnel with small interval and steep slope, combined with engineering example, a model of 3D elasto plastic analysis was established through the finite element software ABAQUS considering two construction sequences of "shallow to deep" and "deep to shallow". The numerical simulation was conducted on the whole process of construction, and the influence of different construction sequence on surface slope, surrounding rock of arch characteristic points and middle rock pillar was analyzed emphatically, then the safety coefficients of tunnel excavation under different construction sequences were calculated. The results showed that the construction of deep buried side tunnel at first will intensify the whole bias effect of surrounding rock, and generate the back and forth disturbance to surrounding rock of middle rock pillar, which is not conducive to the control on stability of surrounding rock. The safety of excavation on shallow buried side tunnel at first is higher than that of excavation on deep buried side tunnel at first.

参考文献/References:

[1]赵丹,朱向前,彭立敏. 偏压连拱隧道施工顺序分析[J]. 西部探矿工程,2006 (3):141-144. ZHAO Dan,ZHU Xiangqian,PENG Limin. Construction sequence analysis of unsymmetrical double arch tunnel[J]. West-China Exploration Engineering,2006(3):141-144.
[2]杨小礼,眭志荣. 浅埋小净距偏压隧道施工工序的数值分析[J]. 中南大学学报( 自然科学版),2007, 38(4):764-770. YANG Xiaoli, SUI Zhirong. Numerical simulation of construction sequence for shallow embedded bias tunnels with small clear distance[J]. Journal of Central South University: Science and Technology, 2007, 38(4): 764-770.
[3]段慧玲,张林. 大跨度公路隧道合理开挖方法对比研究[J]. 土木工程学报,2009 (9):114-119. DUAN Huilin,ZHANG Lin.Comparative study of rational excavation methods for large-span highway tunnels[J]. China Civil Engineering Journal,2009 (9):114-119.
[4]杜菊红,黄宏伟. 偏压、错台小间距隧道施工位移场动态模拟分析[J]. 岩土力 学,2009(4):1102-1108. DU Juhong,HUANG Hongwei. Dynamic simulation analysis of displacement field of bias closely spaced tunnel with altitude difference[J]. Rock and Soil Mechanics,2009(4):1102-1108.
[5]刘小军,张永兴. 浅埋偏压隧道洞口段合理开挖工序及受力特征分析[J]. 岩石 力学与工程学报,2011(增1):3066-3073. LIU Xiaojun,ZHANG Yongxing. Analysis of reasonable excavation sequence and stress characteristics of portal section of shallow tunnel with unsymmetrical loadings[J]. Chinese Journal of Rock Mechanics And Engineering, 2011(S1):3066-3073.
[6]张运良,扶晓康. 浅埋小净距偏压隧道合理开挖顺序探讨[J]. 铁道科学与工程 学报,2013(5):57-63. ZHANG Yunliang,FU Xiaokang. Study on the reasonable excavation sequence of shallow embedded bias tunnels with small clear distance[J].Journal of Railway Science and Engineering,2013(5):57-63.
[7]梁勇旗,刘丰铭,刘新荣. 施工顺序对浅埋偏压黄土隧道稳定性的影响分析[J]. 地下空间与工程学报,2013(增2):1931-1935. LIANG Yongqi,LIU Fengming,LIU Xinrong. Analysis on influence of different construction sequences on stability of shallow-buried and unsymmetrically loaded loess tunnels[J]. Journal of Underground Space and Engineering, 2013(S2):1931-1935.
[8]聂善文,张端良,樊帅. 非对称连拱隧道不同开挖方案的比较分析[J]. 矿冶工程 ,2012(5):7-10. NIE Shanwen,ZHANG Duanliang,FAN Shuai. Comparative analysis of different excavation schemes for asymmetric double-arch tunnel[J]. Mining and Metallurgical Engineering ,2012(5):7-10.
[9]侯瑞彬,申玉生,陈明奎. 大跨小净距偏压隧道施工方案优化分析[J].公 路,2014(4):225-230. HOU Ruibin, SHEN Yusheng, CHEN Mingkui. Analysis of construction schemes optimization for largespan bias tunnels with small clear distance [J]. Highway,2014(4):225-230.
[10]陈力华,马亚梅,郭军. 复杂城区建筑偏压连拱隧道合理开挖顺序研究[J]. 公 路交通技术,2014(6):69-74. CHEN Lihua,MA Yamei,GUO Jun. Research on reasonable excavation sequence of multi-arch tunnel under building bias in complicated urban area stone base asphalt pavement structure[J]. Technology of Highway and Transport, 2014 (6):69-74.