|本期目录/Table of Contents|

[1]吴大伟,吴爱军,苏华友.大断面巷道中空预应力注浆锚杆的支护效果研究[J].中国安全生产科学技术,2015,11(8):90-95.[doi:10.11731/j.issn.1673-193x.2015.08.015]
 WU Da-wei,WU Ai-jun,SU Hua-you.Study on support effect of hollow pre-stress grouting anchor in large section roadway[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2015,11(8):90-95.[doi:10.11731/j.issn.1673-193x.2015.08.015]
点击复制

大断面巷道中空预应力注浆锚杆的支护效果研究
分享到:

《中国安全生产科学技术》[ISSN:1673-193X/CN:11-5335/TB]

卷:
11
期数:
2015年8期
页码:
90-95
栏目:
职业安全卫生管理与技术
出版日期:
2015-08-30

文章信息/Info

Title:
Study on support effect of hollow pre-stress grouting anchor in large section roadway
作者:
吴大伟 吴爱军 苏华友
(西南科技大学 环境与资源学院, 四川 绵阳 612060)
Author(s):
WU Da-wei WU Ai-jun SU Hua-you
(Environment and Resource College, Southwest University of Science & Technology, Mianyang Sichuan 612060, China)
关键词:
强构造应力大断面巷道中空预应力注浆锚杆主动支护砂浆饱满度
Keywords:
strong tectonic stress large section roadway hollow pre-stress grouting anchor initiative support plumpness of mortar
分类号:
X936
DOI:
10.11731/j.issn.1673-193x.2015.08.015
文献标志码:
A
摘要:
针对金川矿区大断面巷道在强构造应力作用下围岩变形严重的情况,提出了中空预应力注浆锚杆的支护工艺。通过数值计算得出以下结论:相比传统的普通砂浆锚杆支护工艺,采用中空预应力注浆锚杆支护工艺能够主动加固围岩,提高支护刚度;巷道两帮的变形减小了约14.56%,最大、最小主应力分别降低了4.4%和7.2%,粘结层破坏范围也随之减小。通过对支护后巷道变形监测发现:两帮最终变形量减小了约36.6%;通过抗拔实验,中空预应力注浆锚杆的抗拔力达到140kN,远大于普通砂浆锚杆的40kN抗拔力,中空预应力注浆锚杆有更好的支护效果。
Abstract:
Aiming at the serious deformation of surrounding rock under strong tectonic stress in large section roadway of Jinchuan mining area, the support technology with the hollow pre-stress grouting anchor was put forward. Through numerical calculation, the following conclusions were drawn. Comparing with the traditional supporting form with mortar bolt, the surrounding rock is passively reinforced and the support rigidity is enhanced by the support technology with the hollow pre-stress grouting anchor. The deformation in two-sides of the roadway are reduced by 14.56%, the maximum and minimum main stress are reduced by 4.4% and 7.2% respectively, and the damage range of bonding layer is decreased. According to the monitoring results on deformation of the roadway after supporting, it showed that the final deformation of the two-sides is reduced by nearly 36.6%. Through anti-pulling test, the pull-out resistance of hollow pre-stress grouting anchor is up to 140 KN, which is far greater than that of ordinary bolts, being as 40KN. The hollow pre-stress grouting anchor has better support effect.

参考文献/References:

[1]刘高, 韩文峰, 聂德新. 金川矿区地应力场特征[J].天津城市建设学院学报,2002,8(2):81-85 LIU Gao, HAH Wen-feng , NIE De-xin. Characterist ics of earth stress f ield of Jinchuan mine area[J]. Journal o f Tianjin Institute o f Urban Construction,2002, 8(2):81-85
[2]刘增辉, 高谦,姚维信,等.金川Ⅲ矿区破碎站硐室施工变形监测与优化控制[J].采矿与安全工程学报,2012,9(1):60-66 LIU Zeng-hui, GAO Qian, YAO Wei-xin, et al. Deformation monitoring and optimal control during chamber construction in Broken Station of Jinchuan No.3 Mine [J]. Journal of Mining & Safety Engineering,2012,9(1):60-66
[3]刘同有.金川岩石力学与工程地质的研究[J].岩石力学与工程学报,1996,15(2):115-121 LIU Tong-you. Onrockmechanicsand engineering geology in Jinchuan[J]. Chinese Journal of Rock Mechanics and Engineering, 1996, 15 (02):115-121
[4]宋恕夏,包四根.金川矿山地下工程地压特征及维护[J].岩石力学与工程学报,1991,10(2):138-148 SONG Shu-xia, BAO Si-gen. The ground pressure features and tunnel maintenance the Jinchuan mine[J]. Chinese Journal of Rock Mechanicsand Engineering, 1991,10(2):138~148
[5]曹平,王飞,邱冠豪,等.软岩大变形巷道支护技术及应用[J].中国安全生产科学技术,2014,10(8):69-74 CAO Ping,WANG Fei,QIU Guan-hao,et al.Support technology and its application for large deformation of soft rock roadway[J]. Journal of Safety Science and Technology,2014,10(8):69-74
[6]程良奎.中空型注浆锚杆与普通砂浆锚杆的工作性能比较[J].公路隧道,2004,(2):5-9 CHENG Liang-kui. The comparison of the working properties between the mortar Bolt and the Hollow pre-stress grouting anchor[J]. Highway Tunnel,2004,(2):5-9
[7]王同旭,王文斌, 杜烨,等.节理岩体巷道顶板预应力锚杆加固作用研究[J].中国矿业大学学报,2007,36(5): 618-621 WANG Tong-xu, WANG Wen-bin, DU Ye, et al. Research on pre-tensioned bolts reinforcing roadway roofin joint rock mass[J]. Journal of China University of Mining & Technology, 2007,36(5): 618-621
[8]王飞虎.地下洞室预应力锚杆支护机理及设计参数确定方法研究[D].西安:西安理工大学,2001
[9]侯朝炯,郭励生,勾攀峰.煤巷锚杆支护[M].徐州:中国矿业大学出版社,1999
[10]马念杰,侯朝炯.采准巷道矿压理论及应用[M].北京:煤炭工业出版社,1995
[11]付永刚,李英明,张瀚.大采高仰斜工作面玻璃纤维增强塑料锚杆煤壁加固技术及应用[J].中国安全生产科学技术,2013,9(6):5-10 FU Yong-gang,LI Ying-ming,ZHANG Han.Coal wall reinforcing technology and its application with FRP bolts in the rise mining with great mining height[J]. Journal of Safety Science and Technology,2013,9(6):5-10
[12]谢文兵,陈晓祥,郑百生.采矿工程问题数值模拟研究与分析[M].徐州:中国矿业大学出版社,2005
[13]陈善乐,汪华君,崔铁军.近距离煤层大断面切眼支护稳定周期分析[J].中国安全生产科学技术,2014,10(8):28-33 CHEN Shan-le,WANG Hua-jun,CUI Tie-jun.Stable period analysis of large section open-off cut support in close coal seam[J].Journal of Safety Science and Technology,2014,10(8):28-33

相似文献/References:

备注/Memo

备注/Memo:
西南科技大学博士研究基金项目(12zx7112)
更新日期/Last Update: 2015-09-06