[1]李劲.第三方物流安全的现状分析及展望[J].中国安全科学学报,2009,19(1):93-98.
LI Jin. Analysis and prospect on the status of the third-party logistics safety[J]. China Safety Science Journal, 2009, 19(1):93-98.
[2]M. Rahbar, M. Bagheri. Risk assessment framework for the rail transport of hazardous materials[J].Transportation Research Record: Journal of the Transportation Research Board, 2014, 2411(10):90-95.
[3]A.Soeanu, M. Debbabi, D. Alhadidi, et al. Transportation risk analysis using probabilistic model checking[J]. Expert Systems with Applications, 2015, 42(9): 4410-4421.
[4]S.Yan?k. Reverse logistics network design under the risk of hazardous materials transportation[J].Human and Ecological Risk Assessment, 2015, 21(5):1277-1298.
[5]程婕.铁路危险货物运输风险度量模型[J].中国安全科学学报,2010,20(11):130-133.
CHENG Jie. Risk assessment model for hazardous goods transport by railway[J].China Safety Science Journal, 2010, 20(11):130-133.
[6]杨能普,杨月芳,冯伟.基于模糊贝叶斯网络的铁路危险货物运输过程风险评估[J].铁道学报, 2014,36(7):8-15.
YANG Nengpu, YANG Yue fang, FENG Wei. Risk assessment of railway dangerous goods transport process based on fuzzy Bayesian network[J]. Journal of the China Railway Society, 2014, 36(7):8-15.
[7]王保国,王新泉.安全人机工程学[M].北京:机械工业出版社, 2009.
[8]杨迎心,冯志勇,饶国政.基于模糊综合评价构建物流运输预警模型[J].计算机应用,2011,31(10):2844-2848.
YANG Yingxin, FENG Zhiyong, RAO Guozheng. Early-warning model of logistics transport based on fuzzy comprehensive evaluation[J].Journal of Computer Applications, 2011,31(10):2844-2848.
[9]吴晓柠,袁旻态,田雷,等. 基于模糊综合法的高速公路危化品运输风险评价[A].中国环境科学学会学术年会论文集[C], 2015.
[10]霍明甲,张金梅,吴保意,等.渤海湾客滚船危险货物安全运输现状分析与对策[J].中国安全生产科学技术,2012,8(10):103-107.
HUO Mingjia, ZHANG Jinmei,WU Baoyi, et al. Analysis and countermeasure on safety transportation of dangerous goods carried by Ro /Ro passenger ships in Bohai gulf[J]. Journal of Safety Science and Technology, 2012,8(10):103-107.
[11]Jiang W, Qu F, Zhang L. Quantitative Identification and Analysis on Hazard Sources of Roof Fall Accident in Coal Mine [J]. Procedia Engineering, 2012, 45(8):83-88.
[12]M.M. Fouladgar. Risk evaluation of tunneling projects[J]. Archives of Civil and Mechanical Engineering, 2012, 12(1):1-12.
[13]Zeng J, An M, S. N J. Application of a fuzzy based decision making methodology to construction project risk assessment[J]. International Journal of Project Management, 2007, 25(6):589-600.
[14]吴金中,范文姬.危险货物道路运输风险评估体系研究[J].公路交通科技,2015,32(12):6-11.
WU Jinzhong, FAN Wenji. Risk evaluation system of dangerous goods transport[J].Journal of Highway and Transportation Research and Development, 2015,32(12):6-11.
[1]赵伟峰,汪伟忠,张国宝,等.危化品物流运输企业安全管理能力模型构建[J].中国安全生产科学技术,2016,12(7):150.[doi:10.11731/j.issn.1673-193x.2016.07.027]
ZHAO Weifeng,WANG Weizhong,ZHANG Guobao,et al.Construction of safety management capability model for logisticstransportation enterprise with dangerous chemical goods[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2016,12(4):150.[doi:10.11731/j.issn.1673-193x.2016.07.027]