[1]王刚,徐长航,陈国明.基于工作安全分析和风险矩阵法的自升式平台拖航作业风险评估[J].中国安全生产科学技术,2013,9(10):109-114.[doi:10.11731/j.issn.1673-193x.2013.10.020]
 WANG Gang,XU Chang hang,CHEN Guo ming.Risk assessment on towing operation of jackup platform based on job safety analysis and risk matrix method[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2013,9(10):109-114.[doi:10.11731/j.issn.1673-193x.2013.10.020]
点击复制

基于工作安全分析和风险矩阵法的自升式平台拖航作业风险评估
分享到:

《中国安全生产科学技术》[ISSN:1673-193X/CN:11-5335/TB]

卷:
9
期数:
2013年10期
页码:
109-114
栏目:
职业安全卫生管理与技术
出版日期:
2013-10-30

文章信息/Info

Title:
Risk assessment on towing operation of jackup platform based on job safety analysis and risk matrix method
作者:
王刚徐长航陈国明
(中国石油大学〈华东〉 海洋油气装备与安全技术研究中心, 山东青岛266580) 〖JZ)
Author(s):
WANG Gang XU Changhang CHEN Guoming
(Center for Offshore Engineering and Safety Technology, China University of Petroleum, Qingdao Shandong 266580, China)
关键词:
工作安全分析(JSA)风险矩阵自升式平台拖航作业风险评估
Keywords:
job safety analysis risk matrix jackup platform towing operation risk assessment
分类号:
X937; TE985
DOI:
10.11731/j.issn.1673-193x.2013.10.020
文献标志码:
A
摘要:
工作安全分析法(JSA)将所选择作业按顺序划分若干个步骤,对作业步骤逐步进行风险识别和分析,在工程中得到广泛应用。由于JSA法是一种定性风险分析方法,仅能从定性角度分析作业过程中存在的潜在风险,无法量化其可能性和严重度。将风险矩阵评估方法(Risk Matrix)引入JSA分析过程,结合自升式海洋平台拖航作业及行业评价指标特点,利用风险矩阵计算风险因素的风险度,提出控制和改进措施,得出不同作业步骤各类风险重要度和风险水平,为平台拖航作业安全保障提供指导依据。
Abstract:
As a widely used method, Job Safety Analysis (JSA) divides the job into several steps according to the order of operations, and then carries out risk identification and analysis to the job steps progressively. JSA is a qualitative risk analysis method and can only analyze the potential risks occurred in the process of a job. In order to acquire the quantitative results about the possibility and severity of an accident, the risk matrix evaluation method was introduced JSA analysis process. Based on the jackup platform towing operation and industry evaluation characteristics, the risk matrix was used to calculate the risk level of risk factors, and then the control and improvement measures were put forward. As a result, the importance and risk level of different job steps were presented as the guidance basis of the platform towing operation security.

参考文献/References:

[1]汪张棠, 赵建亭. 我国自升式钻井平台的发展与前景[J]. 中国海洋平台, 2008, 23(4):813 WANG Zhangtang, ZHAO Jianting. The development and foreground of the selfelevation drilling platform in our country[J]. China Offshore Platform , 2008, 23(4):813
[2]李红涛, 汪震宇. 拖航状态下自升式钻井平台桩腿结构强度分析[J]. 中国海洋平台, 2012, 27(4):1014 LI Hongtao, WANG Zhenyu. Research on leg structure analysis for selfelevating drilling units under transit condition[J]. China Offshore Platform, 2012, 27(4):1014
[3]Ophir Rozenfeld. Construction Job Safety Analysis[J]. Safety Science, 2010, (48):491498
[4]刘杰. 工作安全分析JSA模式在施工现场实践研究[J]. 中国安全生产科学技术, 2011, 7(9):190194 LIU Jie. Practicable research on job safety analysis format in construction project area[J]. Journal of Safety Science and Technology, 2011, 7(9):190194
[5]都书海. 工作安全分析在管理实践中的应用[J]. 中国安全生产科学技术, 2011, 7(7):204208 DOU Shuhai. Theory and application of JSA management in practice[J]. Journal of Safety Science and Technology, 2011, 7 (7):204208
[6]李凯, 张贤波. 工作安全分析法在游梁抽油机安装中的应用[J]. 职业安全, 2012,(1):98100 LI Kai, ZHANG Xianbo. The application of Job safety analysis in the installation of beam pumping unit[J]. Occupational Safety , 2012,(1):98100
[7]朱启超, 匡兴华, 沈永平. 风险矩阵方法与应用述评[J]. 中国工程科学, 2003, 5(1):8994 ZHU Qichao, KUANG Xinghua, SHEN Yongping. Risk matrix method and application of editorials[J]. Engineering Science, 2003, 5(1):8994
[8]Paul R, GarveyPR, Lansdowne ZF. Risk matrix: an approach for identifying, assessing, and ranking program risks [J]. Air Force Journal of Logistics, 1998, 25:1619
[9]Lansdowne Z F. Risk matrix: an approach for prioritizing risks and tracking risk mitigation progress [A]. Proceedings of the 30th Annual Project Management Institute 1999 Seminars & Symposium [C]. Philadelphia, USA, 1999
[10]James E. Roughton. Understanding Job Hazard Analysis[J]. Developing an Effective Safety Culture, 2002, Pages 294309
[11]罗多. 基于风险矩阵的PHA在矿山排土场安全评价中的应用[J]. 矿山机械, 2010, 38(4):3033 LUO Duo. Application of PHA based on risk matrix to the mine dump safety assessment[J]. Mining & Processing Equipment, 2010, 38(4):3033
[12]李凯宝. 近海石油自升式钻井平台拖航作业操作浅析[J]. 天津航海, 2009,(2):910 LI Kaibao. The analysis of offshore oil selfelevating drilling platform towing operations[J]. Tianjin Navigation, 2009,(2):910 〖FL)〖HJ〖HT〖ST〖WT

相似文献/References:

[1]张艳辉,陈晓春.改进的HAZOP风险评价方法[J].中国安全生产科学技术,2011,7(7):174.
 ZHANG Yan-hui,CHEN Xiao-chun.Improved HAZOP Risk Assessment Method[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2011,7(10):174.
[2]刘杰.工作安全分析(JSA)模式在施工现场实践研究[J].中国安全生产科学技术,2011,7(9):190.
 LIU Jie.The Practicable Research on Job Safety Analysis Format in Construction Project Area[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2011,7(10):190.
[3]曹涛,张华兵,周利剑,等.HAZOP在油气管道站场风险分析中的应用实践[J].中国安全生产科学技术,2011,7(10):129.
 CAO Tao,ZHANG Hua-bing,ZHOU Li-jian,et al.Application of HAZOP study in risk analysis of pipeline station[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2011,7(10):129.
[4]郑登锋,蒋金生,王明勇.基于风险矩阵和LOPA的风险评价系统在油气管道 的应用研究[J].中国安全生产科学技术,2012,8(10):76.
 ZHENG Deng feng,JIANG Jin sheng,WANG Ming yong.Study on application of risk evaluation system based on risk matrix and LOPA in oil and gas pipeline system[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2012,8(10):76.
[5]白永忠,蒋军成.HAZOP与风险矩阵组合技术应用研究[J].中国安全生产科学技术,2012,8(8):121.
 BAI Yong zhong,JIANG Jun cheng.Study on the application of combination technique by HAZOP and risk matrix[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2012,8(10):121.
[6]黄会伟,葛晓强,袁印实,等.HAZOP分析在酸性水汽提装置上的应用与研究[J].中国安全生产科学技术,2013,9(11):147.[doi:10.11731/j.issn.1673-193x.2013.11.025]
 HUANG Hui wei,GE Xiao qiang,YUAN Yin shi,et al.Application and research of HAZOP in sour water stripping unit[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2013,9(10):147.[doi:10.11731/j.issn.1673-193x.2013.11.025]
[7]王文和,易俊,沈士明.基于风险的城市埋地燃气管道安全评价模型及应用[J].中国安全生产科学技术,2010,6(3):163.
 WANG Wen-he,YI Jun,SHEN Shi-ming.Safety evaluation model and application for the urban buried gas pipeline based on risk[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2010,6(10):163.
[8]孙思衡,谢婷,谢志利,等.基于模糊综合评估理论的磁铁类玩具风险评估方法研究[J].中国安全生产科学技术,2016,12(9):152.[doi:10.11731/j.issn.1673-193x.2016.09.027]
 SUN Siheng,XIE Ting,XIE Zhili,et al.Research on risk assessment method of magnet toys based on fuzzy comprehen-sive evaluation theory[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2016,12(10):152.[doi:10.11731/j.issn.1673-193x.2016.09.027]
[9]付明福,张明星,朱晓曼,等.油气长输管道作业分级定量风险评价方法研究及应用[J].中国安全生产科学技术,2019,15(7):137.[doi:10.11731/j.issn.1673-193x.2019.07.022]
 FU Mingfu,ZHANG Mingxing,ZHU Xiaoman,et al.Research and application of quantitative risk assessment method for operation classification of oil and gas longdistance pipeline[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2019,15(10):137.[doi:10.11731/j.issn.1673-193x.2019.07.022]
[10]李玉峰,刘袁春,胡大山,等.基于风险矩阵的水电站项目风险分级评估方法研究——以乌东德水电站为例[J].中国安全生产科学技术,2020,16(1):130.[doi:10.11731/j.issn.1673-193x.2020.01.021]
 LI Yufeng,LIU Yuanchun,HU Dashan,et al.Study on risk classification assessment method of hydropower station project based on risk matrixTaking Wudongde hydropower station as example[J].JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY,2020,16(10):130.[doi:10.11731/j.issn.1673-193x.2020.01.021]

备注/Memo

备注/Memo:
山东省自然科学基金课题(ZR2010EQ029);国家自然科学基金课题(51079159)
更新日期/Last Update: 2013-10-30