[1]Hetenyi M.Beams on Elastic Foundation[M].Ann Arbor: The University of Michigan Press, 1946.
[2]Attewell P B, Yeates J, Selby A R.Soil Movements Induced by Tunnelling and Their Effects on Pipelines and Structures[M].London: Blackie and Son Ltd., 1986.
[3]赵坪锐,肖杰灵,刘学毅,等. 位移对无砟轨道扣件系统的影响分析[J],铁道学报,2008,30(5):6873
ZHAO Pingrui, XIAO Jieling, LIU Xueyi,et al. The influence of the displacement at bridge ends to the fastening systems used on ballast less tracks[J].Journal of the China Railway Society,2008,30(5):6873.
[4]张坤勇,王宇,艾英钵.任意荷载下管土相互作用解答[J].岩土工程学报,2010,(8):11891193
ZHANG Kunyong, WANG Yu, AI Yingbo.Analytical solution to interaction between pipelines and soils under arbitrary loads[J].Chinese Journal of Geotechnical Engineering,2010,(8):11891193 .
[5]姜玲,汪中卫,王旭东.隧道开挖引起地下管线竖向位移的初参数法求解[J].南京工业大学学报(自然科学版),2010,32(4):7276
JIANG Ling, WANG Zhongwei,WANG Xudong.Initial parameter method for solving vertical displacement of buried pipelines caused by tunnel excavation[J].Journal of Nanjing University of Technology,2010,32(4):7276.
[6]Pallab Ghosh.数值方法(C++描述)[M].徐士良,葛兵,徐艳,等译.北京:清华大学出版社,2008.
[7]M.库比切克,M.马雷克著.刘式达,刘式适,译.分岔理论和耗散结构的计算方法[M].北京:科学出版社,1990.
[8]张群,赵坪锐,刘学毅.路基不均匀沉降下双块式无砟轨道计算方法比较[J].四川建筑,2008,(5):130131
ZHANG Qun, ZHAO Pingrui, LIU Xueyi.Comparation of the calculation methods of the different settlement of subgrade on biblock ballastless track[J].Sichuan Architectural, 2008,(5):130131.
[9]高增增.路基不均匀沉降对双块式无砟轨道结构受力影响分析[J].中国铁路,2010,(7):7476
GAOZengzeng.The force analysis for the different settlement of subgrade on biblock ballastless track structures[J].Chinese Railways, 2010,(7):7476.
[10]李兴高、王霆. 刚性管线纵向应变计算及安全评价[J]. 岩土力学,2008,29(12):32993303+3306
LI Xinggao,WANG Ting. Longitudinal strain calculation and safety evaluation of rigid pipelines[J].
Rock and Soil Mechanics,2008,29(12):32993303+3306
[1]王震,贺农农.西安地铁工程安全文化的建立[J].中国安全生产科学技术,2011,7(5):159.
WANG Zhen,HE Nong-nong.Establishment of safety culture in Xi’an metro engineering[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2011,7(3):159.
[2]邓军,王萌.地铁火灾监控技术发展的德尔菲预见性分析[J].中国安全生产科学技术,2011,7(5):77.
Deng Jun,?Wang Meng.Delphi technology foresight analysis on development of the metro fire monitoring system[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2011,7(3):77.
[3]史聪灵,钟茂华,张岚,等.地铁换乘车站客流疏运模拟及风险分析(2)——单通道换乘车站[J].中国安全生产科学技术,2011,7(8):21.
SHI Cong-ling,ZHONG Mao-hua,ZHANG Lan,et al.Simulation and risk Analysis on passenger transportation of metro transfer station(2)——Single passage transferring Station[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2011,7(3):21.
[4]马骏.扩孔型锚固技术在西安地铁工程中的应用[J].中国安全生产科学技术,2011,7(9):195.
MA Jun.Anchor hole enlargement technology in Xi’an Subway Project[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2011,7(3):195.
[5]刘新军.西安地铁穿越地裂缝带支护结构设计研究[J].中国安全生产科学技术,2012,8(2):144.
LIU Xin jun.Design of support structure of Xi’an metro through ground fissure[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2012,8(3):144.
[6]郭雩,何理,石杰红,等.地铁不同人群疏散行为特征调查问卷研究[J].中国安全生产科学技术,2012,8(4):183.
GUO Yu,HE Li,SHI Jie hong,et al.Questionnaire research on the evacuation behavior characteristics
of different crowds in subway[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2012,8(3):183.
[7]雷斌,曹振,张宁.西安地铁安全文化体系建设研究[J].中国安全生产科学技术,2012,8(6):221.
LEI Bin,CAO Zhen,ZANG Ning.Study on system constructions of safety culture in Xi’an metro[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2012,8(3):221.
[8]史聪灵,钟茂华,汪良旗,等.地铁车站及隧道全尺寸火灾实验研究(2)
——区间隧道火灾[J].中国安全生产科学技术,2012,8(8):28.
SHI Cong ling,ZHONG Mao hua,WANG Liang qi,et al.Investigation of fullscale burning experiments in metro station and tunnel (2)
-interval tunnel fires[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2012,8(3):28.
[9]王垚,冯超.地铁车站深基坑围护桩优化及其数值分析[J].中国安全生产科学技术,2013,9(2):54.
WAGN Yao,FENG Chao.Numerical analysis and optimization on supporting piles in deep
foundation fit of metro station[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2013,9(3):54.
[10]史聪灵.地铁换乘车站客流疏运模拟及风险分析(1)-T型车站[J].中国安全生产科学技术,2011,7(4):11.
SHI-Cong-ling.Simulation and risk analysis on passenger transportation of metro transfer station(1)-T-type station[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2011,7(3):11.